You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DGPS-Based Trilateration Positioning Receiver
SBC: Swaszek Peter Topic: 07FH1Positioning and navigation have become a mainstay of everyday life in the U.S.; applications of interest include navigation of vehicles of all kinds, infrastructure mapping, and safety of life systems. Many of these recent applications have become possible through the GPS. With the recognized vulnerabilities of GPS, it is evident that equivalent backup systems must be developed. One possible so ...
SBIR Phase I 2008 Department of Transportation -
LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING
SBC: KVH INDUSTRIES, INC. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
OCEAN WAVE ENERGY CONVERTER
SBC: Ocean Wave Energy Co Topic: N/AMAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...
SBIR Phase I 1989 Department of Transportation -
LOW-COST TRAFFIC ALERT SYSTEM
SBC: Rannoch Corporation Topic: N/AALTHOUGH TECHNOLOGY IS AVAILABLE FOR ALL AIRCRAFT TO EQUIP WITH TCAS, GENERAL AVIATION (GA) IS NOT EAGER TO EQUIP FOR ECONOMIC AND POLITICAL REASONS. CURRENT SYSTEMS ARE SIMPLY TOO EXPENSIVE FOR GA, AND GA OPPOSES ANYTHING REMINISCENT OF "BIG BROTHER" TRACKING MOVEMENTS THROUGH TERMINAL AREAS. THE OBJECTIVE IS TO MAKE A SYSTEM AVAILABLE TO GA THAT IS LOW-COST, THAT WILL APEAL TO GA USERS, AND IMPR ...
SBIR Phase I 1993 Department of Transportation -
STUDY AND EVALUATION OF FIBER REINFORCED DOWELL BARS FOR USEIN HIGHWAYS
SBC: Etc Engineers Inc. Topic: N/AN/A
SBIR Phase I 1989 Department of Transportation