You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Opaque Armor Materials and Manufacturing Methods
SBC: CORVID TECHNOLOGIES, LLC Topic: SOCOM14003Corvid Technologies is proposing an inconspicuous armor solution for SOCOM NSCVs that will offer less costly installation than the current steel shell. This effort will benefit from Corvid"s experience in rapid development of specialized low cost armor systems. Armor coverage of the vehicle will be complete, providing multi-hit STANAG 4569 Level II protection while also reducing weight. Integr ...
SBIR Phase I 2014 Department of DefenseSpecial Operations Command -
Data Fusion Approach for the Effective Inspection of Prestressed Concrete
SBC: FDH Engineering Inc. Topic: 141FH1While many inspection technologies are available to find corrosion in steel tendons of prestressed concrete, no single technology has shown consistent results over the wide range of prestressed structures and inspection settings that are required from the bridge infrastructure market. However, a new NDE method – Nonlinear Impact Resonance Spectroscopy (NIRS) – shows promise in identifying corr ...
SBIR Phase I 2014 Department of Transportation -
DGPS-Based Trilateration Positioning Receiver
SBC: Swaszek Peter Topic: 07FH1Positioning and navigation have become a mainstay of everyday life in the U.S.; applications of interest include navigation of vehicles of all kinds, infrastructure mapping, and safety of life systems. Many of these recent applications have become possible through the GPS. With the recognized vulnerabilities of GPS, it is evident that equivalent backup systems must be developed. One possible so ...
SBIR Phase I 2008 Department of Transportation -
INFORMATION DISPLAY STRUCTURES
SBC: Allotech Inc Topic: N/ATHIS PROPOSAL IS TO STUDY THE FEASIBILITY OF APPLYING THEORETICAL MODELS OF PERCEPTUAL PROCESSING IN HUMANS TO ESTABLISH BETTER COMMUNICATION OF INFORMATION TO HUMANS FROMTHEIR TECHNOLOGICAL ENVIRONMENT. THIS STUDY WILL DRAW ON THE LITERATURE OF PERCEPTUAL AND NEUROPHYSIOLOGICAL INFORMATION. IT WILL INCLUDE THEORETICAL WORK AND DEMONSTRATION DISPLAYS. THREE AREAS WILL BE CONSIDERED: 1) OPTIMIZING ...
SBIR Phase I 1989 Department of Transportation -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: N/ACities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...
SBIR Phase I 2008 Department of Transportation -
OCEAN WAVE ENERGY CONVERTER
SBC: Ocean Wave Energy Co Topic: N/AMAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...
SBIR Phase I 1989 Department of Transportation -
FIBEROPTIC VISION SYSTEM FOR HEAVY VEHICLES
SBC: Triangle Research and Development Corporation Topic: N/AN/A
SBIR Phase I 1989 Department of Transportation