You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low-cost Low-power Wireless Sensor Network Based Highway Incident Detection & Warning System
SBC: Central Signal LLC Topic: 07FH4More that 52% of the U.S. highway congestion in urban areas is a direct result of highway incidents. Federal and State transportation authorities are searching for quick, low-cost and efficient highway incident detection and warning systems. Several solutions have been proposed but none could meet the requirements of transportation authorities. Central Signal, funded by federal agencies, has done ...
SBIR Phase I 2008 Department of Transportation -
DGPS-Based Trilateration Positioning Receiver
SBC: Swaszek Peter Topic: 07FH1Positioning and navigation have become a mainstay of everyday life in the U.S.; applications of interest include navigation of vehicles of all kinds, infrastructure mapping, and safety of life systems. Many of these recent applications have become possible through the GPS. With the recognized vulnerabilities of GPS, it is evident that equivalent backup systems must be developed. One possible so ...
SBIR Phase I 2008 Department of Transportation -
OCEAN WAVE ENERGY CONVERTER
SBC: Ocean Wave Energy Co Topic: N/AMAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...
SBIR Phase I 1989 Department of Transportation