You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. DGPS-Based Trilateration Positioning Receiver

    SBC: Swaszek Peter            Topic: 07FH1

    Positioning and navigation have become a mainstay of everyday life in the U.S.; applications of interest include navigation of vehicles of all kinds, infrastructure mapping, and safety of life systems. Many of these recent applications have become possible through the GPS. With the recognized vulnerabilities of GPS, it is evident that equivalent backup systems must be developed. One possible so ...

    SBIR Phase I 2008 Department of Transportation
  2. OCEAN WAVE ENERGY CONVERTER

    SBC: Ocean Wave Energy Co            Topic: N/A

    MAJOR AIDS TO NAVIGATION (ATON) ARE ESSENTIAL SIGNPOSTS FOR SAFE PASSAGE ALONG COASTAL AND OFFSHORE SEAWAYS. PRESENTLY, THEIR SIGNALS ARE POWERED BY ON-SITE ENGINE GENERATORS REQUIRING CONSIDERABLE AND COSTLY MAINTENANCE. ATON AUTONOMY WILL BE GREATLY INCREASED WITH DEEP DISCHARGE BATTERY TECHNOLOGY PROVIDING THAT ON-SITE CHARGING SOURCES ARE USED. AMONG NATURALLY AVAILABLE SOURCES, THE UNCEASING ...

    SBIR Phase I 1989 Department of Transportation
  3. STRESSMETER FOR MEASURING DYNAMIC BRIDGE STRESSES

    SBC: Re/spec Inc            Topic: N/A

    A NEED EXISTS FOR A COMPACT, PORTABLE SYSTEM CAPABLE OF MEASURING DYNAMIC STRESSES INDUCED BY HEAVY TRUCKS IN THE STRU- TURAL MEMBERS OF BRIDGES. USE OF STATE-OF-OF THE-ART ELEC- TRONIC CIRCUITRY NOW ALLOWS CONSTRUCTION OF A HYBRID ANALOG-DIGITAL INDICATOR THATCAN DISPLAY THE PEAK STRESSES A BRIDGEEXPERIENCES BY USING DATA FROM STRAIN SENSORS ATTACHED TO THE BRIDGE. THE FEASIBILITY OF BUILDING SUC ...

    SBIR Phase I 1988 Department of Transportation
US Flag An Official Website of the United States Government