You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent Automatic Serial Sectioning using Ultra Short Pulse Laser Polygon Scanning

    SBC: AEROCYONICS, INC.            Topic: DMEA211002

    Serial sectioning of microelectronics, as needed for performing destructive, high-resolution reverse engineering and   failure analysis, faces several challenges, due to the ever-growing miniaturization of features of interest. Some of these challenges are as follows: (1) Current methods of delayering require access to multiple pieces of mechanical equipment such as semi-automated polishing mach ...

    SBIR Phase I 2021 Department of DefenseDefense Microelectronics Activity
  2. Intelligent Ultrafast Laser System for Inspection of Microelectronics

    SBC: AEROCYONICS, INC.            Topic: DMEA192002

    Detecting counterfeit electronics is an important area of rising concern for DOD, other federal agencies and the private sector. The advent of cloned chips has called for development of new inspection tools that are capable of inspecting microelectronics down to the nanometer length scale. The state-of-the-art technology in Microscopy currently lacks a one-size-fits-all microelectronics inspection ...

    SBIR Phase I 2020 Department of DefenseDefense Microelectronics Activity
  3. Automated In-situ Large-area De-processing of ICs with High Throughput

    SBC: MICRONET SOLUTIONS INC.            Topic: DMEA18B001

    Phase II is the continuing effort to demonstrate the feasibility of producing an automated delayering and imaging system with end point detection, material density detection with built in neural network error correction. This process, coined fast Automated Delayering-Image Capture System (ADICS) leverages off of the existing Pix2Net which is a proven automated imaging 3D microchip reconstruction s ...

    STTR Phase II 2020 Department of DefenseDefense Microelectronics Activity
  4. Automated In-situ Large-area De-processing of ICs with High Throughput

    SBC: MICRONET SOLUTIONS INC.            Topic: DMEA18B001

    The objective of this proposal is to demonstrate the feasibility of producing an automated delayering and imaging system with end point detection, material density detection with built in neural network error correction. This process, coined fast Automated Delayering-Image Capture System (ADICS) leverages off of the existing Pix2Net which is a proven automated imaging 3D microchip reconstruction ...

    STTR Phase I 2019 Department of DefenseDefense Microelectronics Activity
  5. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  7. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  10. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government