You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SIGMA: Speedy Imagery Geo-registration and Motion Analysis
SBC: VISION SYSTEMS INC Topic: AF131151ABSTRACT: VSI proposes the development of the SIGMA (Speedy Imagery Geo-registration and Motion Analysis) system, which will address three key requirements by the end of Phase II: (i) adapt to different type of sensors, sensor-configurations and sensor operating conditions, (ii) handle large amount of data in real-time or close to real-time using limited resources, and (iii) operate under conditi ...
SBIR Phase II 2015 Department of DefenseAir Force -
Prediction and Measurement of the Carbon Build-Up in Film-Cooled Rocket Engines
SBC: SIERRA ENGINEERING, INC. Topic: AF15AT21ABSTRACT: Sierra Engineering Inc. (Sierra) believes that existing chemical kinetic models can be efficiently incorporated into commercial CFD codes to predict the mixing, pyrolysis, soot formation and carbon deposition within film cooled rocket engines. During this Phase I STTR effort we will demonstrate that this analysis capability is practical and that we can generate appropriate model validati ...
STTR Phase I 2015 Department of DefenseAir Force -
Tool to Assess State of Digital System after Electromagnetic Disruption
SBC: Embedezyne LLC Topic: AF151010ABSTRACT: Commercial off the shelf (COTS) electronic components have long been used by many companies in a wide range of industries to assist in their day to day operations. Most companies today use COTS computer workstations, servers, and networking devices in one form or fashion. While cost effective, COTS components are not required to adhere to strict Electromagnetic Compatibility (EMC) standa ...
SBIR Phase I 2015 Department of DefenseAir Force -
Modular, Low Cost Fixture for Evaluating OML Treatments for Stress-Strain Loading During Environmental Conditioning
SBC: Material and Process Solutions, LLC Topic: AF141167ABSTRACT:Material and Process Solutions LLC will build a modular, outer mold line (OML) gap fatigue test fixture that can be used to predict the overall lifetime of a complete OML stack-ups (gap filler and coatings) used on aircraft.We will evaluate two complete OML stack-ups at three conditions: no exposure, and both sequential and concurrent environmental conditioning and fatigue testing.The mod ...
SBIR Phase II 2015 Department of DefenseAir Force -
IGF OT IGF A STAGE BASED MOBILE INTERVENTION FOR SUBSTANCE USE DISORDERS IN PRIMARY CARE N DA POP SEPTEMBER FEBRUARY BASE AWARD
SBC: Pro-Change Behavior Systems, Inc. Topic: NIDANot Available
SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health -
IGF OT IGF VALIDATION OF MOBILE TECHNOLOGIES FOR CLINICAL ASSESSMENT
SBC: Pro-Change Behavior Systems, Inc. Topic: NCINot Available
SBIR Phase II 2015 Department of Health and Human ServicesNational Institutes of Health -
IGF OT IGF FY IWIN NAVIGATING YOUR PATH TO WELL BEING SBIR PHASE II BASE AWARD PERIOD OF PERFORMANCE
SBC: Pro-Change Behavior Systems, Inc. Topic: NIDANot Available
SBIR Phase II 2015 Department of Health and Human ServicesNational Institutes of Health -
Multi-Source E-Beam kV X-Ray Tube for Image-Guided Radiotherapy
SBC: Telesecurity Sciences, Inc. Topic: 102DESCRIPTION provided by applicant This project will lead to the development of an optimized X ray tube with focal spots that can be placed immediately below and around the multi leaf collimator MLC of a radiotherapy system By steering a focused electron beam e beam on a series of cooled tungsten targets in sequence this system will provide a set of projection images that can be reco ...
SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health -
Therapeutic Role of Inter-alpha Inhibitors in Wound Healing
SBC: PROTHERA BIOLOGICS, INC. Topic: NIAMSDESCRIPTION provided by applicant Wound healing is an intricately regulated process broadly characterized by phases of inflammation proliferation and remodeling Imbalances in any one of these phases can result in inadequate healing scar formation or in the development of chronic wounds such as diabetic ulcers Diabetic ulcers are responsible for the majority of lower extremity amputations ...
SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health -
Novel, Ambulatory Cuff-less Non-invasive Arterial Blood Pressure Monitor
SBC: Krisara Engineering Topic: NHLBIDESCRIPTION provided by applicant The objective of this proposal is to complete the engineering development and testing of the Non Invasive Self calibrating Ambulatory Multi Modality NISAM blood pressure device to recognize hypertensive patients not currently identified using todayandapos s technology As well as providing better management of hypertensive patients by presenting a truer roun ...
SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health