You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SIMULTANEOUS ENGINEERING AUTOMATION

    SBC: Aquidneck Management Associate            Topic: N/A

    A NEW GENERATION OF ENGINEERING AND MANUFACTURING AUTOMATION DESIGNTOOLS ARE NOW EMERGING AS A RESULT OF THE PIONEERING WORK THAT HAS BEEN DONE IN OBJECTORIENTED PROGRAMMING TECHNOLOGY. UNLIKE CONVENTIONAL PROCEDURAL LANGUAGE APPROACHES, THE OBJECT-ORIENTED PROGRAMMING APPROACH ALLOWS DATA STRUCTURES AND PROCEDURES TO BE DEFINED FOR GENERIC CLASSES OF OBJECTS. SYSTEM PERFORMANCE, RNA, AND COST DAT ...

    SBIR Phase I 1991 Department of DefenseNavy
  2. OMNIDIRECTIONAL CIRCULARLY-POLARIZED CONFORMAL MICROSTRIP ANTENNAS

    SBC: Boulder Microwave            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseNavy
  3. SUBMARINE COMBAT SYSTEM OPERATOR TRAINING WORKSTATION CONCEPTS

    SBC: Business And Engineering Tech            Topic: N/A

    THIS TASK WILL IDENTIFY THE ISSUES CONCERNING COMBAT SYSTEM TRAINING REQUIREMENTS. IN ADDITION TO FUNCTIONAL NEEDS, THE ISSUES OF EASE OF SYSTEM UPGRADES AND RAPID PROTOTYPING WILL BE ADDRESSED. INITIAL INPUT DATA WILL BE OBTAINED FROM NAVAL TRAINING PLANS, AND EXISTING TRAINING DEVICE CAPABILITIES. THIS WILL IDENTIFY THE LEVELS OF REQUIRED TRAINING AND THE SKILLS THAT MUST BE TAUGHT. A WORKSTATIO ...

    SBIR Phase I 1991 Department of DefenseNavy
  4. SUBMARINE COMBAT SYSTEM ARCHITECTURE WITH WORKSTATIONS

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    CURRENT SUBMARINE COMBAT SYSTEM ARCHITECTURES REFLECT A WEAK LINKAGE FROM OPERATIONAL REQUIREMENTS TO IMPLEMENTATION. ARCHITECTURES RANGE FROM THOSE WITH LARGE CENTRAL COMPUTERS TO THOSE WITH CLUSTERED DISTRIBUTED PROCESSORS. SINGLE POINTS OF FAILURE, DATA BOTTLENECKS, AND PROCESSOR CONFLICTS RESULT FROM ARCHITECTURES THAT DO NOT HAVE OPERATIONAL REQUIREMENTS AS THEIR BASIS. THE EFFORT PROPOSED US ...

    SBIR Phase I 1991 Department of DefenseNavy
  5. COMBINED MODELS FOR COMBAT SYSTEM ASSESSMENT

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    TACTICAL PERFORMANCE, RELIABILITY, AND COST ARE COMPLIMENTARY FACTORS IN SYSTEM DESIGN BUT THERE IS NO ONE TOOL TO EFFECTIVELY COMPARE ATTRIBUTES IN THESE DISPARATE DISCIPLINES. THERE ARE COMPUTER PROGRAMS TO ESTIMATE SYSTEM PERFORMANCE AGAINST THE THREAT, COMPUTER MODELS TO PREDICT RELIABILITY IN A GIVEN ENVIRONMENT, AND COST MODELS TO ESTIMATE BOTH ACQUISITION AND OPERATIONS OVER TH6 LIFE OF A S ...

    SBIR Phase I 1991 Department of DefenseNavy
  6. HF POWER SUPPLY FOR SUBMARINE COMBAT SYSTEMS

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    RELIABLE AND CONTINUOUS POWER TO SUBMARINE ELECTRONICS IS ESSENTIALFOR MISSION EXECUTION AND FOR THE SAFE OPERATION OF THE SHIP. DIGITAL ELECTRONICS CANNOT CONTINUE OPERATION THROUGH EVEN VERY SHORT POWER OUTAGES CAUSE BY BUS TRANSFER DEVICES, THAT HAVE HISTORICALLY BEEN SUFFICIENT FOR ANALOG COMBAT SYSTEMS. THE RESTART AND RELOAD THAT A DIGITAL SYSTEM MUST EXECUTE AFTER A SHORT POWER INTERRUPTION ...

    SBIR Phase I 1991 Department of DefenseNavy
  7. SYNTHESIS OF FERROELECTRIC LIQUID CRYSTAL POLYMERS FOR NON-LINEAR OPTICS

    SBC: Displaytech Incorporated            Topic: N/A

    VIRTUALLY ALL MATERIALS CURRENTLY USED FOR SECOND-ORDER NON-LINEAR OPTICAL (NLO) APPLICATIONS ARE CRYSTALLINE. ALTHOUGH THEY HAVE HIGH NLO SUSCEPTIBILITIES, LARGE CRYSTALS HAVE THE DISADVANTAGES OF BEINGBOTH DIFFICULT TO GROW AND SHOCKSENSITIVE. FERROELECTRIC LIQUID CRYSTALS (FLCS) CAN SELF-ASSEMBLE INTO MATERIALS CAPABLE OF NLO ACTIVITY, AND ARE ALSO EASILY MODIFIED. THE FLCS MADE TO DATE HAVE MO ...

    SBIR Phase I 1991 Department of DefenseNavy
  8. QPSK AND MPSK TRANSMISSION AND RECEIVING EQUIPMENT

    SBC: Joint Venture:navsys Corp/sc S            Topic: N/A

    TODAYS TELEMETRY SYSTEMS USE BINARY FREQUENCY SHIFT KEYING (BFSK) MODULATION. THIS MODULATION FORMAT PROVIDES GOOD NOISE IMMUNITY AND IS EASY TO IMPLEMENT. HOWEVER, REQUIREMENTS FOR HIGHER DATA RATES MANDATES THE USE OF MORE BANDWIDTH EFFICIENT MODULATION FORMATS. QUADRATURE PHASE SHIFT KEYING (QPSK) IS FOUR TIMES MOREBANDWIDTH EFFICIENT THEN NON-COHERENT BFSK MODULATION. THE PROPOSED STUDY WILL E ...

    SBIR Phase I 1991 Department of DefenseNavy
  9. AUTOMATIC CALIBRATION ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR SYSTEM

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO DEVELOP A TOP LEVEL DESIGN FOR AN ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR, WITH AN AUTOMATIC CALIBRATION CAPABILITY. THE PROPOSED ELECTROMAGNETIC SENSOR WILL CONNECT TO AN INTERFACE BOX COMPATIBLE WITH MIL-STD 1553 REQUIREMENTS.IT WILL FUNCTIONALLY AND PHYSICALLY REPLACE THE MAGNETIC SENSORS ON THE U.S. NAVY'S MA-1, S/AHRS, EXISTING AIR FORCE SYSTEMS AND THE PROPOSED C/ ...

    SBIR Phase II 1991 Department of DefenseNavy
  10. TARGET DRONE CONTROL VIA SATELLITE

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    EXISTING RANGES ARE FACED WITH THE REQUIREMENT TO TEST WEAPONS OF INCRESED COMPLEXITY, RANGE, AND FIREPOWER. PRESENT RANGES ARE INCREASING AFFECTED BY COMMERICAL AND RECREATIONAL ACTIVITIES. THE SOLUTION IS THE WORLD RANGE CONCEPT OF USING THE LARGE OCEAN AREAS FOR TEST AND TRAINING OPERATIONS. TODAY-S SHORE BASED RANGE FACILITIES AND LABORATORIES CONSTITUTE A SIGNIFICANT INVESTMENT. THE GOAL OF W ...

    SBIR Phase I 1991 Department of DefenseNavy
US Flag An Official Website of the United States Government