You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A TECHNOLOGY CLASSIFICATION AID FOR ARTIFICAL INTELLIGENCE

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    ARTIFICIAL INTELLIGENCE RESEARCH HAS PROGRESSED TO THE POINT WHERE IT HAS PRODUCED A WIDE RANGE OF APPLICATIONS, TOOLS AND TECHNIQUES. TO ASSURE THAT THESE SYSTEMS WILL RELIABLY PERFORM WILL REQUIRE THE DEVELOPMENT OF ADVANCED TESTING PROCEDURES. THIS PROPOSAL DETAILS A PLAN FOR ORGANIZING ARTIFICIAL INTELLIGENCE KNOWLEDGE AND BUILDING SOFTWARE TOOLS WHICH USE THIS KNOWLEDGE AS A FIRST STEP TOWARD ...

    SBIR Phase I 1991 Department of DefenseArmy
  2. KNOWLEDGE BASE DEVELOPMENT FOR ROTORCRAFT PILOT-VEHICLE INTERFACE

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    A SIGNIFICANT LEVEL OF EFFORT HAS BEEN DEDICATED TO THE DEVELOPMENT OF SOPHISTICATED DECISION AIDS FOR THE ADVANCED COCKPIT OF THE 1990'S AND BEYOND. THE GOAL OF MUCH OF THIS WORK HAS BEEN TO EQUIP THE FUTURE PILOT OF A MULTI-MISSION AIRCRAFT WITH THE LEVEL OF TACTICAL, AVIONICS, AND MISSION SUPPORT NOW ONLY POSSIBLE IN MULTI-MAN COCKPITS. USE OF ADVANCED ARTIFICIAL INTELLIGENCE SYSTEMS, MELDED IN ...

    SBIR Phase I 1991 Department of DefenseArmy
  3. A GENERALIZED VIDEO DATA COMPRESSION MODEL

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  4. KNOWLEDGE BASE DEVELOPMENT FOR ROTORCRAFT MISSION PLANNER

    SBC: FAAC INCORPORATED            Topic: N/A

    THE PROPOSED EFFORT IS TO DEVELOP A CONCEPT AND A PLAN FOR FURTHER DEVELOPMENT FOR AN IMPROVED METHODOLOGY OF THREAT ASSESSMENT/ POTENTIAL FOR USE BY THE D/NAPS MISSION PLANNER. THE PROPOSED APPROACH IS TO USE THE THREAT EXPERT ANALYSIS SYSTERM (TEAS) CONCEPT DEVELOPED UNDER CONTRACT TO WPAFB AS A STARTING POINT FOR DEVELOPMENT OF A MISSION PLANNER ALGORITHM. TEAS IS DESIGNED TO PROVIDE FIGHTER AI ...

    SBIR Phase I 1991 Department of DefenseArmy
  5. KNOWLEDGE ELICITATION STRATEGIES FOR MODELING INSTRUCTIONAL EXPERTISE

    SBC: KLEIN ASSOC., INC.            Topic: N/A

    THE INTRODUCTION OF ARTIFICIAL INTELLIGENCE INTO COMPUTER-BASED INSTRUCTION (CBI) PROMISED THE POSSIBILITY OF SOPHISTICATED SYSTEMS THAT COULD PROVIDE ONE-ON-ONE INSTRUCTION EFFICIENTLY AND ECONOMICALLY. UNFORTUNATELY, EFFORTS TO DEVELOP SYSTEMS THAT REPRESENT INSTRUCTIONAL EXPERTISE HAVE BEEN LARGELY DISAPPOINTING. WHETHER DUE TO THE LACK OF WELL-DEVELOPED MODELS OF INSTRUCTIONAL EXPERTISE, OR TH ...

    SBIR Phase I 1991 Department of DefenseArmy
  6. APPLICATION OF AN EXPERTISE-CENTERED TAXONOMY TO TRAINING DECISIONS

    SBC: KLEIN ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. SELF PROPAGATING HIGH TEMPERATURE SYNTHESIS AND DYNAMIC COMPACTION OF TITANIUM CARBIDE (TIC) TITANIUM BORIDE (TIB2)

    SBC: Kms Fusion Inc            Topic: N/A

    SELF PROPAGATING HIGH TEMPERATURE SYNTHESIS (SHS) OF TIC AND TIB2 RESULTS IN A HOT POROUS PRODUCT. IF THE TEMPERATURE OF THE PRODUCT EXCEEDS THE DUCTILE-BRITTLE TRANSITION TEMPERATURE, THE HOT PRODUCT CAN BE COMPACTED TO REDUCE POROSITY AND YIELD A CONSOLIDATED BODY WITH USEFUL STRUCTURAL PROPERTIES. SEVERAL COMPACTION TECHNIQUES HAVE BEEN CONSIDERED. AMONG THESE, EXPLOSIVELY GENERATED DYNAMIC COM ...

    SBIR Phase I 1991 Department of DefenseArmy
  8. HIGHLY VERSATILE HOLOGRAPHIC IMAGING SYSTEM FOR PLUME PARTICULATES (HISPP)

    SBC: Kms Fusion Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  9. A SINUSOID-FREE SPREAD SPECTRUM COMMUNICATIONS SYSTEM EMPLOYING PURE NOISE AS A CARRIER

    SBC: NOVA ENGINEERING, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. 2D RASTER TO 3D VECTOR MODELING UTILITIES

    SBC: Pioneer Technology Inc            Topic: N/A

    THE PURPOSE OF THIS PROPOSAL IS TO DEMONSTRATE THE FEASIBILITY IN DEVELOPING A BI-DIRECTIONAL (2 WAY) CADD TRANSLATOR BETWEEN DSREDS SYSTEMS (2D RASTER) AND THE INTERGRAPH CADEM SYSTEM. THE DEVELOPMENT OF SUCH A TRANSLATOR WILL GREATLY REDUCE THE MANPOWER WASTE AND DUPLICATION OF EFFORT THAT ARE INHERIT IN THE CURRENT METHODOLOGY USED. DUE TO PIONEER TECHNOLOGY EXTENSIVE EXPERIENCE WITH THE INTERG ...

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government