You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
MOORED INSTRUMENT HIGH SPEED ACOUSTIC TELEMETRY SYSTEM
SBC: Datasonics, Inc. Topic: N/ATHERE IS A REQUIREMENT FOR A RELIABLE, SECURE METHOD FOR RETRIEVAL OF DATA FROM MOORED INSTRUMENTATION ARRAYS. THESEARRAYS, WHICH CONTAIN CURRENT METERS, TIDE GAUGES, TEMPERATURE SENSORS, AND OTHER OCEANOGRAPHIC INSTRUMENTS, ACQUIRE AND STORE DATA OVER A PERIOD OF WEEKS OR MONTHS AND THEN ARE RETRIEVED, THE RESTORED DATA RECOVERED, AND THE INSTRUMENTS REDEPLOYED. RETRIEVAL AND DEPLOYMENT IS AN EXP ...
SBIR Phase II 1991 Department of Commerce -
ON-BOARD PROCESSING OF DOGFISH AND SKATES
SBC: Fisherman Joint Venture Topic: N/AN/A
SBIR Phase I 1991 Department of Commerce -
THIS PROPOSAL OUTLINES A SIMPLE YET ACCURATE APPROACH TO MEASURING THE POSITION AND ORIENTATION OF A ROBOT.
SBC: Intelligent Automation, Inc. Topic: N/ATHIS PROPOSAL OUTLINES A SIMPLE YET ACCURATE APPROACH TO MEASURING THE POSITION AND ORIENTATION OF A ROBOT. THE MECHANISM CAN BE USED TO MAKE BOTH STATIC AND DYNAMIC MEASUREMENTS. TWO VERSIONS OF THE DESIGN ARE PROPOSED; THE FIRST VERSION HAVING HIGH ACCURACY OVER A SMALL WORK VOLUME,AND THE SECOND VERSION HAVING LOWER ACCURACY OVER A WORK VOLUME WHICH WOULD ALLOW POSE MEASUREMENT OVER THE ENTIRE ...
SBIR Phase I 1991 Department of Commerce -
NOAA WEATHER RADIO COVERAGE MAPPING SYSTEM
SBC: MCCREARY RESEARCH, INC. Topic: N/ATHE DISSEMINATION OF TIMELY WEATHER DATA IS BECOMING INCREASINGLY IMPORTANT AS THE POPULATION DENSITY OF THE UNITED STATES INCREASES. AS THE SOLE GOVERNMENT OPERATED RADIO SYSTEM PROVIDING DIRECT WARNINGS TO PRIVATE HOMES, THENOAA WEATHER RADIO (NWR) SYSTEM IS CRITICAL FOR DISSEMINATING NATURAL DISASTER WARNINGS AND THE TIMELY DISSEMINATION OF WEATHER DATA. THE NEED FOR A LOW COST, REAL TIME COVER ...
SBIR Phase I 1991 Department of Commerce -
SATELLITE OBSERVATIONS OF HIGH CLOUDS IN THE TROPICS AND CLIMATE CHANGE
SBC: Mentor Technologies, Inc. Topic: N/ATHREE ASPECTS OF CLIMATE CHANGE INVOLVING VERY HIGH TROPICAL CLOUDS ARE: (1) WHETHER CHANGES IN HIGH CLOUD PARAMETERS LEAD TO POSITIVE OR NEGATIVE FEEDBACK IN CO2 EFFECTS ON CLIMATIC TEMPERATURE CHANGES; (2) DO CHANGES IN THE HEIGHTS OF CLOUD TOPS AND CLOUD AMOUNT, OR CLOUDS WHICH REACH TO THE TROPICAL TROPOPAUSE, AFFECT THE AMOUNT OFWATER VAPOR IN THE LOWER STRATOSPHERE AND INDIRECTLY THE ANTARCT ...
SBIR Phase I 1991 Department of Commerce -
REMOTE SENSING OF ESTUARINE AND NEAR-COAST SALINITY
SBC: PROSENSING INC. Topic: N/ARESEARCH IS PROPOSED TO DESIGN A MICROWAVE REMOTE SENSING SYSTEM TO CONDUCT AIRBORNE REMOTE SENSING MEASUREMENTS IN COASTAL AREAS UTILIZING RELATIVELY SMALL AIRCRAFT. THE SYSTEM WILL INCORPORATE AT LEAST ONE MICROWAVE RADIOMETER OPERATING AT 1.4 GHZ (L-BAND). A TRADE-OFF STUDY WILL BE DONE TO DETERMINE THE BEST WAY TO REMOTELY MEASURE SEA SURFACE TEMPERATURE, WHICH IS NEEDED TO PROVIDE CORRECTIONS ...
SBIR Phase II 1991 Department of Commerce -
FEASIBILITY OF A C-BAND SCATTEROMETER TO REMOTELY SENSE HURRICANE PARAMETERS
SBC: PROSENSING INC. Topic: N/AN/A
SBIR Phase I 1991 Department of Commerce -
PRELIMINARY EVALUATION OF NEW UV/VUV RADIOMETRIC STANDARDS
SBC: VISIDYNE, INC. Topic: N/ATHERE ARE ONLY A FEW RADIOMETRIC STANDARDS AVAILABLE IN THE 115-350 NM WAVELENGTH REGION. AMONG THEM ARE THE ARGON MINI-ARC AND THE DEUTERIUM LAMP. BOTH LAMPS PROVIDE STABLE SOURCES OF UV/VUV RADIATION, AND CAN BE CALIBRATED BOTH IN RADIANCE AND IRRADIANCE. HOWEVER, EACH HAS DISADVANTAGES THAT LIMIT ITS USEFULNESS AS A BENCHTOP OR SPACE-QUALIFIED STANDARD. ONE POSSIBLE ALTERNATIVE SECONDARY RADIOM ...
SBIR Phase I 1991 Department of Commerce