You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LANDFILL GAS RECOVERY FOR COMPRESSED NATURAL GAS VEHICLES AND FOOD GRADE CARBON DIOXIDE

    SBC: Acrion Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  2. A NOVEL CARBON FIRST WALL MATERIAL

    SBC: Applied Sciences Inc.            Topic: N/A

    FIRST WALL PROTECTION MATERIALS FOR A FUSION REACTOR MUST BE ABLE TO WITHSTAND THE VERY HOSTILE THERMAL AND NUCLEAR ENVIRONMENT OF THE PLASMA CHAMBER. MATERIALS MUST HAVE HIGH THERMAL CONDUCTIVITY, HIGH RADIATION RESISTANCE, AND EXCELLENT THERMAL SHOCK RESISTANCE, AMONG OTHER PHYSICAL CHARACTERISTICS. WE ARE PROPOSING TO DEVELOP A NOVEL MATERIAL TO BE USED FOR FIRST WALL PROTECTION, LIMITER, OR DI ...

    SBIR Phase II 1991 Department of Energy
  3. DC ARC-PLASMA FABRICATION OF TUNGSTEN PIPING AND TUBING FOR IMPROVED NUCLEAR FUEL CYCLE PROCESSES

    SBC: APS Materials, Inc.            Topic: N/A

    THIS PROJECT IS DIRECTED TOWARD THE NEAR-NET SHAPE FABRICATION OF TUNGSTEN TUBING AND PIPING AS OPPOSED TO THE CURRENT MANUFACTURING METHOD OF GUN DRILLING. THE PROCESS IS LOW PRESSURE PLASMA SPRAYING (LPPS), A SPRAY-CAST PROCESSTHAT OFFERS ADVANTAGES TO THIS APPLICATION. NOT ONLY CAN PROCESS PIPING, TUBES, AND TRANSFER LINES BE FABRICATED, BUTPAST EXPERIENCE INDICATE THAT ELBOWS AND FITTINGS MAY ...

    SBIR Phase I 1991 Department of Energy
  4. DEVELOPMENT OF MODULAR, HIGH PERFORMANCE FLUIDIC COMPONENTS FOR VENTILATION CONTROL IN NUCLEAR FACILITIES

    SBC: DEFENSE RESEARCH TECHNOLOGIES, INC.            Topic: N/A

    VENTILATION SYSTEMS FOR NUCLEAR FACILITIES MUST HAVE VERY HIGH RELIABILITY AND EFFECTIVENESS. FLUIDIC VORTEX AMPLIFIERS, EJECTOR PUMPS AND OTHER TYPE OF COMPONENTS OFFERTHE HIGHEST DEGREE OF RELIABILITY IN THESE VENTILATION SYSTEM APPLICATIONS BECAUSE THEY HAVE NO-MOVING-PARTS TO WEAR OUT, RELATIVELY FAST RESPONSE, REQUIRE LITTLE OR NO MAINTENANCE AND SOME CASES ARE CHEAPER THAN EQUIVALENT CONVENT ...

    SBIR Phase II 1991 Department of Energy
  5. DEVELOPMENT OF A HIGH DATA RATE, FLUIDIC VORTEX THROTTLE, MUD PULSE TELEMETRY TRANSMITTER FOR MEASUREMENT WHILE DRILLING

    SBC: DEFENSE RESEARCH TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  6. NON-INVASIVE, NON CONTACT, MULTICONDUCTOR CURRENT SENSOR

    SBC: Energy Teller Inc.            Topic: N/A

    POWER MEASUREMENT AND CONTROL ARE MAJOR ENERGY MANAGEMENT AND ENERGY CONSERVATION GROWTH INDUSTRIES. NEWLY PATENTED CURRENT TO VOLTAGE TRANSDUCER (CVT) TECHNOLOGY IS SMALLER, SAFER AND LESS EXPENSIVE THAN CTS. IN ADDITION, THIS NON-CONTACT CVT MONITORS CURRENT IN MULTICONDUCTOR CABLES NON-INVASIVELY--CTS CANNOT. RESEARCH IS NEEDED TO EXPAND THE UNDERSTANDING, EASE OF APPLICATION AND ACCURACY OF TH ...

    SBIR Phase II 1991 Department of Energy
  7. A GAS-FIRED LIQUEFIER FOR NATURAL GAS RECOVERY FROM REMOTE LOCATIONS

    SBC: General Pneumatics Corporation            Topic: N/A

    THIS PROJECT CONSISTS OF A MOBILE, SELF-CONTAINED, GAS-FIREDNATURAL GAS LIQUEFIER SYSTEM FOR THE ECONOMIC RECOVERY OF NATURAL GAS FROM "CAPPED" WELLS IN REMOTE LOCATIONS. THE SYSTEM IS AN INNOVATIVE ARRANGEMENT OF MULTIPLE, TRUCK-MOUNTED STIRLING LIQUEFIER MODULES THAT LIQUEFY METHANE FOR RECOVERY FROM THE WELLHEAD GAS WHILE UTILIZING THE HEAVIER FRACTIONS OF THE NATURAL GAS FOR COMBUSTION TO POWE ...

    SBIR Phase I 1991 Department of Energy
  8. DEVELOPMENT OF A PULSED MHD SOURCE FOR ELECTROMAGNETIC SOUNDING

    SBC: Hmj Corp.            Topic: N/A

    INFORMATION OBTAINED FROM THE MEASUREMENT OF THE ELECTRICAL CONDUCTIVITY OF THE EARTH'S CRUST IS OF GREAT VALUE IN THE EXPLORATION FOR AND THE DELINEATION OF RESOURCES. THIS INFORMATION CAN ALSO SIGNIFICANTLY ENHANCE UNDERSTANDING OF THE EVOLUTION OF THE CRUST, ITS CURRENT COMPOSITION AND STRUCTURE, AND THE FORCES WITHIN IT. THE PREFERRED METHOD OF ELECTROMAGNETIC SOUNDING (EMS) IS TO INDUCE AN EL ...

    SBIR Phase I 1991 Department of Energy
  9. THIS PROPOSAL OUTLINES A SIMPLE YET ACCURATE APPROACH TO MEASURING THE POSITION AND ORIENTATION OF A ROBOT.

    SBC: Intelligent Automation, Inc.            Topic: N/A

    THIS PROPOSAL OUTLINES A SIMPLE YET ACCURATE APPROACH TO MEASURING THE POSITION AND ORIENTATION OF A ROBOT. THE MECHANISM CAN BE USED TO MAKE BOTH STATIC AND DYNAMIC MEASUREMENTS. TWO VERSIONS OF THE DESIGN ARE PROPOSED; THE FIRST VERSION HAVING HIGH ACCURACY OVER A SMALL WORK VOLUME,AND THE SECOND VERSION HAVING LOWER ACCURACY OVER A WORK VOLUME WHICH WOULD ALLOW POSE MEASUREMENT OVER THE ENTIRE ...

    SBIR Phase I 1991 Department of Commerce
  10. AN ADVANCED CONCEPT FOR COST-EFFECTIVE PRESSURIZED FLUIDIZED BED COMBUSTION SYSTEMS

    SBC: Manufacturing And Technology Conversion Int'l, Inc            Topic: N/A

    MTCI'S ALTERNATIVE SECOND-GENERATION ADVANCED PFBC CONCEPT EMPLOYS A PULSE COMBUSTION-BASED COMBUSTOR ISLAND IN THE TOPPING CYCLE. THE PULSE COMBUSTOR ACTS AS A VITIATED AIR BURNER AND SERVES TO INCREASE THE FLUE GAS TEMPERATURE FROM ABOUT 1600 DEGREES FAHRENHEIT AT THE EXIT OF THE PFBC TO ABOUT 2000 DEGREES FAHRENHEIT AT THE INLET TO THE GAS TURBINE. THE COMBUSTOR ISLAND INCLUDES A COMBINED SULFU ...

    SBIR Phase II 1991 Department of Energy
US Flag An Official Website of the United States Government