You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SENSOR BASED SERVO CONTROL FOR A MOBILE ROBOT MANIPULATOR
SBC: Advanced Technologies/Laboratories Intl Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
MODULAR SOLDIER'S COMPUTER (MSC)
SBC: Agilis Corp. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
CAD STATION RM ON-LINE SUPPORT SYSTEM
SBC: Aquidneck Management Associate Topic: N/ATHIS PROJECT OUTLINES A RELIABILITY AND MAINTAINABILITY KNOWLEDGE BASE AND THE HYPERTEXT INTERFACE REQUIRED TO TRANSPORT THIS DATA INTO COMPUTER-AIDED DESIGN (CAD) ENVIRONMENTS. THE PRIMARY FOCUS OF THE PROPOSAL IS THE DEVELOPMENT OF THE FOUNDATION FOR AN ENGINEERING RELIABILITY AND MAINTAINABILITY INFORMATION PRESENTATION SYSTEM TO SUPPORT ELECTRONIC CIRCUIT AND SYSTEMS DESIGN ENGINEERS IN A CAD ...
SBIR Phase I 1991 Department of DefenseAir Force -
FOUR INPUT STACKED MICROWAVE ANTENNA
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
LOW COST CONFORMAL ELECTRONICALLY SCANNED ANTENNA
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
A HIGH-SPEED LASER SCANNING IMPACT SCORING SYSTEM
SBC: AUTOMATED PRECISION, INC. Topic: N/AA PHASE I RESEARCH AND DEVELOPMENT PROJECT TO DESIGN THE EQUIPMENT AND ALGORITHMS TO MEASURE THE IMPACT POINTS OF DIRECT FIRED PROJECTILES ON A VERTICAL MATRIX OF 12.5 METERS BY 12.5 METERS TO A CENTROID ACCURACY OF 1 CENTIMETER AND ANGLE OF INCIDENCE TO AN ACCURACY OF 1 MILLIDEGREE IS PROPOSED. THE CONCEPTUAL DESIGN, THE KEY SUBSYSTEMS, THE OPERATION PROCEDURES AND THE MEASUREMENT ALGORITHMS ARE ...
SBIR Phase I 1991 Department of DefenseArmy -
INT DEMO SYS OF PROTOTYPE DECISION AIDS FOR ATCCS
SBC: Bk-security Topic: N/ATHE PROPOSED RESEARCH EFFORT IS FOCUSED ON THE GOAL OF DEMONSTRATING THE EFFECTIVENESS OF USING LIBRARIES OF GENERIC HIGH LEVEL LANGUAGE, SYSTEMS LEVEL LANGUAGE, AND MACHINE LANGUAGE SOFTWARE CODE IN THE RAPID PROTOTYPING OF ARTIFICIAL INTELLIGENCE SYSTEMS ON MICROCOMPUTERS. THE CONCEPT IS VALIDATED HOLDS OUT SIGNIFICANT ADVANTAGES IN SPEED OF DEVELOPMENT, SPECIALIZATION, USER TO PROGRMMER INTERAC ...
SBIR Phase II 1991 Department of DefenseArmy -
SIMULTANEOUS ACOUSTO-OPTIC AND ELECTRO-OPTIC TECHNOLOGY FOR VERY ACCURATE LASER BEAM POINTING
SBC: BRIMROSE CORPORATION OF AMERICA Topic: N/AACOUSTO-OPTIC AND ELECTRO-OPTIC DEFLECTORS CAN BE USED AS A VERY FAST AND ACCURATE LAER BEAM STEERING AND POINTING DEVICES WITH NO MOVING PARTS. COMPARED TO A MECHANICAL GIMBAL, THEY ARE SMALL SIZE (IN A RANGE OF 1/2X1/2X1/2 INCH), LIGHTWEIGHT, AND LOW POWER CONSUMPTION. THE LATEST TECHNOLOGICAL ADVANCES IN HIGH FREQUENCY ACOUSTO-OPTIC TECHNOLOGY GIVES THE CAPABILITIES OF 20 MICRORADIANS ACCURACIE ...
SBIR Phase I 1991 Department of DefenseArmy -
INTEGRATED REAL-TIME GROUND-WATER/SOIL-GAS MONITORING SYSTEM FOR ANALYSIS OF VOLATILE ORGANIC CHEMICALS
SBC: BURGE ENVIRONMENTAL, INC. Topic: N/AAN INTEGRATED GROUND-WATER/SOIL-GAS MONITORING SYSTEM WILL BE DESIGNED, CONSTRUCTED AND TESTED. THE BASIS OF THE INTEGRATED SYSTEM WILL BE TO PLACE THE VOLATILE ORGANIC CHEMICALS (VOCS) INTO THE SAME SAMPLE FORM, I.E. VOCS IN AN INERT GAS SUCH AS NITROGEN, FOR ANALYSIS. TO ACCOMPLISH THIS A GROUND-WATER SAMPLER WILL BE DESIGNED WHICH WILL COLLECT A GROUND-WATER SAMPLE WITHOUT PURGING THE WELLS. TH ...
SBIR Phase II 1991 Department of DefenseAir Force -
FEEDBACK LIMITED CONTROL SYSTEM FOR LOW DATA RATE REMOTE DRIVING
SBC: Dynamic System Technologies In Topic: N/AREMOTELY OPERATED UNMANNED GROUND VEHICLES (UGVS) ARE SEVERELY RESTRICTED BY THE AVAILABILITY OF A HIGH BANDWIDTH COMMUNICATIONS LINK. REMOTE DRIVING OF UGVS IS CONDUCTED BY VIEWING VIDEO FROM A VEHICLE MOUNTED CAMERA. BECAUSE OF THE SEVERELY CROWDED ELECTROMAGNETIC SPECTRUM, THIS VIDEO HAS TO BE TRANSMITTED BACK TO THE REMOTE CONTROL STATION VIA A NARROW BAND DATA LINK. THE RESULTING VIDEO FREQUE ...
SBIR Phase I 1991 Department of DefenseArmy