You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SENSOR BASED SERVO CONTROL FOR A MOBILE ROBOT MANIPULATOR
SBC: Advanced Technologies/Laboratories Intl Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
MODULAR SOLDIER'S COMPUTER (MSC)
SBC: Agilis Corp. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
BIST FOR OTS AND ASIC VLSI DESIGNS WITH VHDL
SBC: ALTERNATIVE SYSTEM CONCEPTS, INC. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
GABOR/WIGNER-VILLE PROCESSING FOR CROSSTERM SUPPRESSION, RESOLUTION ENHANCEMENT AND NOISE REDUCTION IN UNDERWATER...
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/ATHE WIGNER-VILLE (WV) DISTRIBUTION FINDS FAVOR IN PROCESSING FOR ACOUSTIC TRANSIENT SIGNATURE IDENTIFICATION BECAUSE OF ITS ABILITY TO PORTRAY TIME HISTORY OF THE FREQUENCY DISTRIBUTION OF SIGNAL ENERGY. A KEY ISSUE OF CURRENT RESEARCH ON THE WV DISTRIBUTION IS THE SUPPRESSION OF QUADRATICALLY-INDUCED CROSSTERMS IN THE REPRESENTATION OF SUPERPOSED SIGNALS. WE PROPOSE TO RESEARCH METHODS FOR CROSST ...
SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency -
FOUR INPUT STACKED MICROWAVE ANTENNA
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
LOW COST CONFORMAL ELECTRONICALLY SCANNED ANTENNA
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
A HIGH-SPEED LASER SCANNING IMPACT SCORING SYSTEM
SBC: AUTOMATED PRECISION, INC. Topic: N/AA PHASE I RESEARCH AND DEVELOPMENT PROJECT TO DESIGN THE EQUIPMENT AND ALGORITHMS TO MEASURE THE IMPACT POINTS OF DIRECT FIRED PROJECTILES ON A VERTICAL MATRIX OF 12.5 METERS BY 12.5 METERS TO A CENTROID ACCURACY OF 1 CENTIMETER AND ANGLE OF INCIDENCE TO AN ACCURACY OF 1 MILLIDEGREE IS PROPOSED. THE CONCEPTUAL DESIGN, THE KEY SUBSYSTEMS, THE OPERATION PROCEDURES AND THE MEASUREMENT ALGORITHMS ARE ...
SBIR Phase I 1991 Department of DefenseArmy -
INT DEMO SYS OF PROTOTYPE DECISION AIDS FOR ATCCS
SBC: Bk-security Topic: N/ATHE PROPOSED RESEARCH EFFORT IS FOCUSED ON THE GOAL OF DEMONSTRATING THE EFFECTIVENESS OF USING LIBRARIES OF GENERIC HIGH LEVEL LANGUAGE, SYSTEMS LEVEL LANGUAGE, AND MACHINE LANGUAGE SOFTWARE CODE IN THE RAPID PROTOTYPING OF ARTIFICIAL INTELLIGENCE SYSTEMS ON MICROCOMPUTERS. THE CONCEPT IS VALIDATED HOLDS OUT SIGNIFICANT ADVANTAGES IN SPEED OF DEVELOPMENT, SPECIALIZATION, USER TO PROGRMMER INTERAC ...
SBIR Phase II 1991 Department of DefenseArmy -
SIMULTANEOUS ACOUSTO-OPTIC AND ELECTRO-OPTIC TECHNOLOGY FOR VERY ACCURATE LASER BEAM POINTING
SBC: BRIMROSE CORPORATION OF AMERICA Topic: N/AACOUSTO-OPTIC AND ELECTRO-OPTIC DEFLECTORS CAN BE USED AS A VERY FAST AND ACCURATE LAER BEAM STEERING AND POINTING DEVICES WITH NO MOVING PARTS. COMPARED TO A MECHANICAL GIMBAL, THEY ARE SMALL SIZE (IN A RANGE OF 1/2X1/2X1/2 INCH), LIGHTWEIGHT, AND LOW POWER CONSUMPTION. THE LATEST TECHNOLOGICAL ADVANCES IN HIGH FREQUENCY ACOUSTO-OPTIC TECHNOLOGY GIVES THE CAPABILITIES OF 20 MICRORADIANS ACCURACIE ...
SBIR Phase I 1991 Department of DefenseArmy -
HIGH QUALITY FABRICATION OF LAMINATED COMPOSITE MATERIALS FOR IMPROVED STRUCTURAL... (CLASSIFIED)
SBC: Custom Analytical Engineering Systems, I Topic: N/ATHE OBJECTIVE OF THIS EFFORT IS TO ESTABLISH PROCESS METHODS AND PARAMETERS NECESSARY FOR INCORPORATING COMPRESSION MOLDING TECHNIQUES IN THE FABRICATION OF LAMINATED COMPOSITES TAILORED TO THE SPECIFIC GEOMETRIC AND STRUCTURAL REQUIREMENTS OF KE PROJECTILES. THIS WORK INVOLVES DESIGN AND ANALYSIS OF TWO REPRESENTATIVE KE PROJECTILE CONFIGURATIONS INCORPORATING LAMINATED COMPOSITE COMPONENTS THAT ...
SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency