You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SENSOR BASED SERVO CONTROL FOR A MOBILE ROBOT MANIPULATOR

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  2. MODULAR SOLDIER'S COMPUTER (MSC)

    SBC: Agilis Corp.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  3. FOUR INPUT STACKED MICROWAVE ANTENNA

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  4. LOW COST CONFORMAL ELECTRONICALLY SCANNED ANTENNA

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  5. A HIGH-SPEED LASER SCANNING IMPACT SCORING SYSTEM

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    A PHASE I RESEARCH AND DEVELOPMENT PROJECT TO DESIGN THE EQUIPMENT AND ALGORITHMS TO MEASURE THE IMPACT POINTS OF DIRECT FIRED PROJECTILES ON A VERTICAL MATRIX OF 12.5 METERS BY 12.5 METERS TO A CENTROID ACCURACY OF 1 CENTIMETER AND ANGLE OF INCIDENCE TO AN ACCURACY OF 1 MILLIDEGREE IS PROPOSED. THE CONCEPTUAL DESIGN, THE KEY SUBSYSTEMS, THE OPERATION PROCEDURES AND THE MEASUREMENT ALGORITHMS ARE ...

    SBIR Phase I 1991 Department of DefenseArmy
  6. INT DEMO SYS OF PROTOTYPE DECISION AIDS FOR ATCCS

    SBC: Bk-security            Topic: N/A

    THE PROPOSED RESEARCH EFFORT IS FOCUSED ON THE GOAL OF DEMONSTRATING THE EFFECTIVENESS OF USING LIBRARIES OF GENERIC HIGH LEVEL LANGUAGE, SYSTEMS LEVEL LANGUAGE, AND MACHINE LANGUAGE SOFTWARE CODE IN THE RAPID PROTOTYPING OF ARTIFICIAL INTELLIGENCE SYSTEMS ON MICROCOMPUTERS. THE CONCEPT IS VALIDATED HOLDS OUT SIGNIFICANT ADVANTAGES IN SPEED OF DEVELOPMENT, SPECIALIZATION, USER TO PROGRMMER INTERAC ...

    SBIR Phase II 1991 Department of DefenseArmy
  7. SIMULTANEOUS ACOUSTO-OPTIC AND ELECTRO-OPTIC TECHNOLOGY FOR VERY ACCURATE LASER BEAM POINTING

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    ACOUSTO-OPTIC AND ELECTRO-OPTIC DEFLECTORS CAN BE USED AS A VERY FAST AND ACCURATE LAER BEAM STEERING AND POINTING DEVICES WITH NO MOVING PARTS. COMPARED TO A MECHANICAL GIMBAL, THEY ARE SMALL SIZE (IN A RANGE OF 1/2X1/2X1/2 INCH), LIGHTWEIGHT, AND LOW POWER CONSUMPTION. THE LATEST TECHNOLOGICAL ADVANCES IN HIGH FREQUENCY ACOUSTO-OPTIC TECHNOLOGY GIVES THE CAPABILITIES OF 20 MICRORADIANS ACCURACIE ...

    SBIR Phase I 1991 Department of DefenseArmy
  8. SLUGLESS MULTIPLE HIGH VELOCITY PULSE SHAPED CHARGE JETS

    SBC: Cambridge Hydrodyn Inc            Topic: N/A

    THIS PROPOSAL IS TO APPLY COMPUTATIONAL FLUID DYNAMIC (CFD) SIMULATIONS TO DESIGN SLUGLESS HIGH VELOCITY PULSE SHAPED CHARGE WARHEADS FOR ARMOR PENETRATION. WE HVE DEVELOPED A NEW AND VERY NOVEL CODE ELPIC (EXTENDED LAGRANGIAN PARTICLE IN CELL CODE) WHICH OVERCOMES THE NORMALLY ENCOUNTERED DIFFICULTIES OF BOTH EULERIAN AND LAGRANGIAN CFD CODES FOR THESE PROBLEMS. USING THIS HIGHLY RELIABLE AND EFF ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. MICROWAVE HARDWARE DESCRIPTIVE LANGUAGE

    SBC: Compact Software, Inc.            Topic: N/A

    WE PROPOSE A DESIGN AND PRELIMINARY SPECIFICATION FOR A MICROWAVE HARDWARE DESCRIPTIVE LANGUAGE IN WHICH ALL BEHAVIORAL ASPECTS OF MICROWAVE DESIGN CAN BE DOCUMENTED. THE PURPOSE OF THE MHDL IS DEFINED BASED ON A SURVEY OF EXISTING DOCUMENTATION TECHNIQUES AND EXISTING NEEDS. FURTHERMORE THE ROLE OF MHDL WITH RESPECT TO DESIGN TOOLS AND EDIF IS DESCRIBED. THE LANGUAGE DESCRIBES THE MECHANISMS THAT ...

    SBIR Phase I 1991 Department of DefenseArmy
  10. N/A

    SBC: Deltronic Crystal Indust Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Commerce
US Flag An Official Website of the United States Government