You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SENSOR FUSION USING ELECTRO-OPTIC AND RADAR SIGNAL MODULATION DATA

    SBC: ZIMMERMAN ASSOC., INC.            Topic: N/A

    THE NAVY F-14 FIGHTER CURRENTLY HAS TWO PRIMARY SYSTEMS WHICH CAN BE USED FOR THE IDENTIFICATION OF NON-COOPERATIVE AIR TARGETS: THE TELEVISION CAMERA SET (TCS) AND A RADAR SIGNAL MODULATION (RSM) PROCESSOR COUPLED TO THE AWG-9 FIRE CONTROL RADAR. CURRENTLY, DATA FROM THESE SYSTEMS IS PROCESSED INDEPENDENTLY, AND ANY FUSTION WHICH TAKES PLACE IS PERFORMED BY THE OPERATOR. THE OBJECTIVE OF THIS RES ...

    SBIR Phase II 1994 Department of DefenseNavy
  2. INLINE GAS/AIR MONITORING SYSTEM FOR DEVELOPMENT AND SMALL SCALE PRODUCTION IN PROCESSING FACILITIES

    SBC: APPLIED ORDNANCE TECHNOLOGY            Topic: N/A

    The implementation of new environmental and National Institute for Occupational Safety and Health (NIOSH) regulations due to take effect by the year 2000 make it imperative that industrial and manufacturing processing facilities take steps to monitor, characterize, and control stack emissions in accordance with EPA air permit requirements. Inline gas/air monitoring techniques that permit simultane ...

    SBIR Phase I 1994 Department of DefenseNavy
  3. Automated Detection and Identification of Materials in Hyperspectral

    SBC: APPLIED SIGNAL & IMAGE TECHNOLOGY, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
  4. Conformal UHF SATCOM Antenna for Tactical Aircraft

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
  5. A Very Compact, High Speed and Rugged Integrated-Optic Acousto-Optic Tunable Filter for Wavelength Div. Demultiplexing in Fiber Optic Communication

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    Brimrose proposes to research and develop, in this SBIR program, a prototype minature, polarization-insensitive, acousto-optically tuned filter. This filter will be capable of high speed, mechanical-free electronic tuning over a broad wavelength region with high resolution, sensitivity and repeatability. The filter will be realized by employing optical waveguides integrated into a LiNbO3 substrate ...

    SBIR Phase I 1994 Department of DefenseNavy
  6. High Performance Battery for Missile Guidance

    SBC: Cea Associates            Topic: N/A

    The feasibility of developing a reserve, lithium thionyl chloride battery that combines both high power and high energy is examined. Highly acid electrolytes with halogen catalysts and blended and/or layered carbon cathodes will be studied at current densities up to 250mA/cm and at temperatures from -20 to 60 degrees C. A bipolar reserve cell configuration will be designed to verify that SBIR powe ...

    SBIR Phase I 1994 Department of DefenseNavy
  7. SHIPYARD PRODUCTIVITY

    SBC: Decision Dynamics, Inc.            Topic: N/A

    This proposal offers an innovative methodology to measure and improve shipyard productivity. The methodology creates a cooperative reporting environment in which labor and management seek to accomplish identical performance goals. Measures distinguish between two kinds of labor lost due to reasons beyond labor control. Lost time includes suchurs activities as waiting for materials or equipment, cr ...

    SBIR Phase II 1994 Department of DefenseNavy
  8. QUANTIFYING THE COSTS OF SHIPBUILDING DELAYS

    SBC: Decision Dynamics, Inc.            Topic: N/A

    This proposal presents a system dynamics model of the shipbuilding process that can be used to quantily the cost of shipyard construction delays. The system dynamics methodology models the myriad cause-and-effect relationships that define the shipbuilding process. The model, presented in clear diagramatic form, includes the complex web of feedback linkages responsible for the dynamic behavior of t ...

    SBIR Phase II 1994 Department of DefenseNavy
  9. DETERIORATION SENSORS OF HAZARDOUS MATERIAL CONTAINERS

    SBC: Eai Corp            Topic: N/A

    Two systems are proposed for investigation of potential to solve the problem of premature disposal of hazardous material. The systems employ acoustic technology. One is based on Ultrasonic Pulse-Echo effect (UPE), the other is an Acoustic Resonance Spectroscopy. These systems have been used to externally interrogate chemical warfare materiel and were able to discriminate between chemical agents as ...

    SBIR Phase I 1994 Department of DefenseNavy
  10. CBR Agent Detector for the V-22

    SBC: Eai Corp            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
US Flag An Official Website of the United States Government