You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VERTICAL CAVITY SURFACE EMITTING LASER MODULES FOR OPTICAL COMMUNICATION AND SIGNAL PROCESSING

    SBC: Apa Optics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  2. CRYOGENICALLY COOLED CONTROLLED SWITCH FOR SPACE POWER CONDITIONING

    SBC: Hmj Corp.            Topic: N/A

    A SOLID STATE SWITCH FOR OPERATION AT CRYOGENIC TEMPERATURE IS BEING DEVELOPED THAT WILL PROVIDE MULTI-MEGAWATT POWER CONDITIONING IN THE RAPIDLY EXPANDING FIELD OF LOW TEMPERATURE ELECTRONICS. SINCE EXISTING CONTROLLED SWITCHES ARE NOT DIRECTLY SUITABLE FOR CRYOGENIC OPERATION, ONLY A FUNDAMENTAL APPROACH CAN DEVELOP STRUCTURES CAPABLE OF LOW LOSS AND RELIABLE OPERATION IN THE TEMPERATURE RANGE B ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  3. THIS PROPOSAL OUTLINES A SIMPLE YET ACCURATE APPROACH TO MEASURING THE POSITION AND ORIENTATION OF A ROBOT.

    SBC: Intelligent Automation, Inc.            Topic: N/A

    THIS PROPOSAL OUTLINES A SIMPLE YET ACCURATE APPROACH TO MEASURING THE POSITION AND ORIENTATION OF A ROBOT. THE MECHANISM CAN BE USED TO MAKE BOTH STATIC AND DYNAMIC MEASUREMENTS. TWO VERSIONS OF THE DESIGN ARE PROPOSED; THE FIRST VERSION HAVING HIGH ACCURACY OVER A SMALL WORK VOLUME,AND THE SECOND VERSION HAVING LOWER ACCURACY OVER A WORK VOLUME WHICH WOULD ALLOW POSE MEASUREMENT OVER THE ENTIRE ...

    SBIR Phase I 1991 Department of Commerce
  4. NOAA WEATHER RADIO COVERAGE MAPPING SYSTEM

    SBC: MCCREARY RESEARCH, INC.            Topic: N/A

    THE DISSEMINATION OF TIMELY WEATHER DATA IS BECOMING INCREASINGLY IMPORTANT AS THE POPULATION DENSITY OF THE UNITED STATES INCREASES. AS THE SOLE GOVERNMENT OPERATED RADIO SYSTEM PROVIDING DIRECT WARNINGS TO PRIVATE HOMES, THENOAA WEATHER RADIO (NWR) SYSTEM IS CRITICAL FOR DISSEMINATING NATURAL DISASTER WARNINGS AND THE TIMELY DISSEMINATION OF WEATHER DATA. THE NEED FOR A LOW COST, REAL TIME COVER ...

    SBIR Phase I 1991 Department of Commerce
  5. SATELLITE OBSERVATIONS OF HIGH CLOUDS IN THE TROPICS AND CLIMATE CHANGE

    SBC: Mentor Technologies, Inc.            Topic: N/A

    THREE ASPECTS OF CLIMATE CHANGE INVOLVING VERY HIGH TROPICAL CLOUDS ARE: (1) WHETHER CHANGES IN HIGH CLOUD PARAMETERS LEAD TO POSITIVE OR NEGATIVE FEEDBACK IN CO2 EFFECTS ON CLIMATIC TEMPERATURE CHANGES; (2) DO CHANGES IN THE HEIGHTS OF CLOUD TOPS AND CLOUD AMOUNT, OR CLOUDS WHICH REACH TO THE TROPICAL TROPOPAUSE, AFFECT THE AMOUNT OFWATER VAPOR IN THE LOWER STRATOSPHERE AND INDIRECTLY THE ANTARCT ...

    SBIR Phase I 1991 Department of Commerce
  6. ARTIFICIALLY LAYERED MATERIALS WITH HIGH SUPERCONDUCTIVE CRITICAL CURRENTS

    SBC: Superconix, Inc.            Topic: N/A

    THE INNOVATION IS AN ARTIFICIALLY LAYERED MATERIAL WITH FERROMAGNETIC AND HI-TC SUPERCONDUCTIVE COMPONENTS. THIS HAS BEEN ACHIEVED IN PHASE I BY EXPERIMENTING WITH VARIOUS FERROMAGNETIC AND HI-TC MATERIALS. THE ORIGINAL PHASE I APPLICATION WAS HIGHER SUPERCONDUCTIVE CRITICAL CURRENTS BY PINNING THE MAGNETIC FLUX IN THE FERROMAGNETIC LAYER. HOWEVER, AFTER EXPERIMENTATION IN PHASE I, THE APPLICATION ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government