You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Broadly Tunable Ultrashort Pulse IR OPO Pumped by a Mode-Locked

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    We propose to develop an innovative, compact ultrafast high brightness laser source, broadly tunable in the infrared for vibrationally-resolved infrared microscopy and other applications. By passive Kerr lens mode-locking of a novel diode-pumped tunable Cr:LiSAF laser, 100fs pulses will be generated at 100 MHZ repetition rate with an average power of 1W. An optical parametric oscillator (OPO) pump ...

    SBIR Phase I 1997 Department of Commerce
  2. Abstraction Layer for Advanced Reconfigurable Computing

    SBC: WW TECHNOLOGY GROUP, INC            Topic: N04244

    We propose to develop a methodology and set of related products that allow FPGA applications to be hardware independent (allowing easy migration to new FPGAs), facilitate easy upgrade to add new firmware functionality, and reduce regression testing after system upgrades. Our approach is based on a framework populated by a suite of solutions that support the "end-to-end" development of embedded sy ...

    SBIR Phase I 2004 Department of DefenseNavy
  3. A CAD Tool for Rapid analysis of Repairs

    SBC: ADVANCED STRUCTURAL TECHNOLOGY, INC.            Topic: N06005

    The objective of this project is to develop and validate a CAD tool for the rapid design of mechanically fastened repairs, bonded repairs, and hybrid repairs involving both adhesive bonding and mechanical fasteners. To allow use by non-specialists, the CAD tool will replace the current process of manual construction of joint finite element models with CAD tinker toy assembly using parametric par ...

    SBIR Phase I 2006 Department of DefenseNavy
  4. A Camera, Laser Ranger and RF MIMO SAR Mixed Imaging-Ranging Sensor for Precise, Automated Position-Keeping

    SBC: INTELLIGENT FUSION TECHNOLOGY, INC.            Topic: N143129

    The proposal presents a camera, laser ranger and RF MIMO SAR mixed imaging-ranging sensor system for precise, automated position-keeping. The system does not need to install any instruments on SSBN, and works in all weather conditions and up to sea state 4. There are two combinations of camera and laser ranger (the camera is in charge of target detection, tracking and angle estimation, and the las ...

    SBIR Phase I 2015 Department of DefenseNavy
  5. Accelerated Burn-In Process for High Power Quantum Cascade Lasers to Reduce Total Cost of Ownership

    SBC: IRGLARE LLC            Topic: N20BT029

    The development of a burn-in process for high power MWIR and LWIR Quantum Cascade Lasers (QCLs) is proposed. The new burn-in process will be rooted in extensive statistical experimental data to be collected in Phase I and Phase II of this program. This will allow us to extract all the critical empirical parameters required for mean-time-to-failure (MTTF) projections for high power MWIR and LWIR de ...

    STTR Phase I 2021 Department of DefenseNavy
  6. Accelerating Instructor Mastery

    SBC: COGNITIVE PERFORMANCE GROUP OF FLORIDA, LLC            Topic: N152108

    Military instructors do not have the time or support necessary to achieve mastery or even ensure continued professional development during their tenure as instructors. Teaching skill must develop to adequate levels in the early months of the typical three-year tenure and continue to grow and progress after initial formal training. Each formal school in the Marine Corps has a unique method of initi ...

    SBIR Phase I 2016 Department of DefenseNavy
  7. Accelerating Instructor Mastery (AIM)

    SBC: Design Interactive, Inc.            Topic: N152108

    Mission readiness is highly dependent upon the quality of instruction units receive; thus, it is critical that military instructors develop instructional competencies, along with domain expertise, to adequately promote relevant KSAs among trainees. Unlike civilian career educators, military instructors are not often afforded the time or resources to fully develop their teaching skills prior to ins ...

    SBIR Phase I 2016 Department of DefenseNavy
  8. Accelerating Instructor Mastery (AIM)

    SBC: Design Interactive, Inc.            Topic: N152108

    Military instructors need instructional competencies and domain expertise in order to adequately train warfighters for mission readiness. However, they are not often afforded the time, resources, or computer-based, self-guided learning opportunities to fully develop teaching skills prior to instructional duty. Design Interactive, Inc. will develop the Interactive Military Instructor Training and A ...

    SBIR Phase II 2017 Department of DefenseNavy
  9. Access Control and Personnel ID Verification for Training Applications Utilizing Smart Cards

    SBC: LEAPFROG SMART PRODUCTS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  10. Accessible Virtual Reality for Machinist Training Modules

    SBC: Microcompatibles, Inc.            Topic: N/A

    This proposal will emphasize outfitting a virtual classroom and creating a skills (CNC) oriented training program. The virtual classroom will involve contextual learning using a realistic simulation of the manufacturing environment. The simulation will have all of the characteristics of a machine shop, but will allow the learner to explore and experiment ("discover") in ways that would not be pr ...

    SBIR Phase I 1995 Department of Commerce
US Flag An Official Website of the United States Government