You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TRANSMISSION HOLOGRAPHIC RELAY LENS FOR AIRCRAFT HEAD UP DISPLAY
SBC: Apa Optics, Inc. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
ON-BOARD AIRCRAFT EMBEDDED TRAINING CAPABILITY
SBC: Applications Resources Inc Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
HIGH-EFFICIENCY THIN-FILM SILICON-ON-GAP SOLAR CELL FOR IMPROVED RADIATION RESISTANCE
SBC: ASTROPOWER, INC. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
COMPUTATIONAL OPTIMIZATION OF HYPERSONIC BODIES
SBC: ASTROX CORP Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
LAUNCH VEHICLE COST MODEL DEVELOPMENT
SBC: Berner, Lanphier & Assoc Inc. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
CORRELATION OF POLYIMIDE RESIN MECHANICAL PROPERTIES WITH POLYMERIC PHYSICAL PROPERTIES
SBC: Brewer Science Incorporated Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
SYSTEM
SBC: Compact Discoveries Inc Topic: N/ATHIS PROJECT INVOLVES A DETAILED STUDY OF THE INFORMATION REQUIREMENTS AND SOURCES OF INFORMATION FOR AIR FORCE PLANNERS. THE DATA COLLECTED WILL BE USED AS INPUT INTO THE DESIGN OF AN INFORMATION SYSTEM TO COLLECT, UPDATE, AND ACCESS LARGE QUANTITIES OF EXISTING INFORMATION ON PROGRAM COST, SCHEDULE AND EFFECTIVENESS, TO BE UTILIZES IN THE LONG-RANGE PLANNING PROCESS. THE STUDY WILL BE CONDUCTED ...
SBIR Phase I 1986 Department of DefenseAir Force -
ADAPTIVE NULLING BY ELECTRICAL SURFACE CONTROL OF A REFLECTOR ANTENNA
SBC: COMPUTER SCIENCE INNOVATIONS, INC. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
THIN FILM ELECTRET BOUNDARY LAYER TRANSITION DETECTOR
SBC: Crites Enterprises Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseAir Force -
EVALUATION
SBC: Diginetics Topic: N/ATHE FOCUS OF THIS PROJECT WILL BE THE DEVELOPMENT OF A USER-FRIENDLY, INTEGRATED BIOLOGICAL SIGNAL ACQUISITION AND ANALYSIS SYSTEM CAPABLE OF CONCURRENT CONTROL OF STIMULUS PRESENTATION AND THE ACQUISITION OF BIOLOGICAL SIGNALS. BIOLOGICAL/BEHAVIORAL SYSTEMS TO BE MONITORED WILL BE SELECTED ON THE BASIS OF: 1) INTERFERING MINIMALLY WITH ACTIONS REQUIRED OF THE OPERATOR OF COMPLEX EQUIPMENT; 2) BEI ...
SBIR Phase I 1986 Department of DefenseAir Force