You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: FIDELITY SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Energy
  2. N/A

    SBC: TECHNEST, INC.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Energy
  3. N/A

    SBC: Intelligent Automation, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Transportation
  4. A Solid-Solid Hybrid Gas Generator Fire Suppression System

    SBC: MAINSTREAM ENGINEERING CORP            Topic: N/A

    Not Available This Phase 2 proposal addresses the advanced development and commercialization of a novel solid-solid hybrid gas generator fire suppression technology to replace the ozone depleting Halon 1301 for total flooding applications. Mainstream's solid-solid hybrid gas generator technology will result in the delivery of chemical extinguishing agents to the fire in addition to the inert gas a ...

    SBIR Phase II 1999 Department of Commerce
  5. N/A

    SBC: Manufacturing And Technology Conversion Int'l, Inc            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Energy
  6. N/A

    SBC: OPTIMUS Corporation            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Transportation
  7. N/A

    SBC: SECURE COMPUTING CORP.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Energy
  8. Workflow Policy Server

    SBC: SECURE COMPUTING CORP.            Topic: N/A

    Not Available Workflow management systems (WMS) may control access between hundreds of users and thousands of objects, so simplified policy management is critical. WMS developers recommend Role-Based Access Control (RBAC) since roles occur naturally in workflows; however, the typical RBAC model lacks the framework to express workflow policies adequately. Traditionally, a WMS mediates accesses to ...

    SBIR Phase II 1999 Department of Commerce
  9. N/A

    SBC: SIMULATION TECHNOLOGY & APPLIED RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Energy
  10. N/A

    SBC: SVT ASSOCIATES INC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of Energy
US Flag An Official Website of the United States Government