You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
LOW-COST DESIGN AND ANALYSIS METHOD FOR HYDROSTATIC BEARINGS
SBC: AFAB Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Low Frequency (50-500 Mhz) Radar Sensor System For Measurement Of Terrestrial Vegetative Biomass
SBC: ZIMMERMAN ASSOC., INC. Topic: N/AN/A
SBIR Phase II 1996 National Aeronautics and Space Administration -
GAINASSB AND INASSBP INFRARED DETECTORS
SBC: ASTROPOWER, INC. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Low-Cost, Lightweight Aircraft Emergency Recovery System
SBC: Ballistic Recovery Systems, Inc. Topic: N/AN/A
SBIR Phase II 1996 National Aeronautics and Space Administration -
RAPTOR-RAPID APPLICATION PRODUCTION TOOL USING OBJECT RELATIONSHIPS
SBC: Century Computing Inc Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Perflouromembranes for Low Cost Oxygen Enrichment of Aquaculture
SBC: COMPACT MEMBRANE SYSTEMS, INC. Topic: N/AN/A
SBIR Phase I 1996 Department of Commerce -
MULTI-HYPOTHESIS TRACKING ALGORITHM FOR STAR IDENTIFICATION
SBC: Elektron Systems, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
HUMAN FACTORS SAFETY TESTING FOR VIRTUAL ENVIRONMENT MISSION-OPERATIONS TRAINING
SBC: Epic Sales, Inc. Dba Epic Systems Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
VIRTUAL ENVIRONMENT ADAPTATION ASSESSMENT TEST BATTERY
SBC: Epic Sales, Inc. Dba Epic Systems Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
OPEN CORE ROTATOR
SBC: Fare Inc Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration