You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS
SBC: Berner, Lanphier & Assoc Inc. Topic: N/ACURRENTLY COMMERCIAL SPACE-LAUNCH FREQUENCY REQUIREMENTS ARE MET IN THE 2200- TO 2300-MHZ BAND. NEW FREQUENCY ALLOCATIONS MAY LIMIT FREQUENCIES FOR COMMERCIAL SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS TO THREE CHANNELS IN THE 2360- TO 2390-MHZ BAND. THIS RESEARCH WILL ASSESS WHETHER THIS ALLOCATION IS SUFFICIENT TO ENSURE CONTINUED SAFE AND RELIABLE COMMERCIAL SPACE-LAUNCH OPERATIONS. D ...
SBIR Phase II 1996 Department of Transportation -
Digital Waveform-based System for AE Measurement for NDT
SBC: Dvp, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
Autonomous Agents for Distributed Problem Solving, Planning and Control
SBC: Intelligent Automation, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Commerce -
Feasibility of and Techniques for CORSIM Model Computer-Based Training
SBC: Pacific Animated Imaging Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
A Dynamic Bulk Modulus/PVT Apparatus for Characterization of Polymers
SBC: Radix Systems, Inc. Topic: N/ACurrently, advanced tools for modeling injection modeling of thermoplastics and predicting formed part dimensional stability and residual stress content use the static bulk modulus of the polymer at the temperatures and pressures associated with the molding process. The short cycle times associated with injection molding, however, could be more accurately modeled if dynamic bulk modulus data were ...
SBIR Phase I 1996 Department of Commerce -
Dynamic Intrusion Sensing System Using a High Speed Low Cost 3D Camera
SBC: Robotronics Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
Interactive, 3-D Mathematics Instructions
SBC: Seward Incorporated Topic: N/AThe goal of this project is to develop an demonstrate the feasibility of computer-based, multimedia instruction to facilitate the acquisition of difficult to learn mathematics principles. The goal will be accomplished through the design and development of a multimedia interface that uses audio prompts, interaction graphics, and text displays to guide learners through problem solving activities. ...
SBIR Phase I 1996 Department of Commerce -
The Application of Advanced Technology to Traffic Enforcement
SBC: Anacapa Sciences, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
MULTIMEDIA FEASIBILITY STUDY- PHASE I
SBC: Antares Group Incorporated Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
LAUNCH VEHICLE TECHNOLOGY
SBC: Berner, Lanphier & Assoc Inc. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation