You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. 3-D Facial Imaging System

    SBC: ADVANCED ANTI-TERROR TECHNOLOGIES CORP            Topic: SOCOM07004

    The aims and opportunities of Photo-Automatic-Linking for 3-D Facial-Imaging System(PALS-3D) are focused on innovative development, iterative evolving, and near-term fielding of modular inexpensive imaging systems that enable users to capture a person’s face in three dimensions(3-D) and identify the individual based on two dimensions(2-D) and/or 3-D baseline imagery using lightweight, low power, ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  2. Individual Cooling Equipment

    SBC: CESARONI TECHNOLOGY INCORPORATED            Topic: SOCOM06009

    Military ground mobility vehicles often operate in areas of high heat with no environmental conditioning systems for cooling the individual soldier or critical vehicle electronic systems. Typical vehicle climate control systems are large refrigerant-based systems that are not man portable. SOCOM expressed a desire for cooling equipment that is man portable for short periods of time (~3 hours) du ...

    SBIR Phase II 2007 Department of DefenseSpecial Operations Command
  3. Development of a Coastal Long-Term Automated Self-Calibrating Profiler

    SBC: Green Eyes, LLC            Topic: 814

    Green Eyes, LLC will demonstrate the feasibility of a Coastal Long-term Automated Self-calibration Profiler (CLASP) system capable of operating autonomously for one year without servicing. CLASP will be configured to incorporate wireless two-way communications for automated data dissemination and remote control. Two major innovations are required to develop such a system. 1. Automated bio-fouli ...

    SBIR Phase I 2007 Department of Commerce
  4. Enhanced Small Arms Ammunition

    SBC: LIBERTY AMMUNITION, INC.            Topic: SOCOM06008

    Small arms ammunition has not changed significantly in decades. Projectiles consisting of lead cores, jacketed with copper alloy have been in service since the early twentieth century and continue to be widely used. Lead is highly toxic, and concerns have been raised regarding the environmental impact of lead core small arms projectiles. Liberty Ammunition Inc. was founded to explore alternative g ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  5. ALERT-2 Protocol Development

    SBC: SALO IT SOLUTIONS INC            Topic: 8310

    Salo IT Solutions, Inc. (SaloITS) will design and implement the ALERT-2 protocol, a next-generation suite of network protocols that will provide enhanced services for Automated Flood Warning Systems (AFWSs). The focus of this Phase I project is to create and develop a consensus within the ALERT community in support of an ALERT-2 Requirements Specification document and an ALERT-2 Protocol Specific ...

    SBIR Phase I 2007 Department of Commerce
  6. Camouflage Tactical Multiband Direction Finding Antenna Array

    SBC: SYNTONICS LLC            Topic: SOCOM06017

    Syntonics will demonstrate the feasibility of a broadband “DF Tarp." It can be a lightweight, rugged, fabric-like structure stretched on guyed poles like an awning or laid on top of a vehicle. It can be rolled or folded for storage. It can be fabricated in any color or camouflage pattern desired and many shapes — square, round, irregular — are possible. The antenna structure can be integrate ...

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  7. High Resolution Infrared Focal Plane Array

    SBC: ZYBERWEAR, INC.            Topic: SOCOM07005

    A novel microbolometer focal plane array is proposed for use at 8-14 µm having very low noise, no required thermoelectric stabilization, contrast over a very wide range of object temperature, and projected low cost in manufacture.

    SBIR Phase I 2007 Department of DefenseSpecial Operations Command
  8. Non-Marine-Based Fishmeal and Fish Oil Replacement Strategies for the Production of Aquaculture Feed

    SBC: ABN            Topic: 841

    If aquaculture is to become an increasing contributor to the food supply, it is critical that aquaculture feeds become less reliant on marine-derived fishmeal and fish oil as the preferred source of essential proteins and lipids. Not only is the wild fishery from which these products are extracted at maximum sustainable levels of harvest, but also there is increasing concern that these feedstocks ...

    SBIR Phase I 2004 Department of Commerce
  9. Standard Robot Platform Designed for Unstructured Environment Research

    SBC: TARGAZYME, INC.            Topic: N/A

    Robotic researchers currently are using insufficient and varying robot platforms to investigate issues crucial to the successful development of a remote reconnaissance tool for the urban search and rescue (USAR) community. USAR robotic researchers need a standard robot platform designed for research in unstructured environments. This platform would accelerate the research essential to advancing re ...

    SBIR Phase I 2004 Department of CommerceNational Institute of Standards and Technology
  10. Heads-up Vessel Navigation using Raster/Vector Data

    SBC: GMA INDUSTRIES, INC.            Topic: 851

    This project entails a comprehensive approach to developing an innovative solution to heads-up display navigation for marine vessels that addresses the required hardware, the sources of raster and vector navigation and marine charting data, and the means to convey these data to watch standers on the bridge in a manner that enhances their performance. During Phase I we identify specific heads-up d ...

    SBIR Phase I 2004 Department of Commerce
US Flag An Official Website of the United States Government