You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of a Coastal Long-Term Automated Self-Calibrating Profiler

    SBC: Green Eyes, LLC            Topic: 814

    Green Eyes, LLC will demonstrate the feasibility of a Coastal Long-term Automated Self-calibration Profiler (CLASP) system capable of operating autonomously for one year without servicing. CLASP will be configured to incorporate wireless two-way communications for automated data dissemination and remote control. Two major innovations are required to develop such a system. 1. Automated bio-fouli ...

    SBIR Phase I 2007 Department of Commerce
  2. The Characterization and Mitigation of Single Event Effects in Ultra-Deep Submicron (< 90nm) Microelectronics

    SBC: Orora Design Technologies, Inc.            Topic: DTRA07005

    Orora Design Technologies proposes the development of minimally invasive circuit design-based methods to mitigate single event effects (SEEs) in next generation Ultra-DSM CMOS (

    SBIR Phase I 2007 Department of DefenseDefense Threat Reduction Agency
  3. ALERT-2 Protocol Development

    SBC: SALO IT SOLUTIONS INC            Topic: 8310

    Salo IT Solutions, Inc. (SaloITS) will design and implement the ALERT-2 protocol, a next-generation suite of network protocols that will provide enhanced services for Automated Flood Warning Systems (AFWSs). The focus of this Phase I project is to create and develop a consensus within the ALERT community in support of an ALERT-2 Requirements Specification document and an ALERT-2 Protocol Specific ...

    SBIR Phase I 2007 Department of Commerce
  4. Aquaculture: Disease Diagnostics and Control

    SBC: ProFishent Incorporated            Topic: 8111

    Nanotechnology Systems to Prevent Disease and Improve Healing of Aquatic Animals

    SBIR Phase II 2007 Department of Commerce
  5. DEEP UNDERGROUND OPENINGS UNDER NUCLEAR WEAPONS EFFECTS

    SBC: Ewa Inc            Topic: N/A

    THE SAFE DESIGN OF DEEP MISSILE BASING STRUCTURES SUBJECTED TO STRESS TRANSIENTS GENERATED BY SURFACE DISTURBANCES SUCH AS NUCLEAR OR CONVENTIONAL EXPLOSIONS IS A VERY IMPORTANT PROBLEM FOR J.S. NATIONAL SECURITY INTEREST. THE PROPAGATION OF SURFACE DISTURBANCES THROUGH INHOMOGENEOUS, JOINTED, FRACTURED, AND LAYERED GEOLOGIC MEDIUM OF THE INFINITE DOMAIN IS A VERY COMPLEX PROBLEM ESPECIALLY NEAR D ...

    SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government