You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Ultra-Rad-Hard Full-HD Image Sensor and Camera for Rare Isotope Beam Facilities
SBC: ALPHACORE INC Topic: C5523eThe Department of Energy requires a compact digital imaging system (or systems) for beam and target system diagnostic applications. Capable of HD resolution, motion deblurring, object/event detection/identification, object tracking, and data compression, the proposed system is meant to resolve current camera lifespan inadequacies while also boosting energy level resistance. This problem is being a ...
SBIR Phase I 2023 Department of Energy -
Structural Components with Corrosion Resistant Surface Layers for Advanced Nuclear Reactor Systems
SBC: ADVANCED CERAMICS MANUFACTURING, LLC Topic: C5512aAdvanced high temperature nuclear reactor systems that utilize liquid coolants such as molten fluorides require structural components that are also corrosion resistant to the coolant. The current structural components approved for use in ASME Code Sec III Div 5 have insufficient corrosion resistance for long lifetimes. This problem will be addressed by the incorporation of thick, corrosion resista ...
SBIR Phase I 2023 Department of Energy -
Novel Insulators in Silicon-on-Insulator Substrates to Improve Nuclear Physics Sensors and Circuits
SBC: CAPORUS TECHNOLOGIES INC Topic: C5333cC53-33c-271423Active pixel sensors have been developed and implemented in a wide array of applications, including image sensors for cameras, sensors for medical imaging, and as detectors for nuclear physics investigations with the Relativistic Heavy Ion Collider and the Large Hadron Collider. Many of these applications, including nuclear physics detectors, medical imaging sensors, and sensors for ...
SBIR Phase II 2023 Department of Energy -
Advanced Manufacturing of Low Ron Diamond-based Power Transistors
SBC: ADVENT DIAMOND, INC. Topic: C5620aThe problem being addressed in this application is the lack of materials and manufacturing techniques available to fabricate next- generation semiconducting electronic components in the United States. Specifically, this project advances diamond-based power components, which can bring greater efficiency, reliability, and resilience to the power grid. This project focuses on manufacturing methods an ...
SBIR Phase I 2023 Department of Energy -
Low-nonlinearity Yb-doped Fiber Amplifier Arrays for Ultrafast Fiber Laser Combining
SBC: N.P. PHOTONICS, INC. Topic: C5635aBeam combining of many ultrafast lasers is a very promising route to achieving high peak power and high average power laser systems required for DOE acceleration applications. Fiber lasers have become key workhorses for power scaling of ultrafast laser sources due to their high single-pass gain, outstanding heat-dissipating capability, excellent beam quality, inherent simplicity, and compactness. ...
SBIR Phase I 2023 Department of Energy -
Development of Autonomous Nodal Electromagnetic Measurement System for Geophysical Monitoring of Geologic Carbon Storage Processes
SBC: Zonge International, Inc. Topic: C5625dCO2 sequestration projects, when deployed at scale, must move beyond prototype systems dependent of teams of specialist scientists and become supportable industrial processes. One portion of the of this industrial process is the monitoring of the subsurface conditions of the saline aquifers undergoing CO2 injection. Novel deployments utilizing borehole transmitters are a potential solution to inje ...
SBIR Phase I 2023 Department of Energy -
Radiation hardened Trench-Isolated Low-Gain Avalanche Diode (TI-LGAD)
SBC: CACTUS MATERIALS, INC. Topic: C5637aThe current generation of low gain avalanche diodes (LGAD) suffers from large fractional dead area at the edges of the pixel, resulting in an important loss of fill factor if the pixel size is in the order of 100 micron. For example, the LGADs planned to be used in the timing detectors of both ATLAS and CMS have a pixel pitch of 1.3 mm. Furthermore, current generations of LGADs have only moderate ...
SBIR Phase I 2023 Department of Energy -
Intelligent Data Compression for Distributed Acoustic Sensing (DAS) Systems
SBC: ALPHACORE INC Topic: C5606aC56-06a-273584The use of DAS systems is a novel and affordable method to monitor large seismic events such as nuclear explosions, earthquakes, and other underground and underwater seismic activities. However, these target applications cause significantly larger volumes of data than conventional ‘small’ use cases (which gather up to several terabytes of data per day). Therefore, in order to be ...
SBIR Phase I 2023 Department of Energy -
Next Generation Microlayer Annular Co-Extrusion
SBC: Guill Tool & Engineering Co, Inc. Topic: C5620cAnnular extruded plastics are in everything from fuel lines, hoses, pipes, and wires to catheters, medical tubing, and stents and makes up about ? of the $200B extruded plastics market. Extrusion manufacturing is a major processor of the $600B raw plastics industry, which produces 380 million metric tons of material each year. The production of these materials accounts for 4% of oil consumption an ...
SBIR Phase I 2023 Department of Energy -
Ultra-Rad-Hard Full-HD Image Sensor and Camera for Rare Isotope Beam Facilities
SBC: ALPHACORE INC Topic: C5523eThe Department of Energy requires a compact digital imaging system (or systems) for beam and target system diagnostic applications. Capable of HD resolution, motion deblurring, object/event detection/identification, object tracking, and data compression, the proposed system is meant to resolve current camera lifespan inadequacies while also boosting energy level resistance. This problem is being a ...
STTR Phase I 2023 Department of Energy