You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
SENSOR BASED SERVO CONTROL FOR A MOBILE ROBOT MANIPULATOR
SBC: Advanced Technologies/Laboratories Intl Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
MODULAR SOLDIER'S COMPUTER (MSC)
SBC: Agilis Corp. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
FOUR INPUT STACKED MICROWAVE ANTENNA
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
LOW COST CONFORMAL ELECTRONICALLY SCANNED ANTENNA
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
INT DEMO SYS OF PROTOTYPE DECISION AIDS FOR ATCCS
SBC: Bk-security Topic: N/ATHE PROPOSED RESEARCH EFFORT IS FOCUSED ON THE GOAL OF DEMONSTRATING THE EFFECTIVENESS OF USING LIBRARIES OF GENERIC HIGH LEVEL LANGUAGE, SYSTEMS LEVEL LANGUAGE, AND MACHINE LANGUAGE SOFTWARE CODE IN THE RAPID PROTOTYPING OF ARTIFICIAL INTELLIGENCE SYSTEMS ON MICROCOMPUTERS. THE CONCEPT IS VALIDATED HOLDS OUT SIGNIFICANT ADVANTAGES IN SPEED OF DEVELOPMENT, SPECIALIZATION, USER TO PROGRMMER INTERAC ...
SBIR Phase II 1991 Department of DefenseArmy -
SIMULTANEOUS ACOUSTO-OPTIC AND ELECTRO-OPTIC TECHNOLOGY FOR VERY ACCURATE LASER BEAM POINTING
SBC: BRIMROSE CORPORATION OF AMERICA Topic: N/AACOUSTO-OPTIC AND ELECTRO-OPTIC DEFLECTORS CAN BE USED AS A VERY FAST AND ACCURATE LAER BEAM STEERING AND POINTING DEVICES WITH NO MOVING PARTS. COMPARED TO A MECHANICAL GIMBAL, THEY ARE SMALL SIZE (IN A RANGE OF 1/2X1/2X1/2 INCH), LIGHTWEIGHT, AND LOW POWER CONSUMPTION. THE LATEST TECHNOLOGICAL ADVANCES IN HIGH FREQUENCY ACOUSTO-OPTIC TECHNOLOGY GIVES THE CAPABILITIES OF 20 MICRORADIANS ACCURACIE ...
SBIR Phase I 1991 Department of DefenseArmy -
FEEDBACK LIMITED CONTROL SYSTEM FOR LOW DATA RATE REMOTE DRIVING
SBC: Dynamic System Technologies In Topic: N/AREMOTELY OPERATED UNMANNED GROUND VEHICLES (UGVS) ARE SEVERELY RESTRICTED BY THE AVAILABILITY OF A HIGH BANDWIDTH COMMUNICATIONS LINK. REMOTE DRIVING OF UGVS IS CONDUCTED BY VIEWING VIDEO FROM A VEHICLE MOUNTED CAMERA. BECAUSE OF THE SEVERELY CROWDED ELECTROMAGNETIC SPECTRUM, THIS VIDEO HAS TO BE TRANSMITTED BACK TO THE REMOTE CONTROL STATION VIA A NARROW BAND DATA LINK. THE RESULTING VIDEO FREQUE ...
SBIR Phase I 1991 Department of DefenseArmy -
FIRE SUPPORT APPLICATIONS OF GLOBAL POSITIONING SYSTEM TRANSPONDERS
SBC: Edc/amcomp Topic: N/ATHE PROPOSED PROGRAM INCLUDES ANALYSES AND INVESTIGATIONS TO DETERMINE THE MOST COST EFFECTIVE APPROACH FOR THE DESIGN OF A GPS TRANSPONDER SYSTEM FOR ARTILLERY REGISTRATION ROUNDS. THE GOALS FOR THE FINAL DESIGN INCLUDE A $300 COST AND A PACKAGE THAT WILL FIT IN THE STANDARD FUZE OGIVE. A BASIC SYSTEM CONCEPT IS PROPOSED AND PRELIMINARY DESIGN PARAMETERS PRESENTED. DESIGN ALTERNATIVES ARE ALSO DE ...
SBIR Phase I 1991 Department of DefenseArmy -
CRYOGENICALLY COOLED CONTROLLED SWITCH FOR SPACE POWER CONDITIONING
SBC: Hmj Corp. Topic: N/AA SOLID STATE SWITCH FOR OPERATION AT CRYOGENIC TEMPERATURE IS BEING DEVELOPED THAT WILL PROVIDE MULTI-MEGAWATT POWER CONDITIONING IN THE RAPIDLY EXPANDING FIELD OF LOW TEMPERATURE ELECTRONICS. SINCE EXISTING CONTROLLED SWITCHES ARE NOT DIRECTLY SUITABLE FOR CRYOGENIC OPERATION, ONLY A FUNDAMENTAL APPROACH CAN DEVELOP STRUCTURES CAPABLE OF LOW LOSS AND RELIABLE OPERATION IN THE TEMPERATURE RANGE B ...
SBIR Phase I 1991 Department of DefenseMissile Defense Agency -
PORTABLE THERMOGRAPHIC INSPECTION FOR COMPOSITES
SBC: Industrial Quality, Inc. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy