You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CRYOGENICALLY COOLED CONTROLLED SWITCH FOR SPACE POWER CONDITIONING

    SBC: Hmj Corp.            Topic: N/A

    A SOLID STATE SWITCH FOR OPERATION AT CRYOGENIC TEMPERATURE IS BEING DEVELOPED THAT WILL PROVIDE MULTI-MEGAWATT POWER CONDITIONING IN THE RAPIDLY EXPANDING FIELD OF LOW TEMPERATURE ELECTRONICS. SINCE EXISTING CONTROLLED SWITCHES ARE NOT DIRECTLY SUITABLE FOR CRYOGENIC OPERATION, ONLY A FUNDAMENTAL APPROACH CAN DEVELOP STRUCTURES CAPABLE OF LOW LOSS AND RELIABLE OPERATION IN THE TEMPERATURE RANGE B ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  2. LARGE AREA INSPECTION OF FIBERGLASS MARINE HULLS

    SBC: Industrial Quality, Inc.            Topic: N/A

    A PROGRAM IS PROPOSED TO DEVELOP AN INFRARED THERMAL INSPECTION APPLICATION FOR THE EXAMINATION OF BARE AND COATED FIBERGLASS HULL STRUCTURES. PRIOR WORK HAS DEMONSTRATED THE APPLICABILITY OF THE INFRARED APPROACH TO THE INSPECTION OF THIS TYPE OF MATERIAL. SEVERAL TECHNIQUESWILL BE EVALUATED FOR THE APPLICATION OF THE THERMAL LOAD NEEDED TO PERFORM THE TEST. INFRARED THERMOGRAPHY OFFERS VERY RADI ...

    SBIR Phase I 1991 Department of Transportation
  3. MAINTENANCE-AND-VIBRATION-FREE SOLID ELECTROLYTE CRYOGENIC COOLER

    SBC: LONE PEAK ENGINEERING COMPANY            Topic: N/A

    THE COOLING REQUIRED FOR THE PROPER OPERATION OF VARIOUS SENSORS AND INSTRUMENTS IS A KEY PROBLEM IN SPACE-BASED FACILITIES. A NOVEL CONCEPT HAS BEEN DEVELOPED AT LONE PEAK ENGINEERING BASED ON THE COMPRESSION OF A GAS TO HIGH PRESSURES USING A SOLID ELECTROLYTE COMPRESSOR. RAPID EXPANSION OF THE COMPRESSED GAS (JOULE-THOMSON EFFECT) CAN BE USED TO COOL SPACECRAFT INSTRUMENTS AND EQUIPMENT. SOME O ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  4. USCG PV POWER SUPPLY

    SBC: OMITRON, INC.            Topic: N/A

    THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY PHOTOVOLTAIC POWER SUPPLY DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH A STATUS MONITORING SYSTEM FOR COMMUNICATION OF SYSTEM PARAMETERS TO REMOTE MONITORING STATIONS. DESIGN WORK WILL DEVELOP NEW APPROACHES TO THE UTILIZATION OF SOLAR CELL ARRAYS TO GENERATE ELECTRI ...

    SBIR Phase I 1991 Department of Transportation
  5. USCG BUOY STATUS MONITOR

    SBC: OMITRON, INC.            Topic: N/A

    THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY STATUS MONITOR AND REPORTING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH THE BUOY PHOTOVOLTAIC POWER SUPPLY AND THE BUOY POSITION MONITORING SYSTEM FOR COMMUNICATION WITH REMOTE MONITORING STATIONS. THE SYSTEM WILL BE MODULAR AND EXTENDABLE ALLOWING MODULES S ...

    SBIR Phase I 1991 Department of Transportation
  6. USCG BUOY POSITION MONITOR

    SBC: OMITRON, INC.            Topic: N/A

    THE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY POSITION MONITORING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH A STATUS MONITORING SYSTEM FOR COMMUNICATION OF SYSTEM PARAMETERS AND ALARMS TO REMOTE MONITORING STATIONS. THIS EFFORT WILL EVALUATE LORAN AND GPS POSITIONING SYSTEMS TO DETERMINE WHICH IS MOST ...

    SBIR Phase I 1991 Department of Transportation
  7. OPERATOR ALERTNESS MONITORING USING THE PUPIL LIGHT REFLEX

    SBC: Pulse Electronics Inc            Topic: N/A

    A KEY FACTOR IN THE ABILITY TO SAFELY OPERATE A TRAIN IS THEOPERATOR ALERTNESS. OPERATOR ALERTNESS CAN BE COMPROMISED AS A RESULT OF FATIGUE, SUBSTANCE ABUSE OR EMOTIONAL DISTRESS. A DEVICE THAT WOULD OBJECTIVELY REPORT A PERSONS STATE OF ALERTNESS COULD INDICATE THAT PERSONS FITNESS FOR DUTY, FOR EXAMPLE, AT THE BEGINNING OF A SHIFT. IT IS WELL KNOWN THAT ALERTNESS IS HIGHLY CORRELATED WITH VARIO ...

    SBIR Phase II 1991 Department of Transportation
  8. CDTE OPTICAL COMPONENTS IN LONG WAVELENGTH INFRARED SYSTEMS

    SBC: Xacton Corp            Topic: N/A

    INFRARED SYSTEMS ARE NEEDED FOR A VARIETY OF DEFENSE RELATED APPLICATIONS, SUCH AS: SURVEILLANCE, TARGET DETECTION, ACQUISITION AND TRACKING, MISSILE GUIDANCE, ETC. FOR MANY APPLICATIONS SUCH AS THOSE INVOLVING COLD-DIM TARGETS, THESE SYSTEMS NEED TO OPERATE IN THE VERY LONG WAVELENGTH REGION OF THE INFRARED SPECTRUM, E.G. 15-35 MICRONS CUTOFF. IN THIS WAVELENGTH REGION, THE AVAILABILITY OF SUITAB ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  9. MERCURY CADMIUM TELLURIDE FOR LONG WAVELENGTH (15-25 MICRONS) INFRARED SENSOR APPLICATIONS

    SBC: Xacton Corp            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseMissile Defense Agency
  10. MERCURY CADMIUM TELLURIDE SUBSTRATE FOR FOCAL PLANE ARRAYS

    SBC: Xacton Corp            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government