You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Surgical Skills Training and Assessment Instrument (SUSTAIN) Mobile App

    SBC: Anthrotronix, Inc.            Topic: N101094

    This Subsequent Phase II Proposal is an extension of Phase II contract N00014-11-C-0420. The overall objective of the proposed Subsequent Phase II effort is to develop and provide initial validation for a mobile training platform and framework that will support optimized refresher training for a variety of medical skills. Maintenance of specialized skills during periods of nonuse presents a signif ...

    SBIR Phase II 2014 Department of DefenseNavy
  2. Motion-induced User Symptomatology Toolkit for Evaluating Readiness (MUSTER) Phase II

    SBC: Anthrotronix, Inc.            Topic: N131077

    The primary objective of the MUSTER Phase II effort will be to develop, validate, and transition the PASS MUSTER technology to predict, diagnose, and mitigate motion-induced performance degradation within Naval and Marine Corps operational environments. Pursuant to this effort, the following technical objectives are proposed: Objective 1: Complete development and validation of predictive questionn ...

    SBIR Phase II 2014 Department of DefenseNavy
  3. Robust Power Conversion/Conditioning Technologies for High Power Aircraft Applications

    SBC: Rct Systems, Inc.            Topic: N122114

    High power pulse weapons have been proposed for decades. Prototype lasers have had some success in destroying surface and airborne targets. High power, high efficiency laser diodes are now available to pump the lasers but they need large amounts of power and energy storage. The instantaneous power loading that these pulsed weapons would demand from the current electrical generation and distributio ...

    SBIR Phase II 2014 Department of DefenseNavy
  4. Techniques for Automatically Exploiting Passive Acoustic Sonar Data

    SBC: LAKOTA TECHNICAL SOLUTIONS, INC.            Topic: N06138

    Lakota Technical Solutions, Inc. will develop a target classification capability based on emitter characteristics passively detected by ESM systems. Successful classification is based in part and fundamentally reliant upon successful emissions based target tracking. This tracking is based upon a probabilistic multi-hypothesis tracking capability which associates multiple emissions with specific tr ...

    SBIR Phase II 2011 Department of DefenseNavy
  5. Spherical Piezocrystal Transducers

    SBC: Btech Acoustics, LLC            Topic: N122142

    We propose the continued design, development and testing of spherical piezocrystal transducers and supporting technology including our gyroid transducer. The Phase II effort covers the modeling and demonstration of the gyroid transducer and comparison of performance with several piezocrystal and piezoceramic materials and testing in realistic environment. The electroacoustic performance will be es ...

    SBIR Phase II 2014 Department of DefenseNavy
  6. Ultra Wide Bandwidth High Dynamic Range Digital ISR Receivers for the submarine force

    SBC: SEACORP, LLC            Topic: N101059

    This effort to improve the capabilities of the ESM system will increase the reliability and reduce lifecycle support costs of the Radar Wideband (RWB) subsystem on submarines. Analog to digital converter (A/D) based digital receivers will be applied to yield improvements in Radar signal acquisition and processing. In-phase and Quadrature (I/Q) data streams will be created from which intra pulse mo ...

    SBIR Phase II 2012 Department of DefenseNavy
  7. Real-time In-situ Adaptation of Decision Parameters for Undersea Target Tracking in a Sensor Field

    SBC: Intelligent Automation, Inc.            Topic: N10AT038

    Detection of moving targets in spatially-variable and uncertain environments is of prime importance in maritime intelligence, surveillance and reconnaissance (ISR) systems. However, the situational context may prohibit the placement of a single fixed long-term ISR system that can be fine-tuned to maximize performance in the area of interest. In such situations, distributed fields of passive sensor ...

    STTR Phase II 2011 Department of DefenseNavy
  8. Recognition of New Advanced Threats Using Purpose and Network Correlators (RAPCOR)

    SBC: Intelligent Automation, Inc.            Topic: OSD12IA4

    aaa

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  9. HMI for Efficient, Lithe, and Intuitive Operator-communication and Sense-making in Power Networks (HELIOS-PN)

    SBC: Intelligent Automation, Inc.            Topic: OSD11EP2

    Intelligent Automation, Inc. (IAI http://i-a-i.com/ ) in collaboration with Siemens and Wyle propose to develop a modular, flexible and scalable semi-autonomous operators control system for military power and energy networks with special focus on future

    SBIR Phase II 2014 Department of DefenseOffice of the Secretary of Defense
  10. Man Transportable Robotic System (MTRS) Remote Digger and Hammer Chisel

    SBC: VECNA TECHNOLOGIES, INC            Topic: N101050

    A pneumatic hammer chisel end effector will be developed that uses a simple yet novel fluid routing system. The lightweight device is easily attached to existing MTRS arms and can generate the impact forces required to fracture concrete and packed soil. The end effector requires no modification to the operator control unit and only two connections to the MTRS: a mechanical interface to hold the to ...

    SBIR Phase II 2012 Department of DefenseNavy
US Flag An Official Website of the United States Government