You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DISTRIBUTED DIGITAL CONTROLLER ARCHITECTURE FOR ADAPTIVE CONTROL

    SBC: Addmaster Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  2. DISTRIBUTED PROCESSING FOR BALLISTIC DEFENSE SYSTEMS

    SBC: Advanced Decision Systems            Topic: N/A

    THE OBJECTIVE OF THIS STUDY IS THE DEVELOPMENT OF TOOLS AND TECHNIQUES DESIGNED TO AID IN THE ABILILTY TO DEVELOP DISTRIBUTED COMPUTING SYSTEMS FOR REAL-TIME ENVIRONMENT. THE INITIAL INVESTIGATION WILL FOCUS ON THE DEVELOPMENT AND AND EVALUATION OF INTERCEPTOR MANAGEMENT ALGORITHMS USING ARTIFICIAL INTELLIGENCE PLANNING TECHNIQUES. THE WORK TO BE PERFORMED DURING PHASE I WILL INCLUDE DEVELOPING AN ...

    SBIR Phase II 1986 Department of DefenseArmy
  3. OPERATIONS MONITORING ASSISTANT

    SBC: Advanced Decision Systems            Topic: N/A

    THIS PROPOSAL CONCERNS THE BASIC RESEARCH AND DEVELOPMENT REQUIRED TO DEFINE AN OPERATIONS MONITORING ASSISTANT (OMA) WHICH IS INTENDED AS A TOOL FOR ASSESSING THE IMPACT OF CURRENT EVENTS ON A CORPS, OR DIVISION LEVEL OPERATIONS PLAN. THE SYSTEM IS PRINCIPALLY CONCERNED WITH FULFILLING AN INDICATIONS AND WARNING FUNCTION, THAT IS, WITH PREDICTING THE CONSEQUENCES OF IMPORTANT BATTLEFIELD EVENTS I ...

    SBIR Phase II 1986 Department of DefenseArmy
  4. AS THE DOD IS MOVING TOWARDS THE LARGE-SCALE USE OF ARTIFICIAL INTELLIGENCE SYSTEMS FOR SUPPORTING DECISION-MAKING AND INFORMATION ANALYSIS, IT BECOMES INCREASINGLY IMPORTANT THAT WE DEVELOP MECHANISMS FOR ASSESSING THE PERFORMANCE OF THESE SYSTEMS.

    SBC: Advanced Decision Systems            Topic: N/A

    AS THE DOD IS MOVING TOWARDS THE LARGE-SCALE USE OF ARTIFICIAL INTELLIGENCE SYSTEMS FOR SUPPORTING DECISION-MAKING AND INFORMATION ANALYSIS, IT BECOMES INCREASINGLY IMPORTANT THAT WE DEVELOP MECHANISMS FOR ASSESSING THE PERFORMANCE OF THESE SYSTEMS. WE BELIEVE THAT ASKING "HOW INTELLIGENT IS THE SYSTEM?" IS NOT THE CORRECT PERFORMANCE QUESTION AND THAT MORE APPROPRIATE ARE "DOES THE SYSTEM HELP TH ...

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  5. SYMBOLIC RF SIGNATURE PREDICTION

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  6. SPATIAL DATA STRUCTURES FOR ROBOTIC VEHICLE ROUTE PLANNING

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  7. DISTRIBUTED ELECTRONIC SIGNAL UNDERSTANDING ADS

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  8. THE OBJECTIVE OF THE PROPOSED STUDY IS TO PROVIDE FOR THE VERY FAST EXECUTION OF THE MINIMUF 3.

    SBC: ADVANCED DIGITAL SYSTEMS, INC.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED STUDY IS TO PROVIDE FOR THE VERY FAST EXECUTION OF THE MINIMUF 3.1 HF PROGATION ALGORITHM WITHIN A PERSONAL COMPUTER. THE EXECUTION TIME GOAL FOR A LATITUDE - LONGITUDE POINT PAIR COMPUTATION IS 1 MILLISECOND OR LESS. THE APPROACH IN THIS PROPOSAL TO ACHIEVE THIS EXECUTION TIME CONSISTS OF TWO ELEMENTS. TH E FIRST ELEMENT IS TO MINIMIZE THE NUMBER OF COMPUTATIONS NECE ...

    SBIR Phase I 1986 Department of DefenseNavy
  9. DIRECT GROWTH/FUSION CIRCUITRY DEVICES ON OPTICAL FIBER

    SBC: Advanced Fiberoptics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  10. A NEW NDE CAPABILITYFOR THIN-SHELLED STRUCTURES

    SBC: Aracor            Topic: N/A

    A POWERFUL, NOW IMAGING MODALITY IDEALLY SUITED FOR THIN-SHELLED STRUCTURES BUT CONSIDERABLY MORE GENERAL IN NATURE IS PROPOSED. THE APPROACH IS BASED ON WELL- ESTABLISHED DIGITAL TOMOSYNTHESIS PRINCIPLES AND MODERN REAL-TIME DIGITAL RADIOGRAPHY TECHNIQUES. A SERIES OF COMPONENT RADIOGRAPHS OF A STRUCTURE TAKEN FROM DIFFERENCE ANGLES ARE MANIPULATED ACCORDING TO A RESTORATIVE ALGORITHM TO RECOVER ...

    SBIR Phase II 1986 Department of DefenseAir Force
US Flag An Official Website of the United States Government