You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A HIGHLY RELIABLE COST-EFFECTIVE CONTINUOUS MCONTINUOUS EMISSION MONITOR

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    THE PURPOSE OF THE PROPOSED PROJECT IS TO PROVIDE A PROOF OFCONCEPT EVALUATION OF AN INSTRUMENT CAPABLE OF MEASURING NO,02, AND SO2 USING UV ABSORPTION AND A PHOTODIODE ARRAY SPECTROPHOTOMETER. IF SUCCESSFUL, THIS INSTRUMENT WOULD SATISFY ALL THE REQUIREMENTS OF A CONTINUOUS EMISSION MONITORING SYSTEM REQUIRED BY THE ENVIRONMENTAL PROTECTION AGENCY. SINCE ALL THREE GASES WOULD BE MEASURED WITH A S ...

    SBIR Phase II 1986 Environmental Protection Agency
  2. CONCERN

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    A PROJECT IS PROPOSED WHERE EXISTING MODELS ARE USED TO PREDICT THE EFFECT OF MULTIPLE BURST AIRSLAP ON HARDENED SILOS. A SMALL NUMER OF THREAT/TARGET CONFIGURATIONS WILL BE SELECTED AS REPRESENTATIVE OF THOSE OF GREATEST INTEREST OR AS BOUNDING THE AIRSLAP PROBLEM. THE MODELS WILL BE EVALUATED AND MATCHED TO THE THREAT/TARGET CASES FOR OPTIMUM PERFORMANCE. THE PREDICTIONS WILL BE TABULATED AS A R ...

    SBIR Phase I 1986 Department of DefenseAir Force
  3. DEVELOPMENT OF A TOTAL PEROXY DETECTOR FOR FLAME AND COMBUSTION MEASUREMENTS

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Energy
  4. DIRECT GROWTH/FUSION CIRCUITRY DEVICES ON OPTICAL FIBER

    SBC: Advanced Fiberoptics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  5. EXPERT ASSISTANT FOR PERFORMANCE ENGINEERING OF LARGE EMBEDDED REAL-TIME SOFTWARE

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    LARGE, EMBEDDED REAL-TIME SOFTWARE DEVELOPMENTS OFTEN LACK PERFORMANCE ENGINEERING EXPERTISE DUE TO A SHORTAGE OF PERFORMANCE EXPERTS. EXPERT SYSTEM TECHNOLOGY OFFERS A SOLUTION TO THE SHORTAGE OF PERFORMANCE ENGINEERING EXPERTS. TWO TECHNICAL OBJECTIVES MUST BE RESEARCHED BEFORE AN EXPERT SYSTEM BASED ASSISTANT FOR PERFORMANCE ENGINEERING CAN BE DEVELOPED: (1) DEFINITION OF A BODY OF UNDERLYING E ...

    SBIR Phase II 1986 Department of DefenseNavy
  6. AN ACTIVE ELECTROCHEMICAL INSTURMENT SYSTEM FOR DETERMIN INATION OF WATER STRESS

    SBC: Agricultural Electronics Corporation            Topic: N/A

    AN ELECTROCHEMICAL INSTRUMENTATION SYSTEM WILL BE DESIGNED AND CONSTRUCTED TO DETERMINE ON COMMAND PLANT WATER STATUS BY MEANS OF CYCLIC VOLTAMMETRY AND/OR COULOSTATICS. THE APPROACH IS BASED ON THE CHANGE IN ELECTROCHEMICAL STATUS OF THE APOPLAST ELECTROLYTE DURING THE NORMAL IRRIGATION CYCLE. A THREE WINDOW MICROPROBE WILL BE FABRICATED ON A SILICON WAFER SUBSTRATE USING THE PLANAR TECHNIQUES CO ...

    SBIR Phase II 1986 Department of Agriculture
  7. ADIABATIC DEMAGNETIZATION REFRIGERATOR FOR USE IN ZERO GRAVITY

    SBC: Alabama Cryogenic Engineering, Inc.            Topic: N/A

    THIS PROJECT COVERS THE DEVELOPMENT OF AN ADIABATIC DEMAGNETIZATION REFRIGERATOR FOR USE IN ZERO GRAVITY AND EMPLOYS AN INNOVATIVE PRECOOLER AND THERMAL SWITCH. IN ADDITION, THE PROJECT INVOLVES THE DESIGN OF A SUPERCONDUCTING MAGNET SYSTEM ENERGIZED BY A SUPERCONDUCTING FLUX PUMP. THE SYSTEM REQUIRES A 2K HEAT SINK FOR OPERATION.

    SBIR Phase II 1986 National Aeronautics and Space Administration
  8. A HELIUM-3/HELIUM-4 DILUTION CRYOCOOLER FOR OPERATION IN ZERO GRAVITY

    SBC: Alabama Cryogenic Engineering, Inc.            Topic: N/A

    THIS PROJECT CONCERNS THE DEVELOPMENT OF A CRYOCOOLER TO OPERATE AT 0.1 K IN ZERO GRAVITY. THE CRYOCOOLER WILL USE THE PRINCIPLE OF DILUTION OF HELIUM-3 SOLUTION BY PURE SUPERFLUID HELIUM-4 FOR THE COOLING EFFECT. A CONVENTIONAL DILUTION REFRIGERATOR REQUIRES GRAVITY FOR OPERATION, SO AN INNOVATIVE TECHNIQUE IS REQUIRED FOR THE ZERO GRAVITY SYSTEM. THE SYSTEM, WHICH REQUIRES A 2 K HEAT SINK, AND C ...

    SBIR Phase II 1986 National Aeronautics and Space Administration
  9. THIS PROPOSAL COVERS THE DEVELOPMENT OF A MULTISTAGE CRYOCOOLER USING THE MIKULIN PULSE TUBE CYCLE.

    SBC: Alabama Cryogenic Engineering, Inc.            Topic: N/A

    THIS PROPOSAL COVERS THE DEVELOPMENT OF A MULTISTAGE CRYOCOOLER USING THE MIKULIN PULSE TUBE CYCLE. THE EFFORT IS DIRECTED TOWARD THE DESIGN OF A HIGH RELIABILITY, LONG LIFETIME 20 K UNIT WITH A REFRIGERATION POWER OF 1 WATT.

    SBIR Phase I 1986 Department of Energy
  10. THIS PROPOSAL COVERS THE DEVELOPMENT OF A FAST COOLDOWN LINDEHAMPSON CRYOCOOLER.

    SBC: Alabama Cryogenic Engineering, Inc.            Topic: N/A

    THIS PROPOSAL COVERS THE DEVELOPMENT OF A FAST COOLDOWN LINDEHAMPSON CRYOCOOLER. BOTH SINGLE STAGE UNITS, REACHING 80 KELVIN, AND MULTI-STAGE UNITS, REACHING APPROXIMATELY 4 KELVIN ARE POSSIBLE. THE UNIT CAN BE USED WITH GAS BOTTLES FOR SHORT TERM USE. FOR LONG LIFETIME EITHER A MECHANICAL OR ABSORPTION COMPRESSOR CAN BE USED. THE UNIT CAN BE SCALED TO MATCH THE COOLING LOAD, AND MICROMINIATURE UN ...

    SBIR Phase I 1986 Department of DefenseAir Force
US Flag An Official Website of the United States Government