You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
NANOSTRUCTURED THERMAL BARRIER COATING BASED ON FILTERED ARC PLASMA SOURCE ION DEPOSITION
SBC: ARCOMAC SURFACE ENGINEERING, LLC Topic: SB062003In an attempt to extend turbine engine on-wing time, thermal barrier coatings (TBC) using various application techniques have been developed. High temperatures corrosion due to penetration of chemically active species along the columnar grains of the topcoat limits the durability of TBCs. This results in degradation of the topcoat thermal insulation ceramic layer and accelerated oxidation of the b ...
SBIR Phase I 2006 Department of DefenseDefense Advanced Research Projects Agency -
ULTRA-LINEAR ELECTRO-OPTIC DIRECTIONAL COUPLER BASED ON HYBRID SOL-GEL/EO POLYIMIDE WAVEGUIDES
SBC: TIPD LLC Topic: SB062016The goal of this proposal is to Design, fabricate, and demonstrate a low optical loss polymer directional coupler modulator with a total insertion fiber to fiber optical loss of less than 6 dB, has a high speed of greater than 20 GHz and a drive voltage (Vp) of less than 1 Volt. We will employ polymer-solgel hybrid modulators that result in reduced fiber-to waveguide loss and enhance the r33 of th ...
SBIR Phase I 2006 Department of DefenseDefense Advanced Research Projects Agency -
ARCTIC COMMUNICATIONS TECHNIQUES: REMOTE UNATTENDED POPOWER SYSTEMS
SBC: General Pneumatics Corporation Topic: N/ADEVELOPMENT IS PROPOSED OF A SMALL, SELF-CONTAINED POWER UNIT CAPABLE OF OPERATING UNATTENDED FOR LONG PERIODS WITH GREAT RELIABILITY. THE UNIT IS INTENDED FOR INCORPORATED AS THE STORAGE BATTERY TRICKLE CHARGER IN A DATA GATHERING AND COMMUNICATIONS SYSTEM FOR THE ARCTIC AND OTHER REMOTE ISOLATED AREAS. THE ENERGY SOURCES ANTICIPATED FOR THE POWERUNIT INCLUDE NUCLEAR (RADIOISOTOPE) AND CHEMICAL ( ...
SBIR Phase I 1985 Department of DefenseDefense Advanced Research Projects Agency