You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Comprehensive Occupational Safety Training (Cost)
SBC: ABACUS HEALTH SOLUTIONS, LLC Topic: N/AWork related injuries and illnesses have risen to their highest level in ten years. Recent Departmestatistics indicate that a total of 6.8 million cases were reported in 1992 at a rate of 8.9 cases pfinancial cost of occupational injuries are in $60 billion range and include such things as medicallegal fees, and lost productivity. These data provide compelling evidence that work-related injuriesas ...
SBIR Phase II 1997 Department of Health and Human Services -
How to evaluate informatio from providers
SBC: ABACUS HEALTH SOLUTIONS, LLC Topic: N/AN/A
SBIR Phase II 1997 Department of Health and Human Services -
COMPREHENSIVE OCCUPATIONAL SAFETY TRAINING (COST)
SBC: ABACUS HEALTH SOLUTIONS, LLC Topic: N/AN/A
SBIR Phase II 1997 Department of Health and Human Services -
Helmsman's Recording Accelerometer (HRA)
SBC: Applied Measurement Systems, Topic: N/ASpecial Operations Forces (SOF) require a real time display of appr opriate data to allow the helmsman to access the damage potential to his cargo (equipment/personnel) and support his decision relative to speed and course selection when operating in rough water. Furthermore, maintenance support personnel need quantitative data to support design decisions and maintenance activities. This proposa ...
SBIR Phase I 1997 Department of DefenseSpecial Operations Command -
SBIR Phase I: Prototype of Health Care Quality Assurance Software for an Internet Environment
SBC: Ck Software, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
Triaxial Fluxgate Azimuth Sensor with Three-Dimensional Autocalibration Capability
SBC: KVH INDUSTRIES, INC. Topic: N/ACrucial to development of improved artillery capabilities is the fielding of tools to assist forward observers and spotter in target designation and fire direction. Notwithstanding its reliability, the conventional lensatic compass leaves much to be desired. The needle aligns itself with the local magnetic field, is attracted by nearby ferromagnetic masses, and can be tilted only a few degrees o ...
SBIR Phase II 1997 Department of DefenseNavy -
SBIR Phase I: ResonantSonic Advanced Oxidation Reactor
SBC: RESODYN CORPORATION Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
Use Of Mycotrol Residue Containing B. Bassiana
SBC: Mycotech Corporation Topic: N/AMycotech produces Mycotrol, a commercial preparation of Beauveria bassiana (Bb). The residuecontains 109 spores of Bb per gram which could be economically used to reduce European corn borer(ECB) damage to corn crops. The objective is to develop an economic bio-control strategy for ECB.Three strategies for applying the Mycotrol residue to corn are proposed:¿ inoculating the seed and/or soil duri ...
SBIR Phase I 1997 Department of Agriculture -
Compositionally Tuned Solid-State Laser Materials
SBC: SCIENTIFIC MATERIALS CORP. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Quantum Dots: Next Generation of Electronic Phosphors
SBC: Spectra Science Corp. Topic: N/ACurrent CRT phosphors rely upon 3-12 micron sized semiconductor grains to convert the electron beam emitted by the cathode into light. These phosphors suffer from low conversion efficiencies (25%), and efforts to improve these systems over the past few decades by altering the stoichiometry have resulted in only minor improvements. Quantum Dot Phosphors(TM) (QDP(TM)) of doped and undoped II-VI semi ...
SBIR Phase II 1997 Department of DefenseMissile Defense Agency