You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Automated Through Thickness Reinforcement for Affordable & Robust High Temperature Composite Structures

    SBC: James L. Gallagher, Inc.            Topic: DLA231D07

    The national imperative to field hypersonic weapon systems has increased the demand for robust, lightweight, and affordable high temperature materials for thermal protection systems.  Refractory composites such as carbon-carbon (C/C) or carbon/SiC (C/SiC) offer enormous promise, but wider-scale acceptance continues to be hindered by certain technical and affordability limitations.  Key among the ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  2. CYRIN-OT: Advanced Cyber Range for Operational Technology Digital Twins

    SBC: ATC-NY INC            Topic: DLA232004

    Industrial control system (ICS) operational technology (OT) systems enable increased process efficiency and cost savings.  At the same time, they allow for increasingly complex cyber-attacks with devastating physical impacts.  The ATC-NY team will design and build CYRIN-OT, a system for creating virtual “digital twins” of OT networks and performing security assessments on them.  Any diverge ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  3. Parts Life, Inc. 20.2 Phase II Proposal

    SBC: PARTS LIFE INC            Topic: DLA202001

    For this Phase II, Parts Life, Inc. is proposing to improve product availability and increase competition through the development of Source Approval Requests (SAR) for NSNs 5330-00-992-1516 Seal Ring Metal, 5330-00-798-2704 Seal Ring Metal, 5330-00-796-9180 Gasket, 5331-01-010-2929 O-Ring, 5331-00-425-9124 O-Ring, 5331-00-618-3447 O-Ring, 4820-01-202-6339 Seat, Valve, 5310-00-164-1100 Wash ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  4. PLI Response to DLA232-001 NSN 5935-00-459-9640

    SBC: PARTS LIFE INC            Topic: DLA232001

    Parts Life, Inc. is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for 5935-00-459-9640, Connector, Receptacle, Electrical. Parts Life, Inc. will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The intent is that upon SAR approval by a ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  5. PLI Response to DLA232-001 NSN 5330-00-242-6875

    SBC: PARTS LIFE INC            Topic: DLA232001

    Parts Life, Inc. is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for 5330-00-242-6875 Seal, Plain Encased. Parts Life, Inc. will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The intent is that upon SAR approval by an ESA, Parts Li ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  6. 97ND7-SP4701-22-P-0061-Phase II Report-Innovative Approaches to the Headlamp Redesigns

    SBC: MAGWERKS VISION INC.            Topic: DLA222002

    GVSC Sustainment Engineering has requested information for a project to replace Lamp, Halogen 12360840-1 due to stock issues. MWV has met with the team and understand the request. Based upon initial concept discussions, MWV has the ability to design and supply a replacement solution. This will include removing existing Lens, Lamp, Reflector and all hardware needed for these items. MWV will then re ...

    SBIR Phase II 2023 Department of DefenseDefense Logistics Agency
  7. Commercial Applications for Recycled Rare Earth Zirconate Thermal Barrier Coating Materials

    SBC: XYLON TECHNICAL CERAMICS INC.            Topic: DLA202009

    This Phase II project seeks to develop a method for the recycling of rare earth zirconate thermal barrier coatings (TBCs). Thermal barrier coatings are crucial to the function and performance of military aircraft engines, as they influence the operating temperatures and environments for the aircrafts. There are currently two main types of established thermal barrier coating materials, yttria-stabi ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  8. Reverse Engineering Technical Data Packages for Development of Alternate Source of Supply for DLA NSNs

    SBC: PARTS LIFE INC            Topic: DLA183001

    In the Phase I effort, contract number SP4701-19-P-0032, Parts Life, Inc. utilized its proven SAR process to replicate Tool Set, Dome Nut, NSN 4920-01-284-0198. Using the company’s unique and revolutionary R.O.P.E.™ (Rapid Obsolescence Planning and Execution) process to create a complete technical and manufacturable drawing package, Parts Life provided a solution to a problem that has become i ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  9. Rapid densification for solid-state electrolyte production

    SBC: ZAKURO INC            Topic: DLA203004

    Solid-state batteries promise energy densities well beyond that of current Li-ion batteries while providing additional safety through the elimination of the flammable liquid electrolyte. Of the solid-electrolytes currently under development, Li7La3Zr2O12 (LLZO) is attractive due to its inherent stability versus Li metal. One drawback for LLZO and any oxide electrolyte is the high temperatures requ ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
  10. PLI 20.2 Phase II

    SBC: PARTS LIFE INC            Topic: DLA202001

    In the Phase I effort, Parts Life, Inc. utilized its proven SAR process to replicate NSNs. Using the company’s unique and revolutionary R.O.P.E.™ (Rapid Obsolescence Planning and Execution) process to create a complete technical and manufacturable drawing package, Parts Life provided a solution to a problem that has become increasingly more critical. All the drawings, specifications, sources, ...

    SBIR Phase II 2022 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government