You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Visual Ontological Language for Technical Standards (VOLTS)

    SBC: Aztera, LLC            Topic: 9010273R

    Current research shows that failures in the standardization process are often the result of a failure of the participants to communicate or organize. To this effect, NIST has developed a tool, NIST Ontological Visualization Interface for Standards (NOVIS), with an environment for visualizing, browsing, and querying standards. Aztera will create a Computer Aided Standards Development (CASD) framewo ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  2. A Tool for Building Semantically Interoperable Specification and Standards

    SBC: XSB INC            Topic: 9010273R

    Standards and specifications are widely used in government and industry to define requirements for products and processes and insure interoperability, safety, and quality of industrial and domestic products. Specifications and standards documents almost always cross-reference other standards and specification. Taken together, the web of interdependent standards forms an immensely important knowled ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  3. Secure Email Agent Using the Domain Name System (DNS) as a Trust Infrastructure

    SBC: Grier Forensics, LLC            Topic: 9020377R

    Although protocols for securing email have been available for over twenty years, these protocols, by nature of their use of asymmetric cryptography, require users to have the public key or certificate of the correspondents. Grier Forensics will develop technology to use the Domain Name System (DNS) to distribute certificates and keys, making email secure, authenticated, and confidential, curbing t ...

    SBIR Phase II 2015 Department of CommerceNational Institute of Standards and Technology
  4. GlobalSense: A New Atmospheric Observing System Featuring Innovative Airborne Probes

    SBC: MANO NANOTECHNOLOGIES INC            Topic: 861X

    The underlying framework for modern-day weather forecasting is numerical weather prediction (NWP). Even the current and planned weather observing platforms leave gaps that are insufficient to meet the requirements of NWP. Mano Nanotechnologies, Inc. proposes a new environmental sensing system, known as “GlobalSense”, which will enable transformational forecast improvements by filing these crit ...

    SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  5. IGF OT IGF "SBIR PHASE I NEW D HUBIOGEL CULTURE SYSTEM FOR CANCER STEM CELLS EXPANSION and ANALYSIS"

    SBC: Vivo Biosciences Inc            Topic: NCI

    Not Available

    SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health
  6. IGF OT IGF ANGIOCRINE BIOSCIENCE INC

    SBC: Angiocrine Bioscience            Topic: NCI

    Not Available

    SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health
  7. IGF OT IGF A STAGE BASED MOBILE INTERVENTION FOR SUBSTANCE USE DISORDERS IN PRIMARY CARE N DA POP SEPTEMBER FEBRUARY BASE AWARD

    SBC: Pro-Change Behavior Systems, Inc.            Topic: NIDA

    Not Available

    SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health
  8. IGF OT IGF BASE AWARD STANDARDIZED RECHARGEABLE ELECTRONIC NICOTINE DELIVERY SYSTEM POP MARCH THROUGH NOVEMBER N DA EXTEND THE PERIOD OF PERFORMANCE FOR NO ADDITIONAL

    SBC: NJOY Inc.            Topic: NIDA

    Not Available

    SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health
  9. IGF OT IGF DEVELOPMENT OF NOVEL THERAPEUTIC AGENTS THAT TARGET CANCER STEM CELLS

    SBC: NeoStem, Inc.            Topic: NCI

    Not Available

    SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health
  10. IGF OT IGF DEVELOPMENT and CHARACTERIZATION FDA COMPLIANT ELECTRONIC VAPOR BASED COMBINATION PRODUCT POP N DA SBIR I BASE AWARD

    SBC: WHAT A SMOKE L.L.C.            Topic: NIDA

    Not Available

    SBIR Phase I 2015 Department of Health and Human ServicesNational Institutes of Health
US Flag An Official Website of the United States Government