You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Anion Exchange Resin for Chirality-based Separation of Single-wall Carbon Nanotubes
SBC: Sepax Technologies, Inc. Topic: N/ASepax Technologies, Inc. has identified a new type of anoin-exchange resin which separates single-wall carbon nanotubes (SWCNTs) with >80% recovery yield and resolves in a single pass the chiral tubes of (6,5) well from commercial SWCNT starting materials by Chromatography. Improvement and scale up of the targeted resin production will facilitate the separation of chiral nanotubes for the academic ...
SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology -
A Tool for Building Semantically Interoperable Specification and Standards
SBC: XSB INC Topic: 9010273RStandards and specifications are widely used in government and industry to define requirements for products and processes and insure interoperability, safety, and quality of industrial and domestic products. Specifications and standards documents almost always cross-reference other standards and specification. Taken together, the web of interdependent standards forms an immensely important knowled ...
SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology -
GlobalSense: A New Atmospheric Observing System Featuring Innovative Airborne Probes
SBC: MANO NANOTECHNOLOGIES INC Topic: 861XThe underlying framework for modern-day weather forecasting is numerical weather prediction (NWP). Even the current and planned weather observing platforms leave gaps that are insufficient to meet the requirements of NWP. Mano Nanotechnologies, Inc. proposes a new environmental sensing system, known as “GlobalSense”, which will enable transformational forecast improvements by filing these crit ...
SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Probability Forecasts of Business Impact Variables From CFS2 Ensembles
SBC: PRESCIENT WEATHER LTD Topic: 831CThe value of the subseasonal and seasonal probability forecasts of the National Weather Service (NWS) will be enhanced when the information about standard meteorological variables is converted into information about business impact variables such as degree days, wind and solar power potential, and end-of-season crop yield. Toward that goal, in Phase I we will identify a suite of such action variab ...
SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Visual Ontological Language for Technical Standards (VOLTS)
SBC: Aztera, LLC Topic: 9010273RCurrent research shows that failures in the standardization process are often the result of a failure of the participants to communicate or organize. To this effect, NIST has developed a tool, NIST Ontological Visualization Interface for Standards (NOVIS), with an environment for visualizing, browsing, and querying standards. Aztera will create a Computer Aided Standards Development (CASD) framewo ...
SBIR Phase I 2015 Department of CommerceNational Oceanic and Atmospheric Administration -
Whimbrel Unmanned Aircraft System-Borne Atmospheric and Sea Surface Temperature (SST) Sensor
SBC: PIASECKI AIRCRAFT CORP Topic: 845RWPPiasecki Aircraft (PiAC) proposes to continue development and testing efforts of the Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel UAS, a low cost, expendable, air-deployed weather survey unmanned aircraft system. The Whimbrel USA has been developed to support the Tropical Cyclone Boundary Layer mission requirements and contains sensors an ...
SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration