You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  2. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  3. Code Ray: Software Assurance Risk Management Framework for Hybrid Analysis Mapping

    SBC: APPLIED VISIONS, INC.            Topic: HSB0131002

    Two methods for analyzing software security risks are dynamic application security testing (DAST) - an outside in perspective - and static application security testing (SAST) - and inside out perspective. Both have shortfalls. DAST findings do not give insight into the root cause, making remediation time consuming. SAST tools give you full breadth, but warn of weaknesses that are not exploitable. ...

    SBIR Phase I 2013 Department of Homeland Security
  4. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  5. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  6. Subsurface Communications System for Robotics

    SBC: Sandia Research Corporation            Topic: DHS002

    Underground cross-border tunnels of all sizes and shapes are an increasingly important threat to our National security. Finding cross-border tunnels is a challenging task and once found, an additional challenge is secure and map the entire underground tunnel. Manned entry into these dangerous underground environments is a risky endeavor. The use of robotics offers a great improvement over human en ...

    SBIR Phase II 2013 Department of Homeland Security
  7. Transmedia: Augmented Reality Game For Essential Transfer Of Science

    SBC: SECOND AVENUE SOFTWARE, INC.            Topic: N/A

    The project team is developing a prototype of a web-based game utilizing the illustrations of chemical elements and science terms created by Simon Basher in his three books, The Periodic Table: Elements with Style!, Chemistry: Getting a Big Reaction!, and Physics: Why Matter Matters! The game will incorporate augmented reality (person-to-person gameplay with the support of the software) to teach g ...

    SBIR Phase I 2013 Department of Education
  8. Teachley: Math Facts – Design And Development Of Intervention Software Promoting Single-Digit Operational Fluency

    SBC: TEACHLEY, LLC            Topic: N/A

    The web-based game, MathFacts, will include a series of apps for touch-screen tablet computers to support math learning for 1st to 4th grade students with major or sometimes intractable learning difficulties. In the game, students will learn content through mini-lessons, engage with problems in practice and speed rounds, and then receive formative feedback on their performance. Students will use ...

    SBIR Phase II 2013 Department of Education
  9. Designing a mini-pilot scale unit for extraction and electrospinning of chitin as an adsorbent for uranium from seawater

    SBC: 525 Solutions, Inc.            Topic: 19g

    With the 4 billion tons of uranium estimated to be dissolved in the earth & apos;s oceans, an essentially unlimited resource is available to those with easy and affordable access. With decades of research towards the extraction of uranium from seawater, focus has been directed towards the selectivity of the adsorbent material, the cost of the material, and the ability of the adsorbent to be recycl ...

    SBIR Phase I 2013 Department of Energy
  10. A Compact and portable laser Ultrasound Visualization Tool for Non-destructive Evaluation of Nuclear Reactor Components

    SBC: ALPHASENSE, INC.            Topic: 19e

    To ensure safe and reliable power production by nuclear power plants, a wide variety of materials and components need to undergo inspections and maintenances at pre-determined intervals. Condition based maintenance is highly desirable because it can potentially avoid unnecessarily costly maintenance actions and associated error induced failures. Consequently, it can help achieve nearly all the mai ...

    SBIR Phase I 2013 Department of Energy
US Flag An Official Website of the United States Government