You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Pan3D: Open Source Scalable and Reproducible Scientific Workflows for 3D Data Analytics
SBC: KITWARE INC Topic: C5301aC53-01a-271272The problem to be addressed arises from the recent and rapid growth of large three- dimensional (3D) and time-varying datasets produced from sensor/observation systems, numerical simulation, and AI models and the current difficulties incorporating these data into research workflows in many data science communities. To address this problem, Pan3D will fill critical needs for (i) data ...
SBIR Phase II 2023 Department of Energy -
Advanced Manufacturing and Smoothing of X-Ray Mirrors, Phase II
SBC: OPTIMAX SYSTEMS, INC. Topic: C5307aC53-07a-271318The advancement of grazing incidence X-ray optic technologies brings promise of new discoveries and novel applications for synchrotron applications, space exploration, and more. However, these goals are limited by the current state of the art of domestic manufacture and metrology of diffraction-limited x-ray mirrors, specifically those for synchrotron applications. This proposal outl ...
SBIR Phase II 2023 Department of Energy -
SBIR Phase II:Development of a Flow Battery Using Common Materials and Proprietary Electrolytes
SBC: XL BATTERIES INC Topic: ENThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project is the development of a grid-scale battery to enable large-scale, long-duration energy storage. New technologies for long-duration energy storage are required to solve the challenge of renewable energy intermittency. The widespread deployment of a new battery technology based on ubiquitous an ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II:Novel photographic steganography to reduce digital piracy on live streaming platforms
SBC: Steg AI Corporation Topic: AIThe broader impact of this Small Business Innovation Research (SBIR) Phase II project will be to reduce video and image copyright-related liability for social media companies and retain profits for digital media licensing companies and other content owners/distributors who are holding or enforcing content rights. Beyond content protection, the technology being developed can also address the emergi ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II:Point-of-Care Electrochemical Platform for the Rapid Detection of Drug Toxicity
SBC: Infusense Topic: BMThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project is that poisoning by drugs of abuse affects almost 3 million people annually and is the leading cause of injury-related death in the United States. There were 100,306 opioid overdose deaths in the US in 2021, the majority of which were due to fentanyl poisoning. Screening patients for toxic d ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II:Sensor-based bra to measure breast milk output and monitor changes in breast volume before and after breastfeeding or breast pumping
SBC: LILU INC Topic: MDThe broader impact/commercial impact of this Small Business Innovation Research (SBIR) Phase II project impacts mothers and babies during the breastfeeding period. Although breastfeeding benefits for the mother and the baby are recognized worldwide, many mothers are unable to attain their breastfeeding targets due to common discontinuance problems. The proposed solution may increase breastfeeding ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II: MicroLINKs: connecting the physical and digital worlds
SBC: OWIC TECHNOLOGIES INC Topic: SPThe broader impact/commercial potential of this Small Business Research Innovation (SBIR) Phase II project is to reduce the economic, human, and environmental cost caused by the current disconnect between an object and its digital history. At the human level, consider hospital use cases: medical errors are estimated to kill upwards of 90,000 people annually. Many of these deaths can be traced to a ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II:An AI-Enhanced Angiographic System to Guide Endovascular Treatment of Intracranial Aneurysms
SBC: QAS.AI INC. Topic: AIThe broader impact of this Small Business Innovation Research (SBIR) Phase II project is improving the surgical outcome for patients undergoing neuro-endovascular interventions for the treatment of intracranial aneurysms (IAs). IAs affect 6% of the population and IA rupture results in lethal hemorrhagic strokes, which account for ~25% of cerebrovascular deaths despite improvements in management. M ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II:Analog front end (AFE) platform for lightweight, long-term, cortical monitoring
SBC: Neurodyne, Inc. Topic: BMThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project provides next generation ambulatory seizure data acquisition. The advent of mobile health advances during the COVID-19 health crisis have enabled new innovations to be considered. This effort provides a framework for the next line of remote neurological data acquisition capabilities for the i ...
SBIR Phase II 2023 National Science Foundation -
SBIR Phase II:Scaling of a Rapid Aerogel Insert Manufacturing System for High Performance Windows.
SBC: SUNTHRU LLC Topic: MThe broader/commercial impact of this Small Business Innovation Research (SBIR) Phase II project is the development of a cost-effective, transparent, aerogel-based window insert that can be used to make high-performance windows that will fit in a double-pane footprint and achieve triple-pane performance. This project will contribute knowledge to the technological challenges associated with scaling ...
SBIR Phase II 2023 National Science Foundation