You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 4528 results
  1. Acoustic Internal Automated Concrete Tie Tester

    SBC: NDT CORPORATION            Topic: 23FR1

    NDT Corp. will take the currently developed ACTT system, which can accurately assess the internal condition of concrete crossties and increase its speed.FRA 23-FR1 requests a system that at high speeds can assess both the internal and external condition of concrete crossties.Currently there are systems that can perform the external assessment at the required speeds.However, there is no system that ...

    SBIR Phase I 2023 Department of Transportation
  2. Active Material Technology to Improve Solar Sail Performance for Space Weather Monitoring

    SBC: NEXOLVE HOLDING CO LLC            Topic: 96

    Development of a reflection control and direction device (RCDD) is proposed. This innovative device will progress the state of the art for propulsion of solar sails used to fly space weather monitoring sensors to sub-LaGrange point orbits for earlier warning times of impending destructive space weather events. A reflection control device (RCD) utilizes polymer dispersed liquid crystal (PDLC) mater ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Developing the Drought Risk Overview Product (DROP): Improving Flash Drought Forecasts and Early Warning Using Machine Learning and Extreme Value Theory Techniques

    SBC: CFD RESEARCH CORPORATION            Topic: 91

    Drought is responsible for $327.7B in economic loss since 1980 in the United States and typically precedes, cooccurs, or initiates other hazards like wildfires or prolonged periods of intense heat. The compounding or cascading of these hazards routinely threatens the wellbeing and stability of communities. The economic impact from drought can be especially harsh when the drought begins rapidly in ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Jaia Robotics, Inc.

    SBC: Jaia Robotics, Inc.            Topic: 96

    "Jaia Robotics’ low-cost, micro-sized hybrid uncrewed surface/underwater vehicles called JaiaBotsTM can be deployed from the shore or vessels. The system enables truly affordable multivehicle operations that can be scaled to provide wide area synoptic data collection. In the proposed effort the project team will develop a JaiaBot which is air-deployable from sonobuoy launch tubes to collect atmo ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Enabling Expanded Crowdsourced Bathymetry Contributions With High Quality Metadata Via Commercially Sustainable Incentives To Contributors

    SBC: FARSOUNDER INC            Topic: 93

    A cloud based system for sharing bathymetric survey data collected by FarSounder customers is proposed as a way(1) to improve safety of navigation on our oceans, (2) to collect measurements for the broader scientific and maritime communities and (3) to generally explore and broadly share information about our oceans in fulfillment of ideas proposed in Topic 9.3 “The Changing Ocean”, and in acc ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  6. E-Textile Enabled Active Monitoring System (E-TEAMS)

    SBC: VIVONICS INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  7. Human Performance Monitoring Blast Environment

    SBC: Organic Robotics Corporation            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  8. Electroneurography for Muscle Fatigue

    SBC: PISON TECHNOLOGY INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  9. An Easily Integratable Wearable Real-Time Cognition & Physiological Monitoring Device for Human Performance Optimization

    SBC: NEURABLE INC.            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  10. A Garment-Embedded Physiological Monitoring Solution for Defense and Commercial Applications

    SBC: HUMAN SYSTEMS INTEGRATION INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government