You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Geo-registration of Aerial Imagery Using 3-D Volumetric Models

    SBC: VISION SYSTEMS INC            Topic: NGA11001

    With the advancement of aerial imaging sensors, high quality data equipped with partial sensor calibration models is available. There is a recent research activity in computer vision community that aims to reconstruct 3-d structure of the observed scenes relying on the content of the imagery in fully automated ways. However the research has not matured into robust systems ready for operational set ...

    SBIR Phase II 2013 Department of DefenseNational Geospatial-Intelligence Agency
  2. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: Advanced Engines Development Corporation            Topic: 142OS1

    U.S. DOT’s Zero Emissions Transportation Initiative is looking to push the transportation sector greenhouse gas production to zero by 2050. This solicitation/topic addresses alternative energy sources for the light vehicle, motorcycle, and bicycle sector. With the continuing significant development in commercialization and availability of biofuels, the possibility exists to meet this goal, with ...

    SBIR Phase I 2015 Department of Transportation
  3. Parking-Cruising Caused Congestion & Targeting Public Mitigation Investments

    SBC: NELSON/NYGAARD CONSULTING ASSOCIATES, INC.            Topic: 142FH2

    Cruising for parking is a problem that cities have long struggled to address. Recent efforts by the FHWA in San Francisco, Minneapolis, Los Angeles, and other cities have advanced the state of knowledge but large gaps remain. This project seeks to address these important gaps by using GPS traces, GPS-augmented travel surveys, and GPS traces with driver video to quantify the extent of cruising, and ...

    SBIR Phase I 2015 Department of Transportation
  4. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: INNOVATIVE DYNAMICS INC.            Topic: 142OS1

    IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commute, specifically targeting areas and demographics with below average bicycle usage, and adverse weather conditions. This design is intended for usage alongside traditional bikes in bike share programs across the country. The primary benefit is attract those otherwise unwilling or unab ...

    SBIR Phase I 2015 Department of Transportation
US Flag An Official Website of the United States Government