You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: Advanced Engines Development Corporation            Topic: 142OS1

    U.S. DOT’s Zero Emissions Transportation Initiative is looking to push the transportation sector greenhouse gas production to zero by 2050. This solicitation/topic addresses alternative energy sources for the light vehicle, motorcycle, and bicycle sector. With the continuing significant development in commercialization and availability of biofuels, the possibility exists to meet this goal, with ...

    SBIR Phase I 2015 Department of Transportation
  2. Parking-Cruising Caused Congestion & Targeting Public Mitigation Investments

    SBC: NELSON/NYGAARD CONSULTING ASSOCIATES, INC.            Topic: 142FH2

    Cruising for parking is a problem that cities have long struggled to address. Recent efforts by the FHWA in San Francisco, Minneapolis, Los Angeles, and other cities have advanced the state of knowledge but large gaps remain. This project seeks to address these important gaps by using GPS traces, GPS-augmented travel surveys, and GPS traces with driver video to quantify the extent of cruising, and ...

    SBIR Phase I 2015 Department of Transportation
  3. Teachley Analytics Library: A Collection of Educational Apps Personalizing Gameplay and Reporting Insights

    SBC: TEACHLEY, LLC            Topic: EDIES15R0005

    This project team is developing and testing a prototype of the Teachley Analytics Library, a platform intended to host third party-developed mathematics game apps for students in kindergarten through Grade 8. The prototype will include a dashboard to host games and generate formative assessment data to inform teacher instruction. In the Phase I pilot study, the team will examine whether the protot ...

    SBIR Phase I 2015 Department of EducationInstitute of Education Sciences
  4. Tutoring With The Lightning Squad: Integrating Technology, Peers, and Home for Reading Success

    SBC: Sirius Thinking Ltd            Topic: ed15c0026

    Video Demonstration of the Phase I Prototype: https://www.youtube.com/watch?v=E-wxSuE2Tcc Purpose: This project team will develop and test a multimedia platform, The Lightning Squad, designed to guide teachers in providing tutoring sessions to small groups of struggling readers. Grade 3 students who read below grade level are more likely to drop out of high school than peers who read at grade lev ...

    SBIR Phase II 2015 Department of Education
  5. Just-In-Time Contextualized Reading Assistant for ESL Students

    SBC: CHARMTECH LABS LLC            Topic: edIES15R0005

    This project team will develop and test a prototype of the ESL Reading Assistant, intended to strengthen reading and listening skills of English as Second Language students. The web-based prototype will help students understand complex words and passages while reading. Based on user feedback, the product will adapt to provide personalized just-in-time supplemental information. In the Phase I pilot ...

    SBIR Phase I 2015 Department of EducationInstitute of Education Sciences
  6. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: INNOVATIVE DYNAMICS INC.            Topic: 142OS1

    IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commute, specifically targeting areas and demographics with below average bicycle usage, and adverse weather conditions. This design is intended for usage alongside traditional bikes in bike share programs across the country. The primary benefit is attract those otherwise unwilling or unab ...

    SBIR Phase I 2015 Department of Transportation
  7. On-Line Instructional Tools for Teaching Mathematical Problem Solving to Learning Disabled Students

    SBC: LEARNIMATION            Topic: N/A

    N/A

    SBIR Phase I 2001 Department of Education
  8. Fair and Appropriate Community Employment (FACE): A Management Information System (MIS) for Evaluating Impact of Employment Programs on Persons with Disabilities

    SBC: Research Solutions International            Topic: N/A

    N/A

    SBIR Phase I 2001 Department of Education
  9. Fair and Appropriate Community Employment (FACE): A Management Information System (MIS) for Evaluating Impact of Employment Programs on Persons with Disabilities

    SBC: Research Solutions International            Topic: N/A

    N/A

    SBIR Phase II 2001 Department of Education
  10. NESSI (New England Shipwreck Survey Initiative) Geographic Information System (GIS)

    SBC: Stefan Claesson & Associates            Topic: N/A

    Submerged archaeological sites contain a significant part of our historical legacy-one that is increasingly threatened by development, vandalism and natural forces. In recognition of that legacy, the New England Shipwreck Survey Initiative (NESSI) has been planned in order to identify and preserve the maritime archaeological resources of the region. A computerized database, specifically a Geogra ...

    SBIR Phase I 2001 Department of Transportation
US Flag An Official Website of the United States Government