List
The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.
-
Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector
SBC: ADVANCED ENGINES DEVELOPMENT CORPORATION Topic: 142OS1U.S. DOT’s Zero Emissions Transportation Initiative is looking to push the transportation sector greenhouse gas production to zero by 2050. This solicitation/topic addresses alternative energy sources for the light vehicle, motorcycle, and bicycle sector. With the continuing significant development in commercialization and availability of biofuels, the possibility exists to meet this goal, with ...
SBIR Phase I 2015 Department of Transportation -
Portable Rail Suspension Displacement Monitoring System
SBC: DFUZION, INC. Topic: 151FR9dFuzion proposes the development of a comprehensive Ride Performance Assessment System (RPAS). RPAS leverages the investment and research already made by FRA in its sponsored portable ride quality meter. By extending the ride quality data acquistion framework to accept inputs from suspension displacement sensors, RPAS can correlate data from acceleration and displacement sensors with geospatial in ...
SBIR Phase I 2015 Department of Transportation -
Technology to Improve upon APC Data Counting that will Provide Better Correlation to Service Plan
SBC: DZYNE Technologies Incorporated Topic: 142FT1DZYNE Technologies proposes an application of state-of-the-art computer vision technology to construct the Passenger Analytics Advanced Sensing (PAAS) System. PAAS introduces a degree of algorithm intelligence to the problems of automated passenger counting and route determination in a manner that supports the use of existing sensors inside vehicles and within transportation centers. PAAS provides ...
SBIR Phase I 2015 Department of Transportation -
Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector
SBC: INNOVATIVE DYNAMICS INC Topic: 142OS1IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commute, specifically targeting areas and demographics with below average bicycle usage, and adverse weather conditions. This design is intended for usage alongside traditional bikes in bike share programs across the country. The primary benefit is attract those otherwise unwilling or unab ...
SBIR Phase I 2015 Department of Transportation -
Parking-Cruising Caused Congestion & Targeting Public Mitigation Investments
SBC: NELSON/NYGAARD CONSULTING ASSOCIATES, INC. Topic: 142FH2Cruising for parking is a problem that cities have long struggled to address. Recent efforts by the FHWA in San Francisco, Minneapolis, Los Angeles, and other cities have advanced the state of knowledge but large gaps remain. This project seeks to address these important gaps by using GPS traces, GPS-augmented travel surveys, and GPS traces with driver video to quantify the extent of cruising, and ...
SBIR Phase I 2015 Department of Transportation -
Browser Based Application for Locomotive Inspection Data Collection
SBC: Benten Technologies, Inc. Topic: 151FR5Benten Technologies proposes to develop a back-end schema-less, open source, cloud-based database with front-end browser-based, cross-platform JavaScript model library to support locomotive inspection data collection. TRAIN will allow for the logging of inspection data for all types of locomotives including steam, diesel, diesel-electric, and electric locomotives by railroad and locomotive manufac ...
SBIR Phase I 2015 Department of Transportation -
STEM Education- Increasing awareness about Intelligent Transportation Systems and Connected Vehicle Technologies for High School Students
SBC: Nanosonic Inc. Topic: 141FH4NanoSonic will work with the Giles County School System and Leidos transportation engineers to develop STEM lesson plans concerning ITS and CV technologies, and will demonstrate their use in the classroom with Middle School and High School teachers and students. During Phase I, twenty draft lesson plans were developed, ten for Middle School and ten for High School. During Phase II, these plans w ...
SBIR Phase II 2015 Department of Transportation -
Development of a Thermographic Device for Evaluating Integrity of Steel Bridge Coatings Nondestructively
SBC: Fuchs Consulting Inc Topic: 091FH2This effort is advancing the development of a nondestructive evaluation (NDE) tool for quantitative assessment of highway bridge coatings, the Infrared Coating Inspection System (IR‐CIS). The IR‐CIS can be used to improve decision‐making regarding over‐coating or recoating of bridges, by better and more fully quantifying the current condition of coatings in ways not possible using only vis ...
SBIR Phase II 2015 Department of Transportation -
WEB-BASED TOOLS TO ENHANCE LIVESTOCK INFRASTRUCTURE IN REGIONAL and LOCAL FOOD SYSTEMS
SBC: Bos Native Meats, LLC Topic: 812This project seeks to introduce web-based technology tools to the livestock industry that would equilibrate business risks between farmer and processor, moving the relationships toward mobile technology for convenience and reliability, and increasing business efficiency for both parties.Our project is designed to make small to mid-sized livestock farms more profitable by assuring the availability ...
SBIR Phase I 2015 Department of Agriculture -
Innovative Low Cost Solar Air Heating for Poultry House Ventilation
SBC: AMERICAN SOLAR INC Topic: 812American Solar, Inc. proposes to research and analyze two low cost solar air heating systems for poultry houses. The solar heating systems will use an existing poultry house metal roof and a new wall-mounted, solar curtain system to harvest renewable, solar heated air. The solar heated air will displace cold outside ventilation air that would be brought into the house and require heating by non-re ...
SBIR Phase I 2015 Department of Agriculture