You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Design Tools for Combustion Stability
SBC: IN SPACE, L.L.C. Topic: AF083112ABSTRACT:A joint experimental and computational project using a carefully designed, flexible test article is proposed to assess the velocity-coupled combustion response of a representative liquid rocket injector element to transverse acoustic disturbances. In the proposed Phase II, the response of an injector flowfield at supercritical pressure conditions will be simulated, measured, and reduced i ...
SBIR Phase II 2015 Department of DefenseAir Force -
Surface Treatments for Stainless Steel Actuators
SBC: IBC Materials & Technologies, LLC Topic: AF131202ABSTRACT: Stainless steel ballscrew components, such as those found in landing gear and flap actuators on the C-130 aircraft, experience wear and subsequent failure due to corrosion, contamination and foreign object damage (FOD). High"dither"conditions, where the actuator undergoes a constant short-travel, high-frequency movement to maintain level flight, can also induce wear on actuator ballscr ...
SBIR Phase I 2015 Department of DefenseAir Force -
Method for Evaluating Candidates for Additive Manufacturing (AM) Processes
SBC: IMAGINESTICS, LLC Topic: AF141213ABSTRACT: A challenge which continues to present a barrier to the utilization of AM and wide spread adoption is knowing when to use the technology. This is particularly problematic in aerospace and in MRO operations because the technology is still emerging, and knowledgeable, experienced practitioners remain in short supply and will likely remain so until the next generation of technicians and en ...
SBIR Phase I 2015 Department of DefenseAir Force -
SIGMA: Speedy Imagery Geo-registration and Motion Analysis
SBC: VISION SYSTEMS INC Topic: AF131151ABSTRACT: VSI proposes the development of the SIGMA (Speedy Imagery Geo-registration and Motion Analysis) system, which will address three key requirements by the end of Phase II: (i) adapt to different type of sensors, sensor-configurations and sensor operating conditions, (ii) handle large amount of data in real-time or close to real-time using limited resources, and (iii) operate under conditi ...
SBIR Phase II 2015 Department of DefenseAir Force -
Advanced Propulsion and Power Concepts for Large Size Class Unmanned Aerial Systems (UAS)
SBC: ENGINE RESEARCH ASSOCIATES INC Topic: AF131160ABSTRACT: Desired tactical requirements for unmanned aerial systems (UASs) exceed current capabilities for performance, reliability, maintainability, cost and supportability. Mission requirements such as extended endurance, increased power for auxiliary/sensor systems, and low altitude, low speed maneuverability are becoming paramount, specifically, in the 10,000 lb class of vehicles. These desir ...
SBIR Phase II 2015 Department of DefenseAir Force -
Thermally Stable High Energy Lithium-Ion Batteries for Naval Aviation Applications
SBC: Yardney Technical Products, Inc. Topic: N08017Yardney is proposing to take the technology we have previously developed in Phase 1 and move toward thinner cell designs to meet the extreme temperature and power requirements of the next generation of high power Naval Aircraft. Just as the optimum Hybrid Electric Vehicle batteries were a step towards more power and thus thinner design, the optimum battery for high power, high energy Naval aviatio ...
SBIR Phase II 2015 Department of DefenseNavy -
A Universal Device for Performing Cricothyrotomies
SBC: WOLF TECHNICAL SERVICES INC Topic: DHP13015The purpose of this Phase II program is to develop an innovative, low cost, all-in-one surgical instrument for performing cricothyrotomies and managing airway trauma on the battlefield, with improvements aimed at ultimately reducing mortality rates associ
SBIR Phase II 2015 Department of DefenseDefense Health Agency -
Variable Gravity Two-Phase Heat Sink for Airborne Directed Energy Systems
SBC: MUDAWAR THERMAL SYSTEMS INC Topic: MDA14016The proposed study concerns the development of a robust two-phase cooling module for airborne directed energy systems. There are five overriding objectives for the proposed Phase I study: (1) cooling module design, fabrication and instrumentation; (2) two-phase cooling loop development; (3) thermal tests; (4) theoretical model of cooling performance as a function of velocity and surface orientati ...
SBIR Phase I 2015 Department of DefenseMissile Defense Agency -
Inversion Engine: A Custom Hardware/Software/Algorithmic Solution for Fast MBIR Imaging
SBC: HIGH PERFORMANCE IMAGING LLC Topic: HSB0142003Model-based image reconstruction (MBIR) has been demonstrated to have great potential value in a variety of DHS applications including baggage and cargo CT scanning. However, while MBIR has the potential to reduce artifacts and increase resolution, the computational requirements remain a barrier to its application. High Performance Imaging LLC seeks to create and commercialize the InversionEngin ...
SBIR Phase II 2015 Department of Homeland Security -
Downed Power Line Sensor
SBC: SKY SIGHT TECHNOLOGIES, LLC Topic: HSB0142005The proposed SkySight Technologies Downed Power Line Sensor will detect and alert to the presence of a downed power line and its energized status through a sensor on the power line. In the event of a downed power line, an alert message is sent via wireless network to the utility provider regarding the lines energized status. A concurrent visual onsite indicator flashes to alert first responders an ...
SBIR Phase II 2015 Department of Homeland Security