You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. (ERGONOMIC MICROCLUSTER)

    SBC: Micro-design Inc            Topic: N/A

    INTEGRATION OF COMPACT, HIGH-SPEED MICROPROCESSOR INSTRUMENTATION WITH BOTH VOLUNTARY AND INVOLUNTARY OPERATOR INTERACTIONS TO DETERMINE PERFORMANCE OF MAN AND MACHINE. THE SYSTEM TO BE DESIGNED FOR ON-SITE, IN-FIELD PROGRAMMING TO ACHIEVE THE MAXIMUM MISSION ORIENTED,ERGONOMIC PERFORMANCE. SYSTEM SOFTWARE CAPABLE OF PROVIDING ARTIFICIAL INTELLIGENCE, CAUSAL ACT AND REACT EVALUATION, AND ASSESSMEN ...

    SBIR Phase I 1985 Department of DefenseArmy
  2. DOPPLER CHAFF

    SBC: Pinson Associates Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseArmy
  3. THE PROPOSED RESEARCH WILL INVESTIGATE THE FEASIBILITY OF DEPOSITIONING HARD DIAMOND LIKE CARBON COATINGS ON SURFACES OF OPTICAL ELEMENTS.

    SBC: Polytronix Inc            Topic: N/A

    THE PROPOSED RESEARCH WILL INVESTIGATE THE FEASIBILITY OF DEPOSITIONING HARD DIAMOND LIKE CARBON COATINGS ON SURFACES OF OPTICAL ELEMENTS.IT IS RECOGNIZED THAT THIS PROTECTIVE LAYER DEVELOPED MUST BY CORROSION AND EROSION RESISTANT AND IT MUST BE OPTICALLY TRANSPARENT FROM UV AND IR WAVELENGTHS. FOR REASONS DESCRIBED IN THIS PROPOSAL, THE USE OF A RADIO FREQUENCY (RF) PLASMA DISCHARGE SYSTEM APPEA ...

    SBIR Phase I 1985 Department of DefenseArmy
  4. INVESTIGATION OF KNOWLEDGE ENGINEERING APPLICATION TO SQAM REQUIREMENTS ANALYSIS MEASURES

    SBC: United Dynamics, Inc.            Topic: N/A

    THE GENERATION OF REQUIREMENT ANALYSIS MEASURES CAN BE ACCOMPLISHED BY THE "EXPERT SYSTEM" APPROACH. IF A COMPUTER PROGRAM IS DEVELOPED WHERE THE INPUTS OF AN EXPERIENCED EVALUATION ENGINEER CAN BE STORED A SET OF LOGICAL QUESTIONS DEFINED AND A METHOD FOR ITS PROGRESSION (INFERENCE ENGINE) THEN A POWERFUL STANDARDIZED SOFTWARE QUALITY TOOL WILL BE AVAILABLE. THE NATURAL APPLICATION OF A PRACTICAL ...

    SBIR Phase II 1985 Department of DefenseArmy
US Flag An Official Website of the United States Government