You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
3-D VIEWING SYSTEM ENHANCEMENTS FOR THE CONTROL OF ROBOTIC VEHICLES
SBC: Automation Technology Corp. Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseArmy -
LIGHTWEIGHT CEMENTITIOUS ARMAMENT SYSTEMS
SBC: Cemcom Research Associates Inc Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseArmy -
STEAM GENERATOR WITH HEAT PIPE HEAT EXCHANGER
SBC: DYNATHERM CORP. Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseArmy -
UV-ENHANCED OMPVE PROCESS FOR LOW TEMPERATURE HGCDTE EPITAXY
SBC: Fusion Systems Corp. Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseArmy -
PARTITION ING CONCEPTUAL DESIGN
SBC: Gms Engineering Corp. Topic: N/APROPOSED IS THE CONCEPTUAL DESIGN OF A SYSTEM FOR ACQUIRING AND ANALYZING PHYSIOLOGICAL AND OVERT BEHAVIORAL DATA FROM OPERATORS (OF COMPLEX MAN MACHINE SYSTEMS) SO AS TO IDENTIFY OPERATOR FUNCTIONAL STATUS AND THEREBY ALLOCATE CONTROL FUNCTIONS BETWEEN THE MAN AND THE MACHINE.
SBIR Phase I 1985 Department of DefenseArmy -
REAL-TIME STERO-MICRORADIOGRAPHY
SBC: Industrial Quality, Inc. Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseArmy -
THIN BUFFER SINGLE MODE FIBER FOR LONG RANGE FIBER OPTICS GUIDANCE TRANSMISSION
SBC: OPTELECOM, INC. Topic: N/ASEVERAL FACTORS CAN DISTURB THE PERFECTION OF A WINDING AND LIMIT THE LENGTH WHICH CAN WOUND SUCCESSFULLY. THESE FACTORS INCLUDE TEMPERATURE CYCLING OF WOUND SPOOLS, IMPERFECTIONS OR VARIABILITY OF FIBER DIAMETER, SPOOL CONTOUR IRREGULARITIES, AND CROSSOVER LINES NOT FOLLOWING A REGULAR PATTERN LAYER AFTER LAYER. THIS PROPOSAL OFFERS DEVELOPMENT WORK LEADING TO A BETTER UNDERSTANDING OF WINDING EF ...
SBIR Phase II 1985 Department of DefenseArmy -
DISTRIBUTED COMMAND AND CONTROL APPLICATIONS- CECOM/CENCOMS
SBC: SYSTEMS ENGINEERING INC Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseArmy -
MULTI-PARAMETER METHODOLOGY AND PROGRAM DESIGN FOR MAINTENANCE
SBC: Xebec Corp Topic: N/ACOMPLICATED AND EXPENSIVE ELECTRIC GENERATING AND ENERGY-USING EQUIPMENT MUST OPERATE OVER LONG PERIODS OF TIME WITH MINIMUM OPERATOR ATTENTION. THE NEED FOR HIGHER EFFICIENCY FOR OPERATIONS IN HOSTILE ENVIRONMENTS MAY BE COMPLICATING FACTORS. THE RESULT IS THAT "SINGLE POINT" MEASUREMENTS WHICH REQUIRE OPERATOR INTERPRETATION AND SYN- THESIS ARE OFTEN INADEQUATE SOURCES OF FAILURE TREND MAINTENAN ...
SBIR Phase II 1985 Department of DefenseArmy