You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. INTELLIGENT INPUT/OUTPUT SUBSYSTEM FOR CAMAC AND FASTBUS

    SBC: Aeon Systems Inc.            Topic: N/A

    A MODULAR INPUT/OUTPUT SUBSYSTEM IS PROPOSED TO PROVIDE INTERFACE BETWEEN EXPERIMENTAL DATA ACQUISITION SYSTEMS USING THE CAMAC OR FASTBUS STANDARDS AND NEW-GENERATION DIGITAL EQUIPMENT CORPORATION MINICOMPUTERS. THE SYSTEM OFFERS A POTENTIAL TENFOLD INCREASE IN THE SPEED OF DATA ACQUISITION OVER CURRENT SYSTEMS. IT INCLUDES SUFFICIENT COMPUTER INTELLIGENCE TO MANAGE DATA TRANSFERS BETWEEN THE EXP ...

    SBIR Phase II 1987 National Science Foundation
  2. STANDOFF MINE DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
  3. GENERIC ARTIFICIAL INTELLIGENCE EXPERT SYSTEM FOR SPACE STATION APPLICATIONS

    SBC: Applications Resources Inc            Topic: N/A

    THE GENERIC ARTIFICIAL INTELLIGENCE EXPERT SYSTEM FOR SPACE-STATION APPLICATIONS WILL BE USER-FRIENDLY AND WILL UTILIZE A HIERARCHY OF FRAMES FOR DATA INPUT, AUTOMATIC FAULT DIAGNOSIS AND ANALYSIS AND REPAIR FUNCTIONS. IT WILL PROVIDE PROMPT DIAGNOSIS AND SUGGESTIONS FOR SYSTEM REPAIR. IT WILL PROVIDE AS MUCH AUTOMATION AS POSSIBLE FOR REPAIR FUNCTIONS. THE DESIGN WILL BE APPROPRIATE FOR INTERFACI ...

    SBIR Phase I 1987 National Aeronautics and Space Administration
  4. VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY

    SBC: Applied Physics Technologies            Topic: N/A

    CONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...

    SBIR Phase I 1987 Department of DefenseArmy
  5. EMP ENVIRONMENT PREDICTION FOR COLLIMATED SOURCES

    SBC: Applied Physics Technologies            Topic: N/A

    CODES CURRENTLY EXIST THAT WILL CALCULATE THE ELECTROMAGNETIC ENVIRONMENT (EMP) PRODUCED BY A BEAM OF COLLIMATED GAMMA RAYS. THE COLLIMATION MAY BE EITHER CYLINDRICAL OR CONICAL. THE CURRENT EFFORT WILL BE TO INSTALL THE CODES ON AN ARMY CRAY COMPUTER AND TO SET THEM UP AND RUN THEM FOR PROBLEMS OF INTEREST TO THE ARMY.

    SBIR Phase I 1987 Department of DefenseArmy
  6. BIAXIAL INTERFACE STRESS TRANSDUCER FOR HIGH OVERPRESSURES- DEVELOPMENT

    SBC: Applied Research Associates, Inc.            Topic: N/A

    DEFINITION OF THE STRUCTURE-MEDIA INTERACTION (SMI) LOADS ON A BURIED STRUCTURE IS ONE OF THE LARGEST SOURCES OF UNCERTAINTY IN ANALYZING THE SURVIVABILITY OF STRATEGIC STRUCTURES. ADVANCEMENT OF THE STATEOF-THE-ART IN THE MODELING OF SMI BEHAVIOR IS HAMPERED BY A LIMITED DATA BASE WHICH IS CONFINED TO OVERPRESSURES MUCH SMALLER THAN THOSE CURRENTLY OF INTEREST. THIS EFFORT PROPOSES TO DEVELOP AND ...

    SBIR Phase II 1987 Department of DefenseDefense Threat Reduction Agency
  7. DEVELOPMENT OF A HIGH RANGE PARTICLE VELOCITY GAGE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase I 1987 Department of DefenseArmy
  8. GRAVITY EFFECTS ON SMALL-SCALE STRUCTURAL MODELING

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THE PROPOSED EFFORT IS TO DEVELOP MATERIALS AND PROCEDURES TO APPLY REECH-FROUDE SCALING TO SUB-SCALE MODEL TESTS OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO CONVENTIONAL (NON-NUCLEAR) WEAPON EFFECTS.

    SBIR Phase I 1987 Department of DefenseAir Force
  9. PHASED ARRAY IMAGING IN PARTIALLY COHERENT LIGHT

    SBC: A-TECH CORPORATION            Topic: N/A

    THE COMBINED REQUIREMENTS FOR HIGH SPATIAL RESOLUTION AND HIGH SIGNAL-TO-NOISE RATIO HAVE LED MANY RECENT TRACKING SYSTEMS ANALYSTS TO CONSIDERACTIVE TRACKERS IMPLEMENTED WITH PHASED ARRAY OPTICS. THE PHASED ARRAY OVERCOMES THE TECHNOLOGY LIMITS ON APERTURE SIZE WHILE THE LASER SOURCES PROVIDE A DETECTABLE TARGET RETURN. THE PHASED ARRAY IMAGER HAS BEEN MODELLED FOR BOTH NON-COHERENT AND FULLY COH ...

    SBIR Phase II 1987 Department of DefenseAir Force
  10. DEVELOPMENT OF ANGULAR ACCELEROMETER

    SBC: A-TECH CORPORATION            Topic: N/A

    A RESEARCH EFFORT COMPLETED RECENTLY FOR THE AIR FORCE IDENTIFIED NEW TECHNOLOGIES FOR ANGULAR MOTION MEASUREMENT. TWO CONCEPTS WERE FOUND WHICH APPEAR TO OFFER POTENTIAL FOR AN EXCELLENT COMBINATION OF SMALL SIZE, WIDE DYNAMIC RANGE, WIDE BANDWIDTH AND EASE OF FABRICATION AND UTILIZATION. ONE DEVICE, CALLED A FLUID-FILLED BENDER BEAM, USES PIEZOCERAMICELEMENTS TO PRODUCE A SIGNAL PROPORTIONAL TO ...

    SBIR Phase II 1987 Department of Transportation
US Flag An Official Website of the United States Government