You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SENSITIVITY

    SBC: 3c Systems, Inc.            Topic: N/A

    THE OBJECTIVES OF PHASE 1 ARE TO ACQUIRE AND ASSEMBLE DATA ON MUNITION SENSITIVITY TO DYNAMIC INPUTS, DEVELOP DISCRETE ELEMENT CODES FOR LOADING AND REACTION OF EXPLOSIVES AND MUNITIONS, EVALUATE THE PREDICTIVE UTILITY OF THESE CODES TO PREDICT REACTION THRESHOLDS OF MUNITIONS, AND TO PLAN THE PHASE 2 PROGRAM OF TESTING AND COMPUTER MODEL IMPROVEMENT. THE GENERAL APPROACH IN PHASE 1 IS TO EVALUATE ...

    SBIR Phase I 1986 Department of DefenseNavy
  2. SYMPATHETIC DETONATION

    SBC: 3c Systems, Inc.            Topic: N/A

    THE OBJECTIVES OF PHASE 1 ARE TO ACQUIRE AND ASSEMBLE DATA ON MUNITION SENSITIVITY TO SYMPATHETIC DETONATION, DEVELOP DISCRETE ELEMENT CODES FOR LOADING AND REACTION OF EXPLOSIVES, EVALUATE THE PREDICTIVE UTILITY OF THESE CODES TO PREDICT SYMPATHETIC DETONATION OF MUNITIONS, AND TO PLAN THE PHASE 2 PROGRAM OF TESTING AND COMPUTER MODEL IMPROVEMENT. THE GENERAL APPROACH TO PHASE 1 IS TO EVALUATE TH ...

    SBIR Phase I 1986 Department of DefenseNavy
  3. DIRECT GROWTH/FUSION CIRCUITRY DEVICES ON OPTICAL FIBER

    SBC: Advanced Fiberoptics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  4. AN ACTIVE ELECTROCHEMICAL INSTURMENT SYSTEM FOR DETERMIN INATION OF WATER STRESS

    SBC: Agricultural Electronics Corporation            Topic: N/A

    AN ELECTROCHEMICAL INSTRUMENTATION SYSTEM WILL BE DESIGNED AND CONSTRUCTED TO DETERMINE ON COMMAND PLANT WATER STATUS BY MEANS OF CYCLIC VOLTAMMETRY AND/OR COULOSTATICS. THE APPROACH IS BASED ON THE CHANGE IN ELECTROCHEMICAL STATUS OF THE APOPLAST ELECTROLYTE DURING THE NORMAL IRRIGATION CYCLE. A THREE WINDOW MICROPROBE WILL BE FABRICATED ON A SILICON WAFER SUBSTRATE USING THE PLANAR TECHNIQUES CO ...

    SBIR Phase II 1986 Department of Agriculture
  5. DEVICE

    SBC: Albers Research & Dev. Assocs            Topic: N/A

    THE EFFECT OF THREE IMPORTANT PROCESS VARIABLES (ALTERING HEATING OF FEED LIQUID, CHAMBER LENGTH, AND CARRIER GAS TEMPERATURE) ON ENERGY NEEDED TO PRODUCE POTABLE WATER FROM WATERS CONTAINING DISSOLVED SOLIDS BY AN INNOVATIONAL MINIM UM ENERGY USING HEAT AND MASS TRANSFER DEVICE WILL BE INVESTIGATED. THIS DEVICE USES AN INERT CARRIER GAS OPERATING AT NEAR ATMOSPHERIC PRESSURE TO EVAPORATE WATER AN ...

    SBIR Phase I 1986 Department of Agriculture
  6. ABRASION RESISTANT NON-FLAMMABLE OXIDIZED POLYACRYLONITRILE FABRICS

    SBC: American Hyperform, Inc            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  7. A PREDICTION MODEL FOR ADVANCED LEADING-EDGE VORTEX FLOW CONTROL

    SBC: TARGAZYME, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  8. COST PRODUCTION TECHNIQUE FOR SOFTWARE

    SBC: AMERIGENICS, INC.            Topic: N/A

    BY IDENTIFYING THE HEURISTICS USED BY EXPERT ESTIMATORS TO DRAW ANALOGIES AND MAKE INFERENCES FROM HISTORICAL DATA AND KNOWLEDGE OF THE DEVELOPMENT PROCESS, AND BY IDENTIFYING AND, TO THE EXTENT POSSIBLE, QUANTIFYING THOSE CRITICAL PARAMETERS THAT DRIVE SOFTWARE, AN "EXPERT SOFTWARE COST ESTIMATING ASSISTANT" WILL BE PRODUCED. IT WILLBE BASED ON INNOVATIVE ARTIFICIAL INTELLIGENCE (AI) AND KNOWLEDG ...

    SBIR Phase II 1986 Department of DefenseNavy
  9. AN ARTIFICIAL INTELLIGENT JOB PERFORMANCE AID (AIJPA) FOR ON-BOARD AUDIO TROUBLESHOOTING

    SBC: AMERIGENICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  10. STRESS WAVE ANALYSIS OF WOOD PILES RELATED TO ULTIMATE COMPRESSIVE STRENGTH

    SBC: Anasys Instruments Corp.            Topic: N/A

    WOOD FOUNDATION PILING COULD BE UTILIZED FOR CAPACITIES OF 2 TO 3 CURRENT DESIGN LOADS IF THE HIGH STRENGTH PILES COULDBE READILY IDENTIFIED BY A NON-DESTRUCTIVE TEST METHOD. WOODPILES WOULD BE APPRECIATED BY GEO-TECHNICAL AND STRUCTURAL ENGINEERS AS AN ECONOMICAL AND RELIABLE DEEP FOUNDATION CAPABLE OF HIGHER DESIGN STRESSES IF THE LOW-STRENGTH PILES WERE REJECTED. A FEASIBILITY STUDY WILL DETERM ...

    SBIR Phase II 1986 Department of Agriculture
US Flag An Official Website of the United States Government