You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Multi-Object Payload Deployment

    SBC: SEACORP, LLC            Topic: MDA15018

    Technological advances have facilitated weapons systems capable of simultaneously supporting multiple missions leading to cost efficiencies and greater operational flexibility.Future systems capable of deploying multiple payloads from a single missile will enable various targets to be attacked with a single launch allowing more efficient use of limited and valuable resources.For such a system to w ...

    SBIR Phase I 2016 Department of DefenseMissile Defense Agency
  2. Global Surveillance Augmentation Using Commercial Satellite Imaging Systems

    SBC: VISION SYSTEMS INC            Topic: AF153001

    ABSTRACT:A system is proposed to access, collate and process imagery from multiple small satellite constellations. The imagery is fused and registered to a common reference so that exploitation algorithms, such as change detection and event monitoring, are reported with accurate geographic coordinates. The system, called SatTel, is implemented as open source software that is designed to run on the ...

    SBIR Phase II 2016 Department of DefenseAir Force
  3. 3D Acoustic Model for Geometrically Constrained Environments

    SBC: HIGH REZ CONSULTING, INC.            Topic: N16AT018

    Geometrically constrained underwater environments abrogate the simplifying acoustic modeling assumption that energy can be modeled in a two-dimensional vertical plane. In these environments, current tools to perform navigation and passive and/or active sonar mission planning are inadequate. Furthermore, channel complexity makes it difficult to model acoustic communications. HRC proposes to upgrade ...

    STTR Phase I 2016 Department of DefenseNavy
  4. Seamless Flexible Fuel Tanks- 65% TOC Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...

    SBIR Phase II 2016 Department of DefenseDefense Logistics Agency
  5. Imaging Instrumentation System

    SBC: DBV TECHNOLOGY, LLC            Topic: N08199

    There are two main objectives of the follow-on Phase II for Small Business Innovation Research Topic N08-199.First is to deliver a portable Splash Impact Measurement System (SIMS) with capablility of mapping the debris field surrounding an engagement event in broad ocean areas.This mapping will provide the precise location and time of all objects impacting the sea surface.The second objective is t ...

    SBIR Phase II 2016 Department of DefenseMissile Defense Agency
  6. Shallow Water Communications for Mine Warfare

    SBC: Btech Acoustics, LLC            Topic: N161027

    A system to covertly communicate in underwater acoustic shallow water environment for mine countermeasure is described. Techniques for LPD and directional communication are suggested.

    SBIR Phase I 2016 Department of DefenseNavy
  7. Reduced Cost Fabrication of Optical Sapphire Hyper-hemispheres for Submarine Masts

    SBC: ADOLF MELLER COMPANY            Topic: N161036

    The objective of the proposal is to reduce the cost of fabrication of sapphire optical hyper-hemispheres for submarine masts. Due to the nature of sapphire, deriving complex geometries from grown boules using current conventional fabrication techniques is one of the major contributors to cost. Removing excess material requires long diamond grinding cycles. New advances in ultrasonics have been inc ...

    SBIR Phase I 2016 Department of DefenseNavy
  8. Low Probability of Detection Acoustic Communication

    SBC: Btech Acoustics, LLC            Topic: N161068

    This proposal considers technologies and methods to realize low probability of detection (LPD) acoustic modem systems using low SNR techniques, camouflage techniques, and directionality to enhance covertness. Phase I baseline designs will be recommended based on past and new work of the contractor

    SBIR Phase I 2016 Department of DefenseNavy
  9. Innovative Velocity Sensors

    SBC: Btech Acoustics, LLC            Topic: N141026

    This project involves the development of hull mounted acoustic motion (accelerometer) sensor with increased sensitivity (+6dB), greater stability, and low cost for hull mounted sonar arrays. Investigations and developments of sensors without and with preamplifiers is considered.

    SBIR Phase II 2016 Department of DefenseNavy
  10. Next Generation Electronic Warfare Human Machine Interface (HMI) for Submarines

    SBC: SEACORP, LLC            Topic: N151036

    During Phase I, HMI concepts were developed to facilitate work load sharing, collaboration, and interoperability of tools and displays. Attention was given to simplicity and efficiency to reduce the number of menus and button clicks, eliminate windows, and simplify controls to be more intuitive.In Phase II the conceptual displays will be developed into a fully functioning prototype and integrated ...

    SBIR Phase II 2016 Department of DefenseNavy
US Flag An Official Website of the United States Government