You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
CAD STATION RM ON-LINE SUPPORT SYSTEM
SBC: Aquidneck Management Associate Topic: N/ATHIS PROJECT OUTLINES A RELIABILITY AND MAINTAINABILITY KNOWLEDGE BASE AND THE HYPERTEXT INTERFACE REQUIRED TO TRANSPORT THIS DATA INTO COMPUTER-AIDED DESIGN (CAD) ENVIRONMENTS. THE PRIMARY FOCUS OF THE PROPOSAL IS THE DEVELOPMENT OF THE FOUNDATION FOR AN ENGINEERING RELIABILITY AND MAINTAINABILITY INFORMATION PRESENTATION SYSTEM TO SUPPORT ELECTRONIC CIRCUIT AND SYSTEMS DESIGN ENGINEERS IN A CAD ...
SBIR Phase I 1991 Department of DefenseAir Force -
SIMULTANEOUS ENGINEERING AUTOMATION
SBC: Aquidneck Management Associate Topic: N/AA NEW GENERATION OF ENGINEERING AND MANUFACTURING AUTOMATION DESIGNTOOLS ARE NOW EMERGING AS A RESULT OF THE PIONEERING WORK THAT HAS BEEN DONE IN OBJECTORIENTED PROGRAMMING TECHNOLOGY. UNLIKE CONVENTIONAL PROCEDURAL LANGUAGE APPROACHES, THE OBJECT-ORIENTED PROGRAMMING APPROACH ALLOWS DATA STRUCTURES AND PROCEDURES TO BE DEFINED FOR GENERIC CLASSES OF OBJECTS. SYSTEM PERFORMANCE, RNA, AND COST DAT ...
SBIR Phase I 1991 Department of DefenseNavy -
SUBMARINE COMBAT SYSTEM OPERATOR TRAINING WORKSTATION CONCEPTS
SBC: Business And Engineering Tech Topic: N/ATHIS TASK WILL IDENTIFY THE ISSUES CONCERNING COMBAT SYSTEM TRAINING REQUIREMENTS. IN ADDITION TO FUNCTIONAL NEEDS, THE ISSUES OF EASE OF SYSTEM UPGRADES AND RAPID PROTOTYPING WILL BE ADDRESSED. INITIAL INPUT DATA WILL BE OBTAINED FROM NAVAL TRAINING PLANS, AND EXISTING TRAINING DEVICE CAPABILITIES. THIS WILL IDENTIFY THE LEVELS OF REQUIRED TRAINING AND THE SKILLS THAT MUST BE TAUGHT. A WORKSTATIO ...
SBIR Phase I 1991 Department of DefenseNavy -
OPTIMAL ISLET MATRIX FOR IMMUNOISOLATED TRANSPLANTS
SBC: Cytotherapeutics, Inc. Topic: N/ATHE LONG TERM OBJECTIVE OF THIS RESEARCH IS THE DEVELOPMENT AND INTRODUCTION INTO CLINICAL PRACTICE OF AN EFFECTIVE, AND BIOCOMPATIBLE IMPLANTABLE-HYBRID- ARTIFICIAL-PANCREAS WHICH IS CAPABLE OF SIGNIFICANT IMPROVEMENT IN THERAPY OF INSULIN DEPENDENT DIABETES. THE SPECIFIC AIM OF THIS PROJECT IS TO INVESTIGATE METHODS OF IMPROVING THE VIABILITY AND FUNCTION OF MACRO-ENCAPSULATED ISLETS. DEVELOPMEN ...
SBIR Phase I 1991 Department of Health and Human Services -
SUBMARINE COMBAT SYSTEM ARCHITECTURE WITH WORKSTATIONS
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ACURRENT SUBMARINE COMBAT SYSTEM ARCHITECTURES REFLECT A WEAK LINKAGE FROM OPERATIONAL REQUIREMENTS TO IMPLEMENTATION. ARCHITECTURES RANGE FROM THOSE WITH LARGE CENTRAL COMPUTERS TO THOSE WITH CLUSTERED DISTRIBUTED PROCESSORS. SINGLE POINTS OF FAILURE, DATA BOTTLENECKS, AND PROCESSOR CONFLICTS RESULT FROM ARCHITECTURES THAT DO NOT HAVE OPERATIONAL REQUIREMENTS AS THEIR BASIS. THE EFFORT PROPOSED US ...
SBIR Phase I 1991 Department of DefenseNavy -
COMBINED MODELS FOR COMBAT SYSTEM ASSESSMENT
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ATACTICAL PERFORMANCE, RELIABILITY, AND COST ARE COMPLIMENTARY FACTORS IN SYSTEM DESIGN BUT THERE IS NO ONE TOOL TO EFFECTIVELY COMPARE ATTRIBUTES IN THESE DISPARATE DISCIPLINES. THERE ARE COMPUTER PROGRAMS TO ESTIMATE SYSTEM PERFORMANCE AGAINST THE THREAT, COMPUTER MODELS TO PREDICT RELIABILITY IN A GIVEN ENVIRONMENT, AND COST MODELS TO ESTIMATE BOTH ACQUISITION AND OPERATIONS OVER TH6 LIFE OF A S ...
SBIR Phase I 1991 Department of DefenseNavy -
HF POWER SUPPLY FOR SUBMARINE COMBAT SYSTEMS
SBC: DEEGAN RESEARCH GROUP, INC. Topic: N/ARELIABLE AND CONTINUOUS POWER TO SUBMARINE ELECTRONICS IS ESSENTIALFOR MISSION EXECUTION AND FOR THE SAFE OPERATION OF THE SHIP. DIGITAL ELECTRONICS CANNOT CONTINUE OPERATION THROUGH EVEN VERY SHORT POWER OUTAGES CAUSE BY BUS TRANSFER DEVICES, THAT HAVE HISTORICALLY BEEN SUFFICIENT FOR ANALOG COMBAT SYSTEMS. THE RESTART AND RELOAD THAT A DIGITAL SYSTEM MUST EXECUTE AFTER A SHORT POWER INTERRUPTION ...
SBIR Phase I 1991 Department of DefenseNavy -
CPR FOR FAMILIES\VIDEOTAPE DEVELOPMENT
SBC: Institute For Behavioral Medic Topic: N/AN/A
SBIR Phase I 1991 Department of Health and Human Services -
AUTOMATIC CALIBRATION ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR SYSTEM
SBC: KVH INDUSTRIES, INC. Topic: N/AKVH INDUSTRIES PROPOSES TO DEVELOP A TOP LEVEL DESIGN FOR AN ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR, WITH AN AUTOMATIC CALIBRATION CAPABILITY. THE PROPOSED ELECTROMAGNETIC SENSOR WILL CONNECT TO AN INTERFACE BOX COMPATIBLE WITH MIL-STD 1553 REQUIREMENTS.IT WILL FUNCTIONALLY AND PHYSICALLY REPLACE THE MAGNETIC SENSORS ON THE U.S. NAVY'S MA-1, S/AHRS, EXISTING AIR FORCE SYSTEMS AND THE PROPOSED C/ ...
SBIR Phase II 1991 Department of DefenseNavy -
MATHEMATICAL METHODS FOR EMISSION COMPUTED TOMOGRAPHY
SBC: Mathematical Technologies, Inc Topic: N/ATHE ABILITY TO MEASURE METABOLIC ACTIVITY, AS WELL AS THE ABILITY TO DISCRIMINATE AMONG DIFFERENT TISSUE TYPES, MAKE SPECT A POTENTIALLY POWERFUL MEDICAL IMAGING TOOL. HOWEVER,THE LOW RESOLUTION AND POOR IMAGE QUALITY THAT CHARACTERIZE SPECT IMAGES LIMIT THE CLINICAL USEFULNESS OF SPECT. MATHEMATICAL TECHNOLOGIES INC. BELIEVES THAT MATHEMATICAL METHODS ARE AVAILABLE WHICH WILL SIGNIFICANTLY IMPROV ...
SBIR Phase I 1991 National Science Foundation