You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SIMULTANEOUS ENGINEERING AUTOMATION

    SBC: Aquidneck Management Associate            Topic: N/A

    A NEW GENERATION OF ENGINEERING AND MANUFACTURING AUTOMATION DESIGNTOOLS ARE NOW EMERGING AS A RESULT OF THE PIONEERING WORK THAT HAS BEEN DONE IN OBJECTORIENTED PROGRAMMING TECHNOLOGY. UNLIKE CONVENTIONAL PROCEDURAL LANGUAGE APPROACHES, THE OBJECT-ORIENTED PROGRAMMING APPROACH ALLOWS DATA STRUCTURES AND PROCEDURES TO BE DEFINED FOR GENERIC CLASSES OF OBJECTS. SYSTEM PERFORMANCE, RNA, AND COST DAT ...

    SBIR Phase I 1991 Department of DefenseNavy
  2. SUBMARINE COMBAT SYSTEM OPERATOR TRAINING WORKSTATION CONCEPTS

    SBC: Business And Engineering Tech            Topic: N/A

    THIS TASK WILL IDENTIFY THE ISSUES CONCERNING COMBAT SYSTEM TRAINING REQUIREMENTS. IN ADDITION TO FUNCTIONAL NEEDS, THE ISSUES OF EASE OF SYSTEM UPGRADES AND RAPID PROTOTYPING WILL BE ADDRESSED. INITIAL INPUT DATA WILL BE OBTAINED FROM NAVAL TRAINING PLANS, AND EXISTING TRAINING DEVICE CAPABILITIES. THIS WILL IDENTIFY THE LEVELS OF REQUIRED TRAINING AND THE SKILLS THAT MUST BE TAUGHT. A WORKSTATIO ...

    SBIR Phase I 1991 Department of DefenseNavy
  3. SUBMARINE COMBAT SYSTEM ARCHITECTURE WITH WORKSTATIONS

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    CURRENT SUBMARINE COMBAT SYSTEM ARCHITECTURES REFLECT A WEAK LINKAGE FROM OPERATIONAL REQUIREMENTS TO IMPLEMENTATION. ARCHITECTURES RANGE FROM THOSE WITH LARGE CENTRAL COMPUTERS TO THOSE WITH CLUSTERED DISTRIBUTED PROCESSORS. SINGLE POINTS OF FAILURE, DATA BOTTLENECKS, AND PROCESSOR CONFLICTS RESULT FROM ARCHITECTURES THAT DO NOT HAVE OPERATIONAL REQUIREMENTS AS THEIR BASIS. THE EFFORT PROPOSED US ...

    SBIR Phase I 1991 Department of DefenseNavy
  4. COMBINED MODELS FOR COMBAT SYSTEM ASSESSMENT

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    TACTICAL PERFORMANCE, RELIABILITY, AND COST ARE COMPLIMENTARY FACTORS IN SYSTEM DESIGN BUT THERE IS NO ONE TOOL TO EFFECTIVELY COMPARE ATTRIBUTES IN THESE DISPARATE DISCIPLINES. THERE ARE COMPUTER PROGRAMS TO ESTIMATE SYSTEM PERFORMANCE AGAINST THE THREAT, COMPUTER MODELS TO PREDICT RELIABILITY IN A GIVEN ENVIRONMENT, AND COST MODELS TO ESTIMATE BOTH ACQUISITION AND OPERATIONS OVER TH6 LIFE OF A S ...

    SBIR Phase I 1991 Department of DefenseNavy
  5. HF POWER SUPPLY FOR SUBMARINE COMBAT SYSTEMS

    SBC: DEEGAN RESEARCH GROUP, INC.            Topic: N/A

    RELIABLE AND CONTINUOUS POWER TO SUBMARINE ELECTRONICS IS ESSENTIALFOR MISSION EXECUTION AND FOR THE SAFE OPERATION OF THE SHIP. DIGITAL ELECTRONICS CANNOT CONTINUE OPERATION THROUGH EVEN VERY SHORT POWER OUTAGES CAUSE BY BUS TRANSFER DEVICES, THAT HAVE HISTORICALLY BEEN SUFFICIENT FOR ANALOG COMBAT SYSTEMS. THE RESTART AND RELOAD THAT A DIGITAL SYSTEM MUST EXECUTE AFTER A SHORT POWER INTERRUPTION ...

    SBIR Phase I 1991 Department of DefenseNavy
  6. AUTOMATIC CALIBRATION ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR SYSTEM

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    KVH INDUSTRIES PROPOSES TO DEVELOP A TOP LEVEL DESIGN FOR AN ELECTROMAGNETIC FLUXGATE AIRCRAFT SENSOR, WITH AN AUTOMATIC CALIBRATION CAPABILITY. THE PROPOSED ELECTROMAGNETIC SENSOR WILL CONNECT TO AN INTERFACE BOX COMPATIBLE WITH MIL-STD 1553 REQUIREMENTS.IT WILL FUNCTIONALLY AND PHYSICALLY REPLACE THE MAGNETIC SENSORS ON THE U.S. NAVY'S MA-1, S/AHRS, EXISTING AIR FORCE SYSTEMS AND THE PROPOSED C/ ...

    SBIR Phase II 1991 Department of DefenseNavy
  7. TIARA- AN ADVANCED TARGETING ALGORITHM USING INTER-ARRAY RANGING

    SBC: SEACORP, LLC            Topic: N/A

    THE NEED EXISTS FOR NEW ALGORITHMS AND METHODOLGIES FOR TRACKING AND/OR TARGETING LONG-RANGE PASSIVE CONTACTS SINCE CURRENT METHODS HAVE INHERENT LIMITATIONS. THE TREND TOWARD QUIETER, MORE ELUSIVE LONG-RANGE PASSIVE CONTACTS ALSO REQUIRES NEW APPROACHES TO LONG RANGE DETECTION AND TMA. THE APPROACH TO BE EXAMINED UNDER THIS PROJECT WOULD BE AN ACOUSTIC TRANSIENT INTER-ARRAY RANGING TECHNIQUE (TIA ...

    SBIR Phase I 1991 Department of DefenseNavy
  8. ASW SEARCH PLANNING

    SBC: PROMETHEUS INC.            Topic: N/A

    CURRENT CAPABILITIES TO UTILIZE ASW SYSTEMS AND FORMULATE SEARCH PLANS ARE LIMITED BY THE ABILITY TO PROCESS REAL-TIME TACTICAL DATA. AN AUTOMATED SYSTEM, EXPLORING STATE-OF-THE-ART DEVELOPMENTS IN NEURAL NETWORK AND PARALLEL PROCESSING TECHNOLOGY, WOULD ENHANCE THE ABILITY TO PROCESS INFORMATION IN A TIMELY MANNER, AND WOULD THUS RESULT IN AN ABILITY TO OPTIMIZE SYSTEM LINE-UP. WE PROPOSE TO PROV ...

    SBIR Phase I 1991 Department of DefenseNavy
  9. COMBINED COMBAT SYSTEM MODELS

    SBC: PROMETHEUS INC.            Topic: N/A

    AMONG THE NUMEROUS MODELS USED TODAY TO MEASURE RELIABILITY, MAINTAINABILITY, AVAILABILITY (RMA), PERFORMANCE, AND COST EFFECTIVENESS FOR COMPLEX ELECTRONIC SYSTEMS, SEVERAL ARE OF PARTICULAR IMPORTANCE TOTHE NAVY. THE PRINCIPAL FOCUS OF OUR PHASE I EFFORT WILL BE TO EVALUATE THESE MODELS, DETERMINE THE FEASIBILITY OF MODIFYING THEM TO HAVESYSTEM PERFORMANCE REFLECT RMA AND LIFE-CYCLE COST CONSIDE ...

    SBIR Phase I 1991 Department of DefenseNavy
US Flag An Official Website of the United States Government