You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Multimodal Acoustic Tool for Inline Pipe Inspection
SBC: CREARE LLC Topic: 180PH1A Multimodal Acoustic Tool for Inline Pipe Inspection 3/19/2018 The US energy transport pipeline system is a longstanding distribution network with most of its still standing pipes being installed between the 1950s–1970s. Due to degradation mechanisms, such as embrittlement, capable of causing a two-fold reduction in fracture toughness, pipe rupture is a major risk. Current nondestructive ins ...
SBIR Phase I 2018 Department of Transportation -
Rapid Assessment of Air Void System in Fresh Concrete
SBC: CREARE LLC Topic: 171FH2Proposal title: Rapid Assessment of Air Void System in Fresh Concrete Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume ...
SBIR Phase II 2018 Department of Transportation -
Broken Rail Detection from Flashing Rear End Device
SBC: CREARE LLC Topic: 171FR2Proposal title: Broken Rail Detection from Flashing Rear End Device Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortu ...
SBIR Phase II 2018 Department of Transportation -
Resilient Wayside Structures to Reduce Severity of Passenger Equipment Collisions and Derailments
SBC: PROTECTION ENGINEERING CONSULTANTS LLC Topic: 171FR3Proposal title: Resilient Wayside Structures to Reduce Severity of Passenger Equipment Collisions and Derailments Additional passenger fatalities/injuries can occur during derailments involving interaction with wayside structures. Analogously, automobile fatalities often result from interaction of vehicles with roadside structures; personnel hazard reduction is a key design criterion for roadsid ...
SBIR Phase II 2018 Department of Transportation -
Biodegradable Lubricants from Renewable Feedstocks
SBC: TETRAMER TECHNOLOGIES LLC Topic: 88Current agriculture and off-road equipment requires the use of lubricants to ensure efficient operation of integral hydraulic and gear driven systems. The lubricants, either oils or greases, aid in reducing friction, dissipating heat, prevent oxidation, and seal of water and debris from vital areas of the equipment. During operation, equipment may have slight leaks or suffer catastrophic failures ...
SBIR Phase I 2018 Department of Agriculture -
Production of Refined Cane Sugar from Sugar Mills without an Attached Refinery
SBC: CHOU, CHI Topic: 85The one-step cane sugar process respondsto the USDA NIFA SBIR Program Priorities in regards to agriculturally related manufacturing technology and energy efficiency. The technology developed from this project will (1) reduce the energy and water consumed per cane sugar product, (2) provide an economic alternative for producing U.S. Food Grade sugar worldwide, (3) eliminate hazardous solid waste pr ...
SBIR Phase I 2018 Department of Agriculture -
Mill Development Model Development and Testing
SBC: Innovative Natural Resource Solutions, LLC Topic: 86INRS and MDP will collaborate to build an analytical model that demonstrates the probability of success - and opportunities for enhancement - for the redevelopment of idled industrial assets. This model will be developed and refined using the former pulp and paper mill in Old Town, ME., and data supplied by multiple redevelopment efforts elsewhere in the State of Maine. Based upon learnings and ex ...
SBIR Phase I 2018 Department of Agriculture -
An Improved Sanitizer For Grade A Shell Eggs
SBC: Biomedical Development Corporation Topic: N/AThe incidence of food borne outbreaks associated with Salmonella has risen steadily since the mid1970's. The monetary cost of salmonellosis has been estimated at $4 billion annually. The primarycause of salmonellosis has been linked to the consumption of eggs or egg products containingSalmonella enteritidis and 80% of all eggs consumed in the United States are transported to thepurchaser in the ...
SBIR Phase I 1997 Department of Agriculture -
Using Information System Technology to Support Educational
SBC: Center for Resource Management Topic: N/AThe project will determine the technical feasibility of developing state-of-the art information system technology for districts and schools that addresses the accountability, planning, management, and evaluation functions essential to achieving comprehensive education reform and increased productivity in education. This research and development effort aims to overcome the serious lack of informat ...
SBIR Phase I 1997 Department of Education -
Improved Source Location Using Sensor-Arrays
SBC: Cyltek, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation