You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Resilient Wayside Structures to Reduce Severity of Passenger Equipment Collisions and Derailments

    SBC: PROTECTION ENGINEERING CONSULTANTS LLC            Topic: 171FR3

    Proposal title: Resilient Wayside Structures to Reduce Severity of Passenger Equipment Collisions and Derailments Additional passenger fatalities/injuries can occur during derailments involving interaction with wayside structures. Analogously, automobile fatalities often result from interaction of vehicles with roadside structures; personnel hazard reduction is a key design criterion for roadsid ...

    SBIR Phase II 2018 Department of Transportation
  2. Improved Source Location Using Sensor-Arrays

    SBC: Cyltek, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  3. Transportable Off-Road Axle Detector (TOAD)

    SBC: Spectra Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  4. Broken Rail Detection

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  5. Pavement Ice Detection

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. Conundrum: A Project to Computerize the Comprehensive

    SBC: The Evans Associates            Topic: N/A

    CSMP is an exciting K-6 math program, designated as an "exemplary educational program that works¿ by the U.S. Department of Education, which funded its development, evaluation, and dissemination. Its spiral, problem solving approach uses picture languages, abaci, and technically challenging games. Simple problems subtly introduce sophisticated concepts. While class and teacher-student intera ...

    SBIR Phase I 1997 Department of Education
  7. User-Based Method to Evaluate and Improve Maintenance Manuals

    SBC: UES INC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. NEURAL NETWORK LANE CHANGE DETECTOR

    SBC: Exodyne Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  9. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  10. BLADDERS FOR SPILL CONTAINMENT

    SBC: Pasadyn Inc            Topic: N/A

    BLADDER TYPE DEVICES ARE USED TO MITIGATE FLUID LOSSES FROM RUPTURED STORAGE DEVICES.

    SBIR Phase I 1991 Department of Transportation
US Flag An Official Website of the United States Government