You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reverse Engineering Technical Data Packages for Development of Alternate Sources of Supply for DLA NSNs

    SBC: ORBIS SIBRO INC            Topic: DLA171002

    ORBIS proposes to Address SBIR DLA171-002 by developing efficient and effective processes to reverse engineer RPPOB Candidate Items. ORBIS has a wealth of experience in supporting DoD systems and components and is well suited to addressing the backlog of unsupported equipment .

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. Enhancing Administrator Coaching of Classroom Teachers

    SBC: Liveschool Inc.            Topic: 99190018R0005

    Purpose: In previous research and development, the team created LiveSchool, a technology for teachers to report student behavior in their class. In this project, the team will fully develop and test ClassCoach, a dashboard for administrators to track student behavior and to recommend resources teachers can use to address student behavioral needs in their classes. Over the past several years, schoo ...

    SBIR Phase II 2018 Department of EducationInstitute of Education Sciences
  3. Increase Competition through Small Business Source Approval Aircraft Launch and Recovery Equipment (ALRE) Critical Safety/Critical Application Items (CSI/CAI)

    SBC: Form Fit and Function LLC            Topic: DLA172001

    This SBIR Phase I proposal to the Defense Logistics Agency (DLA), requests funding for Form Fit and Function, LLC, a small disadvantaged, HUBZone Certified Business, to perform research in the development of an SAR package for NSN 3020-01-560-8493, Pulley, Groove.F3's proven experience in manufacturing and SAR package development, give F3 an advantage in development and decreases Government risk. ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Analysis, Identification, and Eradication of Mold Development in the Substance (Rations) Supply Chain

    SBC: ASSURED BIO LABS, LLC            Topic: DLA173001

    DLA Subsistence Supply Chain (SSC) experiences mold growth on wood pallets used for transportation of MRE. We propose a mold growth analysis and mitigation methodology based on supply chain, microbial monitoring and statistical techniques. The supply chain is modeled as a network of storage, production nodes and transportation links. A data collection procedure is developed to gather data related ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  5. SoldierBoost, Nutrient-Dense Soldier Food Bar Ration

    SBC: Systems & Materials Research Corporation            Topic: DLA163001

    Soldiers engaged in Sustained Operations can burn up to 6,000 kcal of energy per day, which cannot be compensated for by current rations - Meals, Ready-to-Eat and First Strike Rations only provide up to 3,750 kcal/day and 2,900 kcal/day, respectively. This energy debt is further aggravated by the fact that most soldiers "field strip" their rations, removing menu items that are undesirable, or that ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  6. Conundrum: A Project to Computerize the Comprehensive

    SBC: The Evans Associates            Topic: N/A

    CSMP is an exciting K-6 math program, designated as an "exemplary educational program that works¿ by the U.S. Department of Education, which funded its development, evaluation, and dissemination. Its spiral, problem solving approach uses picture languages, abaci, and technically challenging games. Simple problems subtly introduce sophisticated concepts. While class and teacher-student intera ...

    SBIR Phase I 1997 Department of Education
  7. AN AUDIO-VISUAL STIMULATION UNIT WITH EEG BIOFEEDBACK FOR ENHANCING COGNITIVE ABILITIES OF LEARNING DISABED BOYS

    SBC: Bio-educational Research Inc.            Topic: N/A

    THIS PROJECT WILL DEVELOP AN INEXPENSIVE, PORTABLE, ELECTROENCEPHALOGRAPH (EEG) BIOFEEDBACK UNIT THAT PROVIDES AUDIO AND VISUAL STIMULATION (AVS) AT BRAINWAVE FREQUENCIES TO AID IN THE TREATMENT OF LEARNING DISABLED (LD) SCHOOL CHILDREN WITH ATTENTION DEFICIT DISORDER (ADD) OR WITH ATTENTION DEFICIT HYPERACTIVITY DISORDER (ADHD). THE UNIT WILL BE EASY ENOUGH TO OPERATE, SO THAT COUNSELORS AT SCHOO ...

    SBIR Phase II 1994 Department of Education
  8. N/A

    SBC: STARFIRE ENGINEERING INC.            Topic: N/A

    WHEN IT IS NECESSARY TO RAISE A MARINE PIPELINE FOR REPAIR DUE TO TRAWLER SNAG, ETC., THE PIPELINE WILL BUCKLE, AND THEN THE BUCKLE WILL PROPAGATE IF ALL CONDITIONS ARE NOT PROPER. WITH SEVERE BUCKLES, THE PIPE WILL BREAK OPEN ALLOWING THE OIL TO SPILL. THIS CAN BE MINIMIZED BY PERIODICALLY PLACING REMOTELY OPERABLE VALVES IN THE LINE FOR CUTOFF. BUT SOMETIMES THE PIPELINE ROTATES AS IT IS BEING L ...

    SBIR Phase I 1983 Department of the Interior
  9. N/A

    SBC: TRADCO CHEMICAL CORPON            Topic: N/A

    USING RADIO TELEMETRY MODEMS, IS CURRENTLY POSSIBLE. THIS IS NECESSARY BECAUSE LACK OF MONITORING CAUSES INADEQUATE CONTROL OF INTERNAL CORROSION TAKING PLACE INSIDE OFFSHORE PIPELINE SYSTEMS. THE NET RESULT IS PIPELINE FAILURE DUE TOTHE EFFECTS OF CORROSION. THE RESULT OF PIPELINE FAILURE WILL BE AN OIL SPILL IN COASTAL WATERS. AS THE NATION'S OFFSHORE PIPELINE SYSTEM GROWS OLDER, THE NET EFFECTS ...

    SBIR Phase I 1983 Department of the Interior
US Flag An Official Website of the United States Government